Total Price

$0.00

Cart 0 Cart 0 Loading...

4112-400KV Turnigy Multistar 22 Pole Brushless Multi-Rotor Motor With Extra Long Leads

Generating Links

4112-400KV Turnigy Multistar 22 Pole Brushless Multi-Rotor Motor With Extra Long Leads

Already Purchased Discontinued Product

Please continue searching for a similar product.
SKU:
9392000034-0
want FREE shipping? Click here to find out more!

Looking for the ultimate power system for your next Multi-rotor project? Look no further!
The Turnigy Multistar outrunners are designed with one thing in mind - maximizing Multi-rotor performance! They feature high-end 45SH magnets, high quality NMB bearings and High Poles counts for less noise, smooth and responsive power and increased efficiency. They have custom motor mounting and all are precision balanced for smooth running, these motors are engineered specifically for multi-rotor use and are not based on airplane motors.

The 4112-400 MultiStar is almost too nice to fly! The workmanship and detail in this motor is at a whole new level. It’s fitted with shimmed and pre-loaded NMB bearings and has 570mm long high grad silicon wires. It has dual prop mounting, either a bolt on 6mm shaft prop hub or the 12mm spacing bolt threw prop attachment with a precision upper thrust washer for an unlimited range of props. And with 22P24S pole count its smooth efficient and has loads of torque.

Multistar is simplifying the world of Multi-Rotors with their purpose built product line and taking the guess work out of your setup.

Specs:
KV(RPM/V): 400
Lipo cells: 4-8s
Max current: 680w
Max Amps: 24A
No Load Current: 0.8A/10v
Internal Resistance: .172ohm
Number of Poles: 22P24S (22poles 24 stators)
Dimensions(Dia.xL):46.7 x 29.7mm
Motor Shaft: 5mm
prop shaft: 6mm bolt on hub or 12mm hole to hole for bolt threw style props
Weight: 147g
bolt hole spacing: 19mm * 25mm

  • Kv(rpm/v) 400.00
  • Max Current (Motor) (A) 24.00
  • Resistance (mh) 172.00
  • Max Voltage (V) 30.00
  • Power (W) 680.00
  • Shaft A(mm) 5.00
  • Length B (mm) 30.00
  • Can Diameter C(mm) 47.00
  • Can Length D(mm) 15.00
  • Total Length E(mm) 40.00
attributeset-10
Close

Dimension Diagram Guide

  • attributeset-10

Close

Upload video

Only registered users can upload video. Please, log in or register

Topics
Sort by
Most Recent Topics
* Nickname:

* Your Reply:


Please, enter the text shown in the image into the field below
*Verification Code:
Cancel
Submit
Post a new Topic
* Nickname:

* Your Topic:



Please, enter the text shown in the image into the field below
*Verification Code:
Post Topic

Only registered users can write reviews. Please, sign in or sign up

Artem | Verified Buyer

  • Quality
  • Value
  • Overall

Customer Rated

Jul 16, 2015

these are horribly unbalanced even though the attempt is apparent. the main issue is that the large portion of magnets across all six motors are misaligned with one motor's having an issue where a magnet touches the stator.

Serhat | Verified Buyer

  • Quality
  • Value
  • Overall

Customer Rated

Mar 05, 2015

I am using this on a Endurance version of the TBS Discovery Pro. Very efficient motors when combined with 15.5 inch props.

Customer files
483927402X745660X31.jpg Download [244]
Upload your file

Only registered users can upload files.
Please log in or register to start helping your fellow hobbyists today!

Related Tags