Registrieren

Product Finder

Einstellungen

Useful links

Live-Chat
 
[["US","AU","GB","DE"]]
Registrieren
Shipped From:
  • USA
  • Global

4108-480KV Turnigy Multistar 22 Pole Brushless Multi-Rotor-Motor mit extralange Leads

4108-480KV Turnigy Multistar 22 Pole Brushless Multi-Rotor-Motor mit extralan...

QTY:

Now save Speichern 0,00 € 0,00 €

28,30 €
Stock:
Gewicht:
169 g
SKU:
9392000031-0

Suggestion Box

Please let us know if you found any issues with this product listing.
We take our customer comments very seriously and in many cases our website modifications and product updates are a result of your comments!

Price War

If you've seen a product elsewhere for a better price, please let us know! HobbyKing pride themselves on offering the best price, so if there if you see something cheaper elsewhere, let us know!

Combine

essential items and
acc
Product
Description

Der Suche nach dem ultimativen Power-System für Ihre nächste Multi-Rotor-Projekt? Suchen Sie nicht weiter!
Die Turnigy Multistar outrunners sind mit einer Sache im Auge - Multi-Rotor Leistung zu maximieren! Sie verfügen über High-End-45SH Magneten, hochwertige NMB Lager und hohe Polen zählt für weniger Lärm, glatt und reaktionsschnelle Leistung und höhere Effizienz. Sie verfügen über benutzerdefinierte Motormontage und alle sind Präzision für reibungslosen Ablauf ausgeglichen sind diese Motoren entwickelt, die speziell für Multirotor-Einsatz und werden auf Flugzeugmotoren basieren.

Die 4108-480kv Multistar ist fast zu schön, zu fliegen! Die Verarbeitung und Detail in diesem Motor ist auf eine ganz neue Ebene. Es ist mit Legte und vorinstalliertes NMB Lagern ausgestattet und verfügt über 570mm lang hohe grad Silizium Drähte. Es verfügt über Doppelstütze Montage, entweder ein Bolzen auf 6mm Welle Propellernabe oder der 12mm Abstand Schraube warf prop Befestigung mit einer Druckscheibe Präzision obere für eine unbegrenzte Auswahl an Requisiten. Und mit 22P24S Pol zählen seine glatte effizient und hat jede Menge Drehmoment.

Multistar vereinfacht die Welt der Multi-Rotoren mit ihren Zweck Produktlinie gebaut und nehmen die Vermutung ausarbeiten von Ihrem Setup.

Specs:
KV (RPM / V): 480
Lipo - Zellen: 4-6s
Max Strom: 380W
Max Ampere: 22A
Nein Ladestrom: 0,6 A / 10 V
Interner Widerstand: .0128ohm
Anzahl der Pole: 22P24S (22poles 24 Statoren)
Abmessungen (Dia.xL): 47 x 26 mm
Motorwelle: 4mm
Kardanwelle: 6mm Bolzen an der Nabe oder 12mm Loch zu Loch für Schraube Stil Requisiten warf
Gewicht: 111g
Schraubenlochabstand: 19mm * 25mm

Product
Specifications

Zusätzliche Information

  • Artikelnummer:
    9392000031-0
  • Brand:
    MultiStar
  • Gewicht ( g)
    169.00
  • Länge
    85.00
  • Breite:
    45.00
  • Höhe:
    60.00
  • Kv (rpm / v)
    480.00
  • Max Currents (A)
    22.00
  • Leistung ( W):
    380.00
  • Länge B (mm):
    26.00
  • Kann Länge D (mm)
    12.00
  • Max Spannung (V)
    0.00
  • Welle A ( mm):
    4.00
  • Unit Weight (g):
    111
  • Durchmesser C (mm)
    27.00
  • Gesamtlänge E ( mm)
    36.00
  • Widerstand ( mh):
    0.00
Community
Discussions
Rate&
Review

Schreiben Sie Ihr eigenes Review

Only registered users can write reviews. Please, sign in or sign up

verified_user Quality
trending_up Value
playlist_add_check Overall
no way to get it work. i have desync issue with 5/5 of theese motors. I tried with different escs, simonk an blheli and every time in certain rpm range the motor produces a loud sound and randomly stops. Very dangerous.
verified_user Quality
trending_up Value
playlist_add_check Overall
verified_user Quality
trending_up Value
playlist_add_check Overall
muy buenos moteres gran fuerza al despege, les doy caa dia si dia no y todavia sin fallos toquemos madera los recomiendo
verified_user Quality
trending_up Value
playlist_add_check Overall
verified_user Quality
trending_up Value
playlist_add_check Overall
Nice build quality. Very smooth rotation. No flaws upon receipt. All hardware is of good quality.
verified_user Quality
trending_up Value
playlist_add_check Overall
verified_user Quality
trending_up Value
playlist_add_check Overall
Purchased three of these motors for a Tricopter due to lack of time I started to work on this set up four months later and realized one of these motors arrived with broken ball bearing. The other two motors look and work perfect.
Motor with defective bearing is getting stuck when rotated by hand so now I will have to look for the replacement parts for the never used motor.
HK please pay attention to these small details during your QC.
Thanks.
verified_user Quality
trending_up Value
playlist_add_check Overall
verified_user Quality
trending_up Value
playlist_add_check Overall
Excellent motors for the price. Very smooth and efficient . Installed with 14" 4.5 t-props , 30A esc , Tarot FY650 , Tarot gimbal with GP3 , Naz M ,5000mAh 4s 25c, total weight 2.3kg . 15 minutes flight time ,low voltage warning set at 14.2v. Much better than the old multistar 4822 . Absolutely recommend these for your next quad build.
verified_user Quality
trending_up Value
playlist_add_check Overall
verified_user Quality
trending_up Value
playlist_add_check Overall
This motor seems to be perfect for my Talon Tricopter with extended booms. Weight of my tricopter is 1965g (including battery, GoPro 3 brushless gimbal) and I'm able to hover little bit over 21 minutes! (10pcnt of battery left). Hover @ 45~55pcnt throttle. My configuration is Talon Tricopter frame, 380 mm Carbon Fibre booms, Turnigy Multistar 4108-480KV motors, 15x5.5 DJI propellers, Turnigy 20A multistar ESCs with SimonK firmware, TGY-306G servo, ZIPPY Compact 5800mAh 4S 25C, Crius AIOP board with MegapirateNG firmware. I'm definitely gonna use these motors in my futher copters.
verified_user Quality
trending_up Value
playlist_add_check Overall
Upload
Videos
  • Hexcopter Endurance Test

Upload video
Upload
Files

Only registered users can upload files. Please log in or register to start helping your fellow hobbyists today!

Combine

essential items and
acc

Produkttags

Andere Leute haben dieses Produkt mit diesen Tags gekennzeichnet:

Verwenden Sie Leerzeichen um Tags zu trennen. Verwenden Sie Apostrophe (') für Phrasen.