New Items Forum
Register

Total Price

$0.00

Cart 0 Cart 0 Loading...

3508-580KV Turnigy Multistar 14 Pole Brushless Multi-Rotor Motor With Extra Long Leads

3508-580KV Turnigy Multistar 14 Pole Brushless Multi-Rotor Motor With Extra Long Leads

Shipped From:
  • Global
QTY:

Now save save $0.00 $0.00

$33.79
Status:
In Stock
SKU:
9392000023-0
WANT FREE SHIPPING? Click here to find out more!

Looking for the ultimate power system for your next Multi-rotor project? Look no further!
The Turnigy Multistar outrunners are designed with one thing in mind - maximizing Multi-rotor performance! They feature high-end 45SH magnets, high quality NMB bearings and High Poles counts for less noise, smooth and responsive power and increased efficiency. They have custom motor mounting and all are precision balanced for smooth running, these motors are engineered specifically for multi-rotor use and are not based on airplane motors.

The 3508-580KV MultiStar is almost too nice to fly! The workmanship and detail in this motor is at a whole new level. It’s fitted with shimmed and pre-loaded NMB bearings and has 570mm long high grad silicon wires. It has dual prop mounting, either a bolt on 6mm shaft prop hub or the 12mm spacing bolt threw prop attachment with a precision upper thrust washer for an unlimited range of props. And with 14P12S pole count its smooth efficient and has loads of torque.

Multistar is simplifying the world of Multi-Rotors with their purpose built product line and taking the guess work out of your setup.

Specs:
KV(RPM/V): 580
Lipo cells: 3-4s
Max current: 340w
Max Amps: 26A
No Load Current: 0.4A/10v
Internal Resistance: .106ohm
Number of Poles: 14P12S (14poles 12 stators)
Dimensions(Dia.xL):42 x 26mm
Motor Shaft: 4mm
prop shaft: 6mm bolt on hub or 12mm hole to hole for bolt threw style props
Weight: 102g
bolt hole spacing: 19mm * 25mm

  • SKU 9392000023-0
  • Brand MultiStar
  • Shipping Weight 160.0000
  • Length 85.00
  • Width 45.00
  • Height 60.00
  • Kv(rpm/v) 580.00
  • Max Current (A) 26.00
  • Resistance (mh) 134.00
  • Max Voltage(V) 25.00
  • Power (W) 340.00
  • Shaft A(mm) 4.00
  • Length B (mm) 26.00
  • Diameter C(mm) 42.00
  • Can Length D(mm) 10.00
  • Total Length E(mm) 36.00
  • MultiStar Motors
Upload video

Only registered users can upload video. Please, log in or register

Only registered users can write reviews. Please, sign in or sign up

Motor muito bom, eu usei com hlices 13x4 e 12x4,5 num quad x650f.
Obtive melhores resultados com hlices 12x4,5, chegando a 14 minutos de voo com uma bateria de 3000 20c 4s, sem carga.
Na caixa do motor indicado hlice 13x4 como a melhor, mas obtive somente 9 minutos com essas hlices, mas ele fica com um baita empuxo !
Meu quad voa muito bem hoje com 12x4,5 gimbal BL e FPV.

verified_user Quality:
trending_up Value:
playlist_add_check Overall:

Motor muito bom, eu usei com hlices 13x4 e 12x4,5 num quad x650f.
Obtive melhores resultados com hlices 12x4,5, chegando a 14 minutos de voo com uma bateria de 3000 20c 4s, sem carga.
Na caixa do motor indicado hlice 13x4 como a melhor, mas obtive somente 9 minutos com essas hlices, mas ele fica com um baita empuxo !
Meu quad voa muito bem hoje com 12x4,5 gimbal BL e FPV.

I have 4 on a x650f quad.
I used them with 13x4 and 12x4,5 propellers, i had best results with 12x4,5, on this quad o got up to 14 minutes with 2200 25c 4s battery without load.

verified_user Quality:
trending_up Value:
playlist_add_check Overall:

I have 4 on a x650f quad.
I used them with 13x4 and 12x4,5 propellers, i had best results with 12x4,5, on this quad o got up to 14 minutes with 2200 25c 4s battery without load.

They work great together with 30A Afro ESC and 4S setup, all up weight is 3 kg and with 4S 8000mAh I have 15 minutes of flight time with 3 axis gimbal and gopro

verified_user Quality:
trending_up Value:
playlist_add_check Overall:

They work great together with 30A Afro ESC and 4S setup, all up weight is 3 kg and with 4S 8000mAh I have 15 minutes of flight time with 3 axis gimbal and gopro

Very good motor, i have a set of 4 on a X650F, very balanced and very god bearings.
Using 12x45 props and hoover with 38pcnt os trothle.

verified_user Quality:
trending_up Value:
playlist_add_check Overall:

Very good motor, i have a set of 4 on a X650F, very balanced and very god bearings.
Using 12x45 props and hoover with 38pcnt os trothle.

dam backorder.... using on my Tarot 680PRO with 13x6.5 carbon

verified_user Quality:
trending_up Value:
playlist_add_check Overall:

dam backorder.... using on my Tarot 680PRO with 13x6.5 carbon

Very good motors, I use 4 on Tarot Ironman 650 with 4S batteries and 11 props. Total weight is 2,1 Kg and no heat at all. Good package with two kind of props mount, perhaps screws are few.
I suggest, maybe 700kV were better but I'll put 12 props.

verified_user Quality:
trending_up Value:
playlist_add_check Overall:

Very good motors, I use 4 on Tarot Ironman 650 with 4S batteries and 11 props. Total weight is 2,1 Kg and no heat at all. Good package with two kind of props mount, perhaps screws are few.
I suggest, maybe 700kV were better but I'll put 12 props.

Customer files
3508-580kv thrust data Download [235]
No File Name Download [1119]
Upload your file

Only registered users can upload files.
Please log in or register to start helping your fellow hobbyists today!

Related Tags