Registrieren

Product Finder

Einstellungen

Useful links

 
[["US","AU","GB","DE"]]
Registrieren
Shipped From:
  • Global

3508-700KV Turnigy Multistar 14 Pole Brushless Multi-Rotor-Motor mit extralange Leads

3508-700KV Turnigy Multistar 14 Pole Brushless Multi-Rotor-Motor mit extralan...

QTY:

Now save Speichern 0,00 € 0,00 €

26,99 €
Stock:
Gewicht:
157 g
SKU:
9392000024-0

Suggestion Box

Please let us know if you found any issues with this product listing.
We take our customer comments very seriously and in many cases our website modifications and product updates are a result of your comments!

Price War

If you've seen a product elsewhere for a better price, please let us know! HobbyKing pride themselves on offering the best price, so if there if you see something cheaper elsewhere, let us know!

Combine

essential items and
acc
Product
Description

Der Suche nach dem ultimativen Power-System für Ihre nächste Multi-Rotor-Projekt? Suchen Sie nicht weiter!
Die Turnigy Multistar outrunners sind mit einer Sache im Auge - Multi-Rotor Leistung zu maximieren! Sie verfügen über High-End-45SH Magneten, hochwertige NMB Lager und hohe Polen zählt für weniger Lärm, glatt und reaktionsschnelle Leistung und höhere Effizienz. Sie verfügen über benutzerdefinierte Motormontage und alle sind Präzision für reibungslosen Ablauf ausgeglichen sind diese Motoren entwickelt, die speziell für Multirotor-Einsatz und werden auf Flugzeugmotoren basieren.

Die 3508-700KV Multistar ist fast zu schön, zu fliegen! Die Verarbeitung und Detail in diesem Motor ist auf eine ganz neue Ebene. Es ist mit Legte und vorinstalliertes NMB Lagern ausgestattet und verfügt über 570mm lang hohe grad Silizium Drähte. Es verfügt über Doppelstütze Montage, entweder ein Bolzen auf 6mm Welle Propellernabe oder der 12mm Abstand Schraube warf prop Befestigung mit einer Druckscheibe Präzision obere für eine unbegrenzte Auswahl an Requisiten. Und mit 14P12S Pol zählen seine glatte effizient und hat jede Menge Drehmoment.

Multistar vereinfacht die Welt der Multi-Rotoren mit ihren Zweck Produktlinie gebaut und nehmen die Vermutung ausarbeiten von Ihrem Setup.

Specs:
KV (RPM / V): 700
Lipo - Zellen: 3-4s
Max Strom: 360W
Max Ampere: 28A
Nein Ladestrom: 0,5 A / 10 V
Interner Widerstand: .083ohm
Anzahl der Pole: 14P12S (14poles 12 Statoren)
Abmessungen (Dia.xL): 43 x 26 mm
Motorwelle: 4 mm
Kardanwelle: 6mm Bolzen an der Nabe oder 12mm Loch zu Loch für Schraube Stil Requisiten warf
Gewicht: 102 g
Schraubenlochabstand: 19mm * 25mm

Product
Specifications

Zusätzliche Information

  • Artikelnummer:
    9392000024-0
  • Brand:
    MultiStar
  • Gewicht ( g)
    157.00
  • Länge
    85.00
  • Breite:
    45.00
  • Höhe:
    60.00
  • Kv (rpm / v)
    700.00
  • Max Currents (A)
    28.00
  • Leistung ( W):
    360.00
  • Länge B (mm):
    26.00
  • Kann Länge D (mm)
    10.00
  • Max Spannung (V)
    0.00
  • Welle A ( mm):
    4.00
  • Unit Weight (g):
    102
  • Durchmesser C (mm)
    42.00
  • Gesamtlänge E ( mm)
    36.00
  • Widerstand ( mh):
    0.00
Community
Discussions
Rate&
Review

Schreiben Sie Ihr eigenes Review

Only registered users can write reviews. Please, sign in or sign up

verified_user Quality
trending_up Value
playlist_add_check Overall
This motor is pretty good and proper KV for 600-700 class Multicopter.
I installed this in my Tarrot 650 X-copter. with 12x4.5 and 11x4.5 APC prop.
Both setting of them works well. But 12-inch prop is better, It's more power.
I uses Hobbywing X-Rotor ESC - 40amp. Because it has connector on it's board, it's well fit with this motor's long load(it's good point also).
But, I think the quality of the bearing is quite poor. Some fall-off make the bearing get bad. But I recommend this motor for the 600-700 class multicopter strongly.
It's quite good.
verified_user Quality
trending_up Value
playlist_add_check Overall
verified_user Quality
trending_up Value
playlist_add_check Overall
very nice motors. Running on a 2300grams tarot 690 hexa. 3s and 13x5.5 propps. current is 20-27amps hovering in very windy weather.
got 12 mins on 6000mah 3s

I have been using Afro esc. Got sync issue on one esc and had to reflash to the latest 2013-10-.. firmware. Now i got 30 minutes in the fram from schratch build and all working very well!
verified_user Quality
trending_up Value
playlist_add_check Overall
verified_user Quality
trending_up Value
playlist_add_check Overall
No mounting screws, that's a bit strange. Every other motor I have purchased from Hobbyking includes them so didn't thinks twice. With hindsight I should have picked it up from the photos. Hindsight is a wonderful thing.
verified_user Quality
trending_up Value
playlist_add_check Overall
Upload
Videos
  • MultiStar Motors

Upload video
Upload
Files

Only registered users can upload files. Please log in or register to start helping your fellow hobbyists today!

Customer files
3508-700kv thrust data download now [169kb]

Combine

essential items and
acc

Produkttags

Verwenden Sie Leerzeichen um Tags zu trennen. Verwenden Sie Apostrophe (') für Phrasen.