New Items Novinky Fórum
Registrovat

Total Price

0,00 €

Cart 0 Cart 0 Loading...

4010-375KV Turnigy Multistar 22 Pole Brushless Multi-Rotor Motor With Extra Long Leads

4010-375KV Turnigy Multistar 22 Pole Brushless Multi-Rotor Motor With Extra Long Leads

Shipped From:
  • Global
QTY:

Now save Uložit 0,00 € 0,00 €

38,56 €
Stav:
Skladem
SKU:
9392000025-0
WANT FREE SHIPPING? Click here to find out more!

Looking for the ultimate power system for your next Multi-rotor project? Look no further!

The Turnigy Multistar outrunners are designed with one thing in mind - maximizing Multi-rotor performance! They feature high-end 45SH magnets, high-quality NMB bearings and High Poles counts for less noise, smooth and responsive power and increased efficiency. They have custom motor mounting and all are precision balanced for smooth running, these motors are engineered specifically for multi-rotor use and are not based on airplane motors.

The 4010-375KV MultiStar is almost too nice to fly! The workmanship and detail in this motor is at a whole new level. It’s fitted with shimmed and pre-loaded NMB bearings and has 570mm long high-grade silicon wires. It has dual prop mounting, either a bolt-on 6mm shaft prop hub or the 12mm spacing bolt threw prop attachment with a precision upper thrust washer for an unlimited range of props. And with 22P24S pole count its smooth efficient and has loads of torque.

Multistar is simplifying the world of Multi-Rotors with their purpose built product line and taking the guesswork out of your setup.

Specs:
KV(RPM/V): 375
Lipo cells: 4-6S
Max current: 450W
Max Amps: 20A
No Load Current: 0.6A/10V
Internal Resistance: .134ohm
Number of Poles: 22P24S (22poles 24 stators)
Dimensions(Dia.xL):45 x 28mm
Motor Shaft: 4mm
Prop shaft: 6mm bolt on hub or 12mm hole to hole for bolt through style props
Weight: 128g
bolt hole spacing: 19mm x 25mm

  • SKU 9392000025-0
  • Brand MultiStar
  • Hmotnost 190.0000
  • Délka 85.00
  • Packaging Width 45.00
  • Výška 60.00
  • Kv (rpm / v) 375.00
  • Maximální proudy (A) 20.00
  • Odpor ( mh) 134.00
  • Maximální napětí ( V) 25.00
  • Výkon ( W ) 450.00
  • Hřídel A ( mm ) 4.00
  • Délka B ( mm ) 28.00
  • Průměr C ( mm ) 45.00
  • Může Délka D ( mm ) 13.00
  • Celková délka E ( mm ) 39.00
Upload video

Only registered users can upload video. Please, log in or register

Only registered users can write reviews. Please, sign in or sign up

Customer files
4010-375kv thrust data Download [184]
Upload your file

Only registered users can upload files.
Please log in or register to start helping your fellow hobbyists today!

Radio Control Planes, Drones, Cars, FPV, Quadcopters and more - Hobbyking