New Items Fórum
Registrovat

Total Price

0,00 €

Cart 0 Cart 0 Loading...

4014-320KV Turnigy Multistar 22 Pole Brushless Multi-Rotor Motor With Extra Long Leads

4014-320KV Turnigy Multistar 22 Pole Brushless Multi-Rotor Motor With Extra Long Leads

Shipped From:
  • Global
QTY:

Now save Uložit 0,00 € 0,00 €

44,14 €
Stav:
Skladem
SKU:
9392000028-0
WANT FREE SHIPPING? Click here to find out more!

Looking for the ultimate power system for your next Multi-rotor project? Look no further!
The Turnigy Multistar outrunners are designed with one thing in mind - maximizing Multi-rotor performance! They feature high-end 45SH magnets, high quality NMB bearings and High Poles counts for less noise, smooth and responsive power and increased efficiency. They have custom motor mounting and all are precision balanced for smooth running, these motors are engineered specifically for multi-rotor use and are not based on airplane motors.

The 4014-320KV MultiStar is almost too nice to fly! The workmanship and detail in this motor is at a whole new level. It’s fitted with shimmed and pre-loaded NMB bearings and has 570mm long high grad silicon wires. It has dual prop mounting, either a bolt on 6mm shaft prop hub or the 12mm spacing bolt threw prop attachment with a precision upper thrust washer for an unlimited range of props. And with 22P24S pole count its smooth efficient and has loads of torque.

Multistar is simplifying the world of Multi-Rotors with their purpose built product line and taking the guess work out of your setup.

Specs:
KV(RPM/V): 320
Lipo cells: 4-8s
Max current: 720w
Max Amps: 26A
No Load Current: 0.7A/10v
Internal Resistance: .102ohm
Number of Poles: 22P24S (22poles 24 stators)
Dimensions(Dia.xL):45 x 32mm
Motor Shaft: 5mm
prop shaft: 6mm bolt on hub or 12mm hole to hole for bolt threw style props
Weight: 163g
bolt hole spacing: 19mm * 25mm

  • SKU 9392000028-0
  • Brand MultiStar
  • Hmotnost 230.0000
  • Délka 85.00
  • Width 45.00
  • Výška 60.00
  • Kv (rpm / v) 320.00
  • Maximální proudy (A) 26.00
  • Odpor ( mh) 172.00
  • Maximální napětí ( V) 30.00
  • Výkon ( W ) 720.00
  • Hřídel A ( mm ) 5.00
  • Délka B ( mm ) 32.00
  • Průměr C ( mm ) 45.00
  • Může Délka D ( mm ) 16.00
  • Celková délka E ( mm ) 42.00
  • MultiStar Motors
Upload video

Only registered users can upload video. Please, log in or register

Only registered users can write reviews. Please, sign in or sign up

Good motor, average quality, the propeller adapter on my motor broken just after 3 flight, recommended using direct mounting prop, machining quality is average, good value for money but needed more quality control,,

verified_user Quality:
trending_up Value:
playlist_add_check Overall:

Good motor, average quality, the propeller adapter on my motor broken just after 3 flight, recommended using direct mounting prop, machining quality is average, good value for money but needed more quality control,,

Upload your file

Only registered users can upload files.
Please log in or register to start helping your fellow hobbyists today!