3508-580KV Turnigy Multistar 14 Pole Brushless Multi-Rotor Motor With Extra Long Leads
3508-580KV Turnigy Multistar 14 Pole Brushless Multi-Rotor Motor With Extra Long Leads
Awesome!
Copy and Share the Below URL
Looking for the ultimate power system for your next Multi-rotor project? Look no further!
The Turnigy Multistar outrunners are designed with one thing in mind - maximizing Multi-rotor performance! They feature high-end 45SH magnets, high quality NMB bearings and High Poles counts for less noise, smooth and responsive power and increased efficiency. They have custom motor mounting and all are precision balanced for smooth running, these motors are engineered specifically for multi-rotor use and are not based on airplane motors.
The 3508-580KV MultiStar is almost too nice to fly! The workmanship and detail in this motor is at a whole new level. It’s fitted with shimmed and pre-loaded NMB bearings and has 570mm long high grad silicon wires. It has dual prop mounting, either a bolt on 6mm shaft prop hub or the 12mm spacing bolt threw prop attachment with a precision upper thrust washer for an unlimited range of props. And with 14P12S pole count its smooth efficient and has loads of torque.
Multistar is simplifying the world of Multi-Rotors with their purpose built product line and taking the guess work out of your setup.
Specs:
KV(RPM/V): 580
Lipo cells: 3-4s
Max current: 340w
Max Amps: 26A
No Load Current: 0.4A/10v
Internal Resistance: .106ohm
Number of Poles: 14P12S (14poles 12 stators)
Dimensions(Dia.xL):42 x 26mm
Motor Shaft: 4mm
prop shaft: 6mm bolt on hub or 12mm hole to hole for bolt threw style props
Weight: 102g
bolt hole spacing: 19mm * 25mm
-
Kv(rpm/v) 580.00
-
Max Current (Motor) (A) 26.00
-
Resistance (mh) 134.00
-
Max Voltage (V) 25.00
-
Power (W) 340.00
-
Shaft A(mm) 4.00
-
Length B (mm) 26.00
-
Can Diameter C(mm) 42.00
-
Can Length D(mm) 10.00
-
Total Length E(mm) 36.00
Harald | Verified Buyer
-
Overall
-
Quality
-
Value
customer rated
Apr 25, 2020
Guilherme Junior | Verified Buyer
-
Overall
-
Quality
-
Value
Customer Rated
Jul 03, 2015
Guilherme Junior | Verified Buyer
-
Overall
-
Quality
-
Value
Customer Rated
Jul 03, 2015
Ghambit | Verified Buyer
-
Overall
-
Quality
-
Value
Certified Buyer Rated
Mar 27, 2015
Guilherme Junior | Verified Buyer
-
Overall
-
Quality
-
Value
Customer Rated
Dec 03, 2014
Ricardo [PT] | Verified Buyer
-
Overall
-
Quality
-
Value
Certified Buyer Rated
Oct 13, 2014
gabri78 | Verified Buyer
-
Overall
-
Quality
-
Value
Customer Rated
Jan 26, 2014
3508-580kv thrust data | Download [235] |
No File Name | Download [1119] |
Only registered users can upload files.
Please log in or register to start helping your fellow hobbyists today!