Become a Dealer Blog
Register

Total Price

$0.00

Cart 0 Cart 0 Loading...

4112-485KV Turnigy Multistar 22 Pole Brushless Multi-Rotor Motor With Extra Long Leads

Generating Links

4112-485KV Turnigy Multistar 22 Pole Brushless Multi-Rotor Motor With Extra Long Leads

 
Price:

Now save save $0.00 $0.00

$42.18
Shipped From:
  • USA
Already Purchased Discontinued Product

Please continue searching for a similar product.
1 year warranty
SKU:
9392000035-0
want FREE shipping? Click here to find out more!

Looking for the ultimate power system for your next Multi-rotor project? Look no further!
The Turnigy Multistar outrunners are designed with one thing in mind - maximizing Multi-rotor performance! They feature high-end 45SH magnets, high quality NMB bearings and High Poles counts for less noise, smooth and responsive power and increased efficiency. They have custom motor mounting and all are precision balanced for smooth running, these motors are engineered specifically for multi-rotor use and are not based on airplane motors.

The 4112-485KV MultiStar is almost too nice to fly! The workmanship and detail in this motor is at a whole new level. It’s fitted with shimmed and pre-loaded NMB bearings and has 570mm long high grad silicon wires. It has dual prop mounting, either a bolt on 6mm shaft prop hub or the 12mm spacing bolt threw prop attachment with a precision upper thrust washer for an unlimited range of props. And with 22P24S pole count its smooth efficient and has loads of torque.

Multistar is simplifying the world of Multi-Rotors with their purpose built product line and taking the guess work out of your setup.

Specs:
KV(RPM/V): 485
Lipo cells: 4-8s
Max current: 700w
Max Amps: 28A
No Load Current: 1.1A/10v
Internal Resistance: .09ohm
Number of Poles: 22P24S (22poles 24 stators)
Dimensions(Dia.xL):46.6 x 29.8mm
Motor Shaft:5mm
prop shaft: 6mm bolt on hub or 12mm hole to hole for bolt threw style props
Weight: 147g
bolt hole spacing: 19mm * 25mm

  • Kv(rpm/v) 485.00
  • Max Current (Motor) (A) 28.00
  • Resistance (mh) 172.00
  • Max Voltage (V) 30.00
  • Power (W) 700.00
  • Shaft A(mm) 5.00
  • Length B (mm) 30.00
  • Can Diameter C(mm) 47.00
  • Can Length D(mm) 15.00
  • Total Length E(mm) 40.00
attributeset-10
Close

Dimension Diagram Guide

  • attributeset-10

Close

Upload video

Only registered users can upload video. Please, log in or register

Topics
Sort by
Most Recent Topics
* Nickname:

* Your Reply:


Please, enter the text shown in the image into the field below
*Verification Code:
Cancel
Submit
Post a new Topic
* Nickname:

* Your Topic:



Please, enter the text shown in the image into the field below
*Verification Code:
Post Topic

Only registered users can write reviews. Please, sign in or sign up

Customer files
4112-485kv prop and thrust data Download [267]
Upload your file

Only registered users can upload files.
Please log in or register to start helping your fellow hobbyists today!

Related Tags