注册

Product Finder

设置

Useful links

 
[["US","AU","GB","DE"]]
注册
Shipped From:
  • Global

4108-380KV Turnigy 22多星极无刷多转子电机,超长信息

4108-380KV Turnigy 22多星极无刷多转子电机,超长信息

Now save 保存 AU$ 0.00 AU$ 0.00

AU$ 40.15
缺货!
Rating:
Stock:
OUT OF STOCK
重量:
170
SKU:
9392000030-0

Price War

acc
产品介绍

寻找你的下一个多旋翼飞行器项目最终的动力系统?不要再观望!
该Turnigy多星outrunners是设计时考虑的一件事 - 最大限度地提高飞行器的性能!它们的特点是高端45SH磁铁,高品质NMB轴承和高极数较少噪音,平稳,响应能力和更高的效率。他们有自定义的电机装配和流畅的运行平衡都是精密,这些电机的多旋翼飞行器使用专门设计的,不基于飞机马达。

该4108-380kv多星几乎是太好飞!在这种电机的做工和细节是在一个全新的水平。它配备了匀和预加载NMB轴承,具有570毫米长高毕业生硅线。它拥有双螺旋桨安装,无论是在6mm轴道具毂螺栓或12mm的间距螺栓投用精密的上推力垫圈道具附件为无限范围的道具。并与22P24S极指望其流畅高效,具有扭矩载荷。

多星正在简化多转子的世界,他们的目的建造的产品线,并采取了猜测工作在设置中排除。

眼镜:
KV(RPM / V):380
锂聚合物电池:4-6s
最大电流:360瓦特
最大安培:17A
空载电流:0.5A / 10V
内阻:.225ohm
极数:22P24S(22poles 24定子)
外形尺寸(Dia.xL): 只有47 x26毫米
电机轴端:4mm
支撑轴:6毫米螺栓上的集线器或12毫米孔对孔螺栓投掷道具风格
重量:111克
螺栓孔间距:19毫米*25毫米

Product
Specifications

额外信息

  • 商品编号:
    9392000030-0
  • Brand:
    MultiStar
  • 重量(g)
    170.00
  • 长度
    85.00
  • 宽:
    45.00
  • 高度:
    60.00
  • 千伏(转/ v)的
    380.00
  • 最大电流( A)
    17.00
  • 功率(W):
    360.00
  • 长度B (毫米):
    26.00
  • 可以长深(mm )
    12.00
  • 最大电压(V)
    0.00
  • 轴(MM):
    4.00
  • Unit Weight (g):
    111
  • 直径C(毫米)
    47.00
  • 总长度E(毫米)
    36.00
  • 电阻( MH):
    0.00
Community
Discussions
Rate&
Review

撰写您自己的评测

Only registered users can write reviews. Please, sign in or sign up

Quality
Value
Overall
These motors when they work properly are great. However there is some serious QC issues with them. 2 out of the 4 motors I ordered have loose bearings which produce a loud rattling noise when I throttle up.

Quite disappointed considering others have a better experience with them.
Quality
Value
Overall
Quality
Value
Overall
Great motors! I am using 8 of them on a modified Tarot 650 Iron Man in an X8 configuration, spinning 15 x 5.5 CF T-style props (with the included adapters!) on a 4S setup with 2 25 amp Q-Brains in a stack on a third center plate mounted on the bottom. NAZA V2 and a OrangeRX 7ch RX.

With a pair of top-mounted Multistar 10c 8000mah 4S batteries, I am getting 27 minutes of flight time. Highly recommended!

Search for "Tarot 650 Triple Decker X8" to see the whole build at RCgroups.
Quality
Value
Overall
Quality
Value
Overall
Wow have 4 of these, my quad flies awesome,
Very quiet, smooth and vibration free, will definitely buy more!
Quality
Value
Overall
Upload
Videos
Upload
Files

Only registered users can upload files. Please log in or register to start helping your fellow hobbyists today!

acc

产品标签

使用空格分隔标签。使用单引号(')标注词组。