Registrieren

Product Finder

Einstellungen

Useful links

Live-Chat
 
[["US","AU","GB","DE"]]
Registrieren
Shipped From:
  • Global

4108-380KV Turnigy Multistar 22 Pole Brushless Multi-Rotor-Motor mit extralange Leads

4108-380KV Turnigy Multistar 22 Pole Brushless Multi-Rotor-Motor mit extralan...

QTY:

Now save Speichern 0,00 € 0,00 €

27,67 €
Stock:
Gewicht:
170 g
SKU:
9392000030-0

Suggestion Box

Please let us know if you found any issues with this product listing.
We take our customer comments very seriously and in many cases our website modifications and product updates are a result of your comments!

Price War

If you've seen a product elsewhere for a better price, please let us know! HobbyKing pride themselves on offering the best price, so if there if you see something cheaper elsewhere, let us know!

Combine

essential items and
acc
Product
Description

Der Suche nach dem ultimativen Power-System für Ihre nächste Multi-Rotor-Projekt? Suchen Sie nicht weiter!
Die Turnigy Multistar outrunners sind mit einer Sache im Auge - Multi-Rotor Leistung zu maximieren! Sie verfügen über High-End-45SH Magneten, hochwertige NMB Lager und hohe Polen zählt für weniger Lärm, glatt und reaktionsschnelle Leistung und höhere Effizienz. Sie verfügen über benutzerdefinierte Motormontage und alle sind Präzision für reibungslosen Ablauf ausgeglichen sind diese Motoren entwickelt, die speziell für Multirotor-Einsatz und werden auf Flugzeugmotoren basieren.

Die 4108-380kv Multistar ist fast zu schön, zu fliegen! Die Verarbeitung und Detail in diesem Motor ist auf eine ganz neue Ebene. Es ist mit Legte und vorinstalliertes NMB Lagern ausgestattet und verfügt über 570mm lang hohe grad Silizium Drähte. Es verfügt über Doppelstütze Montage, entweder ein Bolzen auf 6mm Welle Propellernabe oder der 12mm Abstand Schraube warf prop Befestigung mit einer Druckscheibe Präzision obere für eine unbegrenzte Auswahl an Requisiten. Und mit 22P24S Pol zählen seine glatte effizient und hat jede Menge Drehmoment.

Multistar vereinfacht die Welt der Multi-Rotoren mit ihren Zweck Produktlinie gebaut und nehmen die Vermutung ausarbeiten von Ihrem Setup.

Specs:
KV (RPM / V): 380
Lipo - Zellen: 4-6s
Max Strom: 360W
Max Ampere: 17A
Nein Ladestrom: 0,5 A / 10 V
Interner Widerstand: .225ohm
Anzahl der Pole: 22P24S (22poles 24 Statoren)
Abmessungen (Dia.xL): 47 x 26 mm
Motorwelle: 4mm
Kardanwelle: 6mm Bolzen an der Nabe oder 12mm Loch zu Loch für Schraube Stil Requisiten warf
Gewicht: 111g
Schraubenlochabstand: 19mm * 25mm

Product
Specifications

Zusätzliche Information

  • Artikelnummer:
    9392000030-0
  • Brand:
    MultiStar
  • Gewicht ( g)
    170.00
  • Länge
    85.00
  • Breite:
    45.00
  • Höhe:
    60.00
  • Kv (rpm / v)
    380.00
  • Max Currents (A)
    17.00
  • Leistung ( W):
    360.00
  • Länge B (mm):
    26.00
  • Kann Länge D (mm)
    12.00
  • Max Spannung (V)
    0.00
  • Welle A ( mm):
    4.00
  • Unit Weight (g):
    111
  • Durchmesser C (mm)
    47.00
  • Gesamtlänge E ( mm)
    36.00
  • Widerstand ( mh):
    0.00
Community
Discussions
Rate&
Review

Schreiben Sie Ihr eigenes Review

Only registered users can write reviews. Please, sign in or sign up

verified_user Quality
trending_up Value
playlist_add_check Overall
These motors when they work properly are great. However there is some serious QC issues with them. 2 out of the 4 motors I ordered have loose bearings which produce a loud rattling noise when I throttle up.

Quite disappointed considering others have a better experience with them.
verified_user Quality
trending_up Value
playlist_add_check Overall
verified_user Quality
trending_up Value
playlist_add_check Overall
Great motors! I am using 8 of them on a modified Tarot 650 Iron Man in an X8 configuration, spinning 15 x 5.5 CF T-style props (with the included adapters!) on a 4S setup with 2 25 amp Q-Brains in a stack on a third center plate mounted on the bottom. NAZA V2 and a OrangeRX 7ch RX.

With a pair of top-mounted Multistar 10c 8000mah 4S batteries, I am getting 27 minutes of flight time. Highly recommended!

Search for "Tarot 650 Triple Decker X8" to see the whole build at RCgroups.
verified_user Quality
trending_up Value
playlist_add_check Overall
verified_user Quality
trending_up Value
playlist_add_check Overall
Wow have 4 of these, my quad flies awesome,
Very quiet, smooth and vibration free, will definitely buy more!
verified_user Quality
trending_up Value
playlist_add_check Overall
Upload
Videos
Upload video
Upload
Files

Only registered users can upload files. Please log in or register to start helping your fellow hobbyists today!

Customer files
4108-380kv thrust data download now [272kb]

Combine

essential items and
acc

Produkttags

Andere Leute haben dieses Produkt mit diesen Tags gekennzeichnet:

Verwenden Sie Leerzeichen um Tags zu trennen. Verwenden Sie Apostrophe (') für Phrasen.