New Items Forum
Register

Total Price

$0.00

Cart 0 Cart 0 Loading...

3508-380KV Turnigy Multistar 14 Pole Brushless Multi-Rotor Motor With Extra Long Leads

3508-380KV Turnigy Multistar 14 Pole Brushless Multi-Rotor Motor With Extra Long Leads

Shipped From:
  • Global

Now save save $0.00 $0.00

$33.79
Alert me
Status:
Out of stock!
SKU:
9392000022-0
ETA:
No ETA At This Time [ ? ]
WANT FREE SHIPPING? Click here to find out more!

Looking for the ultimate power system for your next Multi-rotor project? Look no further!
The Turnigy Multistar outrunners are designed with one thing in mind - maximizing Multi-rotor performance! They feature high-end 45SH magnets, high quality NMB bearings and High Poles counts for less noise, smooth and responsive power and increased efficiency. They have custom motor mounting and all are precision balanced for smooth running, these motors are engineered specifically for multi-rotor use and are not based on airplane motors.

The 3508-380KV MultiStar is almost too nice to fly! The workmanship and detail in this motor is at a whole new level. It’s fitted with shimmed and pre-loaded NMB bearings and has 570mm long high grad silicon wires. It has dual prop mounting, either a bolt on 6mm shaft prop hub or the 12mm spacing bolt threw prop attachment with a precision upper thrust washer for an unlimited range of props. And with 14P12S pole count its smooth efficient and has loads of torque.

Multistar is simplifying the world of Multi-Rotors with their purpose built product line and taking the guess work out of your setup.

Specs:
KV(RPM/V): 380
Lipo cells: 4-6s
Max current: 320w
Max Amps: 14A
No Load Current: 0.3A/10v
Internal Resistance: .215ohm
Number of Poles: 14P12S (14poles 12 stators)
Dimensions(Dia.xL):42.2 x 25.7mm
Motor Shaft: 4mm
prop shaft: 6mm bolt on hub or 12mm hole to hole for bolt threw style props
Weight: 102g
bolt hole spacing: 19mm * 25mm

  • SKU 9392000022-0
  • Brand MultiStar
  • Shipping Weight 158.0000
  • Packaging Length 85.00
  • Packaging Width 45.00
  • Packaging Height 60.00
  • Kv(rpm/v) 380.00
  • Max Current (A) 14.00
  • Resistance (mh) 134.00
  • Max Voltage(V) 25.00
  • Power (W) 320.00
  • Shaft A(mm) 4.00
  • Length B (mm) 26.00
  • Diameter C(mm) 42.00
  • Can Length D(mm) 10.00
  • Total Length E(mm) 36.00
  • MultiStar Motors
Upload video

Only registered users can upload video. Please, log in or register

Only registered users can write reviews. Please, sign in or sign up

Best Motor Design in the price they offered ,At more than 13G/W Efficiency,Well made ,perfectly balanced motor,I have more than 16 used for my project and never dis-pointed me.
Tested with my HEXACOPTER newly made and the most Expensive feedback is i have purchase 4 of them 2 years ago for my first build Quad copter,and still working even after more than 100 hours total flight made,slightly bearing service needs.otherwise
GREAT MOTORS,WELL BALANCED ,THERMAL DESIGNING IS GOOD,NOT HEATS UP AT 15INCH WITH 4S CONFIG QUAD-COPTER

verified_user Quality:
trending_up Value:
playlist_add_check Overall:

Best Motor Design in the price they offered ,At more than 13G/W Efficiency,Well made ,perfectly balanced motor,I have more than 16 used for my project and never dis-pointed me.
Tested with my HEXACOPTER newly made and the most Expensive feedback is i have purchase 4 of them 2 years ago for my first build Quad copter,and still working even after more than 100 hours total flight made,slightly bearing service needs.otherwise
GREAT MOTORS,WELL BALANCED ,THERMAL DESIGNING IS GOOD,NOT HEATS UP AT 15INCH WITH 4S CONFIG QUAD-COPTER

Customer files
3508-380 thrust data Download [333]
Upload your file

Only registered users can upload files.
Please log in or register to start helping your fellow hobbyists today!

Related Tags