Total Price

$0.00

Cart 0 Cart 0 Loading...

4010-580KV Turnigy Multistar 22 Pole Brushless Multi-Rotor Motor With Extra Long Leads

Generating Links

4010-580KV Turnigy Multistar 22 Pole Brushless Multi-Rotor Motor With Extra Long Leads

Already Purchased Discontinued Product

Please continue searching for a similar product.
SKU:
9392000027-0
want FREE shipping? Click here to find out more!

Looking for the ultimate power system for your next Multi-rotor project? Look no further!
The Turnigy Multistar outrunners are designed with one thing in mind - maximizing Multi-rotor performance! They feature high-end 45SH magnets, high quality NMB bearings and High Poles counts for less noise, smooth and responsive power and increased efficiency. They have custom motor mounting and all are precision balanced for smooth running, these motors are engineered specifically for multi-rotor use and are not based on airplane motors.

The 4010-580KV MultiStar is almost too nice to fly! The workmanship and detail in this motor is at a whole new level. It’s fitted with shimmed and pre-loaded NMB bearings and has 570mm long high grad silicon wires. It has dual prop mounting, either a bolt on 6mm shaft prop hub or the 12mm spacing bolt threw prop attachment with a precision upper thrust washer for an unlimited range of props. And with 22P24S pole count its smooth efficient and has loads of torque.

Multistar is simplifying the world of Multi-Rotors with their purpose built product line and taking the guess work out of your setup.

Specs:
KV(RPM/V): 580
Lipo cells: 4-5s
Max current: 550w
Max Amps: 32A
No Load Current: 1.1A/10v
Internal Resistance: .062ohm
Number of Poles: 22P24S (22poles 24 stators)
Dimensions(Dia.xL):45 x 28mm
Motor Shaft: 4mm
prop shaft: 6mm bolt on hub or 12mm hole to hole for bolt threw style props
Weight: 128g
bolt hole spacing: 19mm * 25mm

  • Kv(rpm/v) 580.00
  • Max Current (Motor) (A) 32.00
  • Resistance (mh) 134.00
  • Max Voltage (V) 25.00
  • Power (W) 550.00
  • Shaft A(mm) 4.00
  • Length B (mm) 28.00
  • Can Diameter C(mm) 45.00
  • Can Length D(mm) 13.00
  • Total Length E(mm) 39.00
attributeset-10
Close

Dimension Diagram Guide

  • attributeset-10

Close

Upload video

Only registered users can upload video. Please, log in or register

Only registered users can write reviews. Please, sign in or sign up

p66charly | Verified Buyer

  • Quality
  • Value
  • Overall

Customer Rated

Oct 10, 2014

very powerful motor with carbon fiber prop 15x7.5 4s battery 2kg of thrust 28A 436 watt with 3s 1.8 kg of thrust ,well balanced , no noise ,not warm at 4s full power 15x7,5 propeller , use hobby king dji s800 carbon fiber 15x7,5 propeller ,excellent resoult

Customer files
3510-580kv (sunnysky) Download [235]
Upload your file

Only registered users can upload files.
Please log in or register to start helping your fellow hobbyists today!

Related Tags