注册

Product Finder

设置

Useful links

Live Chat
 
[["US","AU","GB","DE"]]
注册
Shipped From:
  • USA
  • Global

4112-320KV Turnigy 22多星极无刷多转子电机,超长信息

4112-320KV Turnigy 22多星极无刷多转子电机,超长信息

QTY:

Now save 保存 AU$ 0.00 AU$ 0.00

AU$ 57.67
Rating:
Stock:
重量:
213
SKU:
9392000033-0

Price War

acc
产品介绍

寻找你的下一个多旋翼飞行器项目最终的动力系统?不要再观望!
该Turnigy多星outrunners是设计时考虑的一件事 - 最大限度地提高飞行器的性能!它们的特点是高端45SH磁铁,高品质NMB轴承和高极数较少噪音,平稳,响应能力和更高的效率。他们有自定义的电机装配和流畅的运行平衡都是精密,这些电机的多旋翼飞行器使用专门设计的,不基于飞机马达。

该4112-320KV多星几乎是太好飞!在这种电机的做工和细节是在一个全新的水平。它配备了匀和预加载NMB轴承,具有570毫米长高毕业生硅线。它拥有双螺旋桨安装,无论是在6mm轴道具毂螺栓或12mm的间距螺栓投用精密的上推力垫圈道具附件为无限范围的道具。并与22P24S极指望其流畅高效,具有扭矩载荷。

多星正在简化多转子的世界,他们的目的建造的产品线,并采取了猜测工作在设置中排除。

眼镜:
KV(RPM / V):320
锂聚合物电池:4-8s
最大功率:660W
最大安培:20A
空载电流:0.5A / 10V
内阻:.172ohm
极数:22P24S(22poles 24定子)
外形尺寸(Dia.xL):46.6点¯x29.8毫米
电机轴:5毫米
支撑轴:6毫米螺栓上的集线器或12毫米孔对孔螺栓投掷道具风格
重量:147克
螺栓孔间距:19毫米*25毫米

Product
Specifications

额外信息

  • 商品编号:
    9392000033-0
  • Brand:
    MultiStar
  • 重量(g)
    213.00
  • 长度
    85.00
  • 宽:
    45.00
  • 高度:
    60.00
  • 千伏(转/ v)的
    320.00
  • 最大电流( A)
    20.00
  • 功率(W):
    660.00
  • 长度B (毫米):
    30.00
  • 可以长深(mm )
    15.00
  • 最大电压(V)
    0.00
  • 轴(MM):
    5.00
  • Unit Weight (g):
    147
  • 直径C(毫米)
    47.00
  • 总长度E(毫米)
    40.00
  • 电阻( MH):
    0.00
Community
Discussions
Rate&
Review

撰写您自己的评测

Only registered users can write reviews. Please, sign in or sign up

verified_user Quality
trending_up Value
playlist_add_check Overall
You can't touch these for 40 bucks. I have more than 3 dozen flying in a bunch of different frames and NONE have ever failed. Take a 680 pro Tarot frame, 6 of these, 6 opto 45 amp esc's and a 5000 mah nano-tech battery, 14x5.5 props and it gets 19 minutes of time flying, not hovering. Even with a gimbal, it still gets close to 15. It would run much larger props but not on this frame, 14 is it. They will lift most anything and 8 of them on a 1140mm frame makes a super stable photography platform. With a WooKong controller and a decent camera, hollyweird quality pictures. Just right KV for 6S. Runs way under 90 degrees F. Easy on esc's. Work great on a split power system at 8S. So far everything we have tried has worked. I have sunnysky and T-motors as well as DJI, all good, all more expensive and none lasted any longer or performed better. You could say we like these!
verified_user Quality
trending_up Value
playlist_add_check Overall
verified_user Quality
trending_up Value
playlist_add_check Overall
I have purchase much more expensive outrunners in the past. Six of these with 16x5.5 props EASILY lifts my 1203mm hex (custom built) at 6.6kg. With 2 Zippy 8000mah batts I get 15 to over 20 mins. of time in the air. I will be testing 4 Turnigy-nano 5000 mah batts. (total weight less than the Zippys). Should get more time in the air. 4 hard test flights and the motors are performing very well. Just slightly warm to the touch after 15 mins.
verified_user Quality
trending_up Value
playlist_add_check Overall
verified_user Quality
trending_up Value
playlist_add_check Overall
Very strong motor! Great for big projects using 6s.
The main concern is about the build process. After using this motors I figure out that some vibration sounds that I was listening, is because some washer was not in the right place making the external part of the motor jump up and down causing the noise.
If you have this motor MAKE SURE to check the internal washers. In all of my 6 motors, 5 of them was missing whashers or they were not in the right place!
verified_user Quality
trending_up Value
playlist_add_check Overall
verified_user Quality
trending_up Value
playlist_add_check Overall
Two out of four failed within 2 hours of flight. Loose magnets on one and improper shimming on the other. HK is sending me replacements when they get back in stock. When working correctly they can lift a house.
verified_user Quality
trending_up Value
playlist_add_check Overall
Upload
Videos
Upload
Files

Only registered users can upload files. Please log in or register to start helping your fellow hobbyists today!

acc

产品标签

使用空格分隔标签。使用单引号(')标注词组。