Registrovat

Product Finder

Nastavení

Useful links

Live Chat
 
[["US","AU","GB","DE"]]
Registrovat
Shipped From:
  • USA
  • Global

4108-480KV Turnigy Multistar 22 Pole Brushless Multi-Rotor Motor With Extra Long Leads

4108-480KV Turnigy Multistar 22 Pole Brushless Multi-Rotor Motor With Extra L...

QTY:

Now save Uložit 0,00 € 0,00 €

29,63 €
Stock:
Váha:
169 g
SKU:
9392000031-0

Suggestion Box

Please let us know if you found any issues with this product listing.
We take our customer comments very seriously and in many cases our website modifications and product updates are a result of your comments!

Price War

If you've seen a product elsewhere for a better price, please let us know! HobbyKing pride themselves on offering the best price, so if there if you see something cheaper elsewhere, let us know!

Combine

essential items and
acc
Popis
produktu

Looking for the ultimate power system for your next Multi-rotor project? Look no further!
The Turnigy Multistar outrunners are designed with one thing in mind - maximizing Multi-rotor performance! They feature high-end 45SH magnets, high quality NMB bearings and High Poles counts for less noise, smooth and responsive power and increased efficiency. They have custom motor mounting and all are precision balanced for smooth running, these motors are engineered specifically for multi-rotor use and are not based on airplane motors.

The 4108-480kv MultiStar is almost too nice to fly! The workmanship and detail in this motor is at a whole new level. It’s fitted with shimmed and pre-loaded NMB bearings and has 570mm long high grad silicon wires. It has dual prop mounting, either a bolt on 6mm shaft prop hub or the 12mm spacing bolt threw prop attachment with a precision upper thrust washer for an unlimited range of props. And with 22P24S pole count its smooth efficient and has loads of torque.

Multistar is simplifying the world of Multi-Rotors with their purpose built product line and taking the guess work out of your setup.

Specs:
KV(RPM/V): 480
Lipo cells: 4-6s
Max current: 380w
Max Amps: 22A
No Load Current: 0.6A/10v
Internal Resistance: .0128ohm
Number of Poles: 22P24S (22poles 24 stators)
Dimensions(Dia.xL):47 x 26mm
Motor Shaft: 4mm
prop shaft: 6mm bolt on hub or 12mm hole to hole for bolt threw style props
Weight: 111g
bolt hole spacing: 19mm * 25mm

Product
Specifications

Další informace

  • SKU:
    9392000031-0
  • Brand:
    MultiStar
  • Hmotnost ( g )
    169.00
  • Délka
    85.00
  • Width:
    45.00
  • Výška:
    60.00
  • Kv (rpm / v)
    480.00
  • Maximální proudy (A)
    22.00
  • Výkon ( W ):
    380.00
  • Délka B ( mm ):
    26.00
  • Může Délka D ( mm )
    12.00
  • Maximální napětí ( V)
    0.00
  • Hřídel A ( mm ):
    4.00
  • Unit Weight (g):
    111
  • Průměr C ( mm )
    27.00
  • Celková délka E ( mm )
    36.00
  • Odpor ( mh):
    0.00
Community
Discussions
Rate&
Review

Napište vlastní recenzi

Only registered users can write reviews. Please, sign in or sign up

verified_user Quality
trending_up Value
playlist_add_check Overall
no way to get it work. i have desync issue with 5/5 of theese motors. I tried with different escs, simonk an blheli and every time in certain rpm range the motor produces a loud sound and randomly stops. Very dangerous.
verified_user Quality
trending_up Value
playlist_add_check Overall
verified_user Quality
trending_up Value
playlist_add_check Overall
muy buenos moteres gran fuerza al despege, les doy caa dia si dia no y todavia sin fallos toquemos madera los recomiendo
verified_user Quality
trending_up Value
playlist_add_check Overall
verified_user Quality
trending_up Value
playlist_add_check Overall
Nice build quality. Very smooth rotation. No flaws upon receipt. All hardware is of good quality.
verified_user Quality
trending_up Value
playlist_add_check Overall
verified_user Quality
trending_up Value
playlist_add_check Overall
Purchased three of these motors for a Tricopter due to lack of time I started to work on this set up four months later and realized one of these motors arrived with broken ball bearing. The other two motors look and work perfect.
Motor with defective bearing is getting stuck when rotated by hand so now I will have to look for the replacement parts for the never used motor.
HK please pay attention to these small details during your QC.
Thanks.
verified_user Quality
trending_up Value
playlist_add_check Overall
verified_user Quality
trending_up Value
playlist_add_check Overall
Excellent motors for the price. Very smooth and efficient . Installed with 14" 4.5 t-props , 30A esc , Tarot FY650 , Tarot gimbal with GP3 , Naz M ,5000mAh 4s 25c, total weight 2.3kg . 15 minutes flight time ,low voltage warning set at 14.2v. Much better than the old multistar 4822 . Absolutely recommend these for your next quad build.
verified_user Quality
trending_up Value
playlist_add_check Overall
verified_user Quality
trending_up Value
playlist_add_check Overall
This motor seems to be perfect for my Talon Tricopter with extended booms. Weight of my tricopter is 1965g (including battery, GoPro 3 brushless gimbal) and I'm able to hover little bit over 21 minutes! (10pcnt of battery left). Hover @ 45~55pcnt throttle. My configuration is Talon Tricopter frame, 380 mm Carbon Fibre booms, Turnigy Multistar 4108-480KV motors, 15x5.5 DJI propellers, Turnigy 20A multistar ESCs with SimonK firmware, TGY-306G servo, ZIPPY Compact 5800mAh 4S 25C, Crius AIOP board with MegapirateNG firmware. I'm definitely gonna use these motors in my futher copters.
verified_user Quality
trending_up Value
playlist_add_check Overall
Upload
Videos
  • Hexcopter Endurance Test

Upload video
Upload
Files

Only registered users can upload files. Please log in or register to start helping your fellow hobbyists today!

Combine

essential items and
acc

Štítky produktu

Štítky oddělujte mezerou. Víceslovné uzavřete v apostrofech (').