4108-600KV Turnigy Multistar 22 Pole Brushless Multi-Rotor Motor With Extra Long Leads

4108-600KV Turnigy Multistar 22 Pole Brushless Multi-Rotor Motor With Extra Long Leads
Copy and Share the Below URL
Looking for the ultimate power system for your next Multi-rotor project? Look no further!
The Turnigy Multistar outrunners are designed with one thing in mind - maximizing Multi-rotor performance! They feature high-end 45SH magnets, high quality NMB bearings and High Poles counts for less noise, smooth and responsive power and increased efficiency. They have custom motor mounting and all are precision balanced for smooth running, these motors are engineered specifically for multi-rotor use and are not based on airplane motors.
The 4108-600 MultiStar is almost too nice to fly! The workmanship and detail in this motor is at a whole new level. It’s fitted with shimmed and pre-loaded NMB bearings and has 570mm long high grad silicon wires. It has dual prop mounting, either a bolt on 6mm shaft prop hub or the 12mm spacing bolt threw prop attachment with a precision upper thrust washer for an unlimited range of props. And with 22P24S pole count its smooth efficient and has loads of torque.
Multistar is simplifying the world of Multi-Rotors with their purpose built product line and taking the guess work out of your setup.
Specs:
KV(RPM/V): 600
Lipo cells: 4-6s
Max current: 400w
Max Amps: 26A
No Load Current: 0.9A/10v
Internal Resistance: .098ohm
Number of Poles: 22P24S (22poles 24 stators)
Dimensions(Dia.xL):47 x 26mm
Motor Shaft: 4mm
prop shaft: 6mm bolt on hub or 12mm hole to hole for bolt threw style props
Weight: 111g
bolt hole spacing: 19mm * 25mm
-
Kv(rpm/v) 600.00
-
Max Current (Motor) (A) 26.00
-
Resistance (mh) 172.00
-
Max Voltage (V) 25.00
-
Power (W) 400.00
-
Shaft A(mm) 4.00
-
Length B (mm) 26.00
-
Can Diameter C(mm) 47.00
-
Can Length D(mm) 12.00
-
Total Length E(mm) 37.00

Beachy Head | Verified Buyer
-
Overall
-
Quality
-
Value
Very good
May 06, 2019
| Verified Buyer
-
Overall
-
Quality
-
Value
Certified Buyer Rated
Dec 25, 2015
David | Verified Buyer
-
Overall
-
Quality
-
Value
Customer Rated
May 29, 2015
Martin | Verified Buyer
-
Overall
-
Quality
-
Value
Customer Rated
May 06, 2015
Luke | Verified Buyer
-
Overall
-
Quality
-
Value
Customer Rated
Feb 23, 2015
Phil | Verified Buyer
-
Overall
-
Quality
-
Value
Customer Rated
Oct 08, 2014
Philippe | Verified Buyer
-
Overall
-
Quality
-
Value
Customer Rated
Aug 23, 2014
Dirkson | Verified Buyer
-
Overall
-
Quality
-
Value
Certified Buyer Rated
Jan 25, 2014
GerritK | Verified Buyer
-
Overall
-
Quality
-
Value
Customer Rated
Dec 26, 2013
No File Name | Download [205] |
thrust and prop size data | Download [193] |
prop and thrust data | Download [193] |
Only registered users can upload files.
Please log in or register to start helping your fellow hobbyists today!