注册

Product Finder

设置

Useful links

 
[["US","AU","GB","DE"]]
注册
Shipped From:
  • Global

3508-700KV Turnigy 14多星极无刷多转子电机,超长信息

3508-700KV Turnigy 14多星极无刷多转子电机,超长信息

QTY:

Now save 保存 AU$ 0.00 AU$ 0.00

AU$ 40.59
Rating:
Stock:
重量:
157
SKU:
9392000024-0

Price War

acc
产品介绍

寻找你的下一个多旋翼飞行器项目最终的动力系统?不要再观望!
该Turnigy多星outrunners是设计时考虑的一件事 - 最大限度地提高飞行器的性能!它们的特点是高端45SH磁铁,高品质NMB轴承和高极数较少噪音,平稳,响应能力和更高的效率。他们有自定义的电机装配和流畅的运行平衡都是精密,这些电机的多旋翼飞行器使用专门设计的,不基于飞机马达。

该3508-700KV多星几乎是太好飞!在这种电机的做工和细节是在一个全新的水平。它配备了匀和预加载NMB轴承,具有570毫米长高毕业生硅线。它拥有双螺旋桨安装,无论是在6mm轴道具毂螺栓或12mm的间距螺栓投用精密的上推力垫圈道具附件为无限范围的道具。并与14P12S极指望其流畅高效,具有扭矩载荷。

多星正在简化多转子的世界,他们的目的建造的产品线,并采取了猜测工作在设置中排除。

眼镜:
KV(RPM / V):700
锂聚合物电池:3-4s
最大电流:360瓦特
最大安培:28A
空载电流:0.5A / 10V
内阻:.083ohm
极数:14P12S(14poles 12定子)
外形尺寸(Dia.xL):43点¯x26毫米
电机轴为4mm
支撑轴:6毫米螺栓上的集线器或12毫米孔对孔螺栓投掷道具风格
重量:102克
螺栓孔间距:19毫米*25毫米

Product
Specifications

额外信息

  • 商品编号:
    9392000024-0
  • Brand:
    MultiStar
  • 重量(g)
    157.00
  • 长度
    85.00
  • 宽:
    45.00
  • 高度:
    60.00
  • 千伏(转/ v)的
    700.00
  • 最大电流( A)
    28.00
  • 功率(W):
    360.00
  • 长度B (毫米):
    26.00
  • 可以长深(mm )
    10.00
  • 最大电压(V)
    0.00
  • 轴(MM):
    4.00
  • Unit Weight (g):
    102
  • 直径C(毫米)
    42.00
  • 总长度E(毫米)
    36.00
  • 电阻( MH):
    0.00
Community
Discussions
Rate&
Review

撰写您自己的评测

Only registered users can write reviews. Please, sign in or sign up

verified_user Quality
trending_up Value
playlist_add_check Overall
This motor is pretty good and proper KV for 600-700 class Multicopter.
I installed this in my Tarrot 650 X-copter. with 12x4.5 and 11x4.5 APC prop.
Both setting of them works well. But 12-inch prop is better, It's more power.
I uses Hobbywing X-Rotor ESC - 40amp. Because it has connector on it's board, it's well fit with this motor's long load(it's good point also).
But, I think the quality of the bearing is quite poor. Some fall-off make the bearing get bad. But I recommend this motor for the 600-700 class multicopter strongly.
It's quite good.
verified_user Quality
trending_up Value
playlist_add_check Overall
verified_user Quality
trending_up Value
playlist_add_check Overall
very nice motors. Running on a 2300grams tarot 690 hexa. 3s and 13x5.5 propps. current is 20-27amps hovering in very windy weather.
got 12 mins on 6000mah 3s

I have been using Afro esc. Got sync issue on one esc and had to reflash to the latest 2013-10-.. firmware. Now i got 30 minutes in the fram from schratch build and all working very well!
verified_user Quality
trending_up Value
playlist_add_check Overall
verified_user Quality
trending_up Value
playlist_add_check Overall
No mounting screws, that's a bit strange. Every other motor I have purchased from Hobbyking includes them so didn't thinks twice. With hindsight I should have picked it up from the photos. Hindsight is a wonderful thing.
verified_user Quality
trending_up Value
playlist_add_check Overall
Upload
Videos
  • MultiStar Motors

Upload
Files

Only registered users can upload files. Please log in or register to start helping your fellow hobbyists today!

acc

产品标签

使用空格分隔标签。使用单引号(')标注词组。