注册

Product Finder

设置

Useful links

 
[["US","AU","GB","DE"]]
注册
Shipped From:
  • Global
  • USA

4108-480KV Turnigy 22多星极无刷多转子电机,超长信息

4108-480KV Turnigy 22多星极无刷多转子电机,超长信息

QTY:

Now save 保存 AU$ 0.00 AU$ 0.00

AU$ 41.23
Rating:
Stock:
重量:
169
SKU:
9392000031-0

Price War

acc
产品介绍

寻找你的下一个多旋翼飞行器项目最终的动力系统?不要再观望!
该Turnigy多星outrunners是设计时考虑的一件事 - 最大限度地提高飞行器的性能!它们的特点是高端45SH磁铁,高品质NMB轴承和高极数较少噪音,平稳,响应能力和更高的效率。他们有自定义的电机装配和流畅的运行平衡都是精密,这些电机的多旋翼飞行器使用专门设计的,不基于飞机马达。

该4108-480kv多星几乎是太好飞!在这种电机的做工和细节是在一个全新的水平。它配备了匀和预加载NMB轴承,具有570毫米长高毕业生硅线。它拥有双螺旋桨安装,无论是在6mm轴道具毂螺栓或12mm的间距螺栓投用精密的上推力垫圈道具附件为无限范围的道具。并与22P24S极指望其流畅高效,具有扭矩载荷。

多星正在简化多转子的世界,他们的目的建造的产品线,并采取了猜测工作在设置中排除。

眼镜:
KV(RPM / V):480
锂聚合物电池:4-6s
最大电流:380瓦特
最大安培:22A
空载电流:0.6A / 10V
内阻:.0128ohm
极数:22P24S(22poles 24定子)
外形尺寸(Dia.xL): 只有47 x26毫米
电机轴端:4mm
支撑轴:6毫米螺栓上的集线器或12毫米孔对孔螺栓投掷道具风格
重量:111克
螺栓孔间距:19毫米*25毫米

Product
Specifications

额外信息

  • 商品编号:
    9392000031-0
  • Brand:
    MultiStar
  • 重量(g)
    169.00
  • 长度
    85.00
  • 宽:
    45.00
  • 高度:
    60.00
  • 千伏(转/ v)的
    480.00
  • 最大电流( A)
    22.00
  • 功率(W):
    380.00
  • 长度B (毫米):
    26.00
  • 可以长深(mm )
    12.00
  • 最大电压(V)
    0.00
  • 轴(MM):
    4.00
  • Unit Weight (g):
    111
  • 直径C(毫米)
    27.00
  • 总长度E(毫米)
    36.00
  • 电阻( MH):
    0.00
Community
Discussions
Rate&
Review

撰写您自己的评测

Only registered users can write reviews. Please, sign in or sign up

Quality
Value
Overall
no way to get it work. i have desync issue with 5/5 of theese motors. I tried with different escs, simonk an blheli and every time in certain rpm range the motor produces a loud sound and randomly stops. Very dangerous.
Quality
Value
Overall
Quality
Value
Overall
muy buenos moteres gran fuerza al despege, les doy caa dia si dia no y todavia sin fallos toquemos madera los recomiendo
Quality
Value
Overall
Quality
Value
Overall
Nice build quality. Very smooth rotation. No flaws upon receipt. All hardware is of good quality.
Quality
Value
Overall
Quality
Value
Overall
Purchased three of these motors for a Tricopter due to lack of time I started to work on this set up four months later and realized one of these motors arrived with broken ball bearing. The other two motors look and work perfect.
Motor with defective bearing is getting stuck when rotated by hand so now I will have to look for the replacement parts for the never used motor.
HK please pay attention to these small details during your QC.
Thanks.
Quality
Value
Overall
Quality
Value
Overall
Excellent motors for the price. Very smooth and efficient . Installed with 14" 4.5 t-props , 30A esc , Tarot FY650 , Tarot gimbal with GP3 , Naz M ,5000mAh 4s 25c, total weight 2.3kg . 15 minutes flight time ,low voltage warning set at 14.2v. Much better than the old multistar 4822 . Absolutely recommend these for your next quad build.
Quality
Value
Overall
Quality
Value
Overall
This motor seems to be perfect for my Talon Tricopter with extended booms. Weight of my tricopter is 1965g (including battery, GoPro 3 brushless gimbal) and I'm able to hover little bit over 21 minutes! (10pcnt of battery left). Hover @ 45~55pcnt throttle. My configuration is Talon Tricopter frame, 380 mm Carbon Fibre booms, Turnigy Multistar 4108-480KV motors, 15x5.5 DJI propellers, Turnigy 20A multistar ESCs with SimonK firmware, TGY-306G servo, ZIPPY Compact 5800mAh 4S 25C, Crius AIOP board with MegapirateNG firmware. I'm definitely gonna use these motors in my futher copters.
Quality
Value
Overall
Upload
Videos
  • Hexcopter Endurance Test

Upload
Files

Only registered users can upload files. Please log in or register to start helping your fellow hobbyists today!

acc

产品标签

使用空格分隔标签。使用单引号(')标注词组。