Registrarse

Product Finder

Configuración

Useful links

Chat en vivo
 
[["US","AU","GB","DE"]]
Registrarse
Shipped From:
  • Global

3508-580KV Turnigy Multistar 14 Polo sin escobillas Multi-rotor del motor con cables extra largas

3508-580KV Turnigy Multistar 14 Polo sin escobillas Multi-rotor del motor con...

QTY:

Now save guardar 0,00 € 0,00 €

27,44 €
Stock:
Peso:
160 g
SKU:
9392000023-0

Suggestion Box

Please let us know if you found any issues with this product listing.
We take our customer comments very seriously and in many cases our website modifications and product updates are a result of your comments!

Price War

If you've seen a product elsewhere for a better price, please let us know! HobbyKing pride themselves on offering the best price, so if there if you see something cheaper elsewhere, let us know!

Combine

essential items and
acc
Descripción
del

Buscando el sistema de energía final para su próximo proyecto multi-rotor? ¡No busque más!
Los outrunners Turnigy MultiSTAR están diseñados con una cosa en mente - maximizando el rendimiento del Multi-rotor! Cuentan con imanes 45SH de gama alta, los cojinetes de NMB de alta calidad y los recuentos de postes altos para reducir el ruido, la potencia suave y sensible y una mayor eficiencia. Tienen montaje de encargo del motor y todos son de precisión equilibrada para un funcionamiento suave, estos motores están diseñados específicamente para su uso multi-rotor y no se basan en motores de avión.

El 3508-580KV MultiStar es casi demasiado bueno para volar! La mano de obra y detalle en este motor es a un nivel totalmente nuevo. Está equipado con rodamientos de NMB y calzar precargados y tiene 570 mm alambres de silicio graduado de la high largos. Tiene la doble hélice de montaje, ya sea un tornillo en el centro de eje de la hélice de 6 mm o 12 mm de separación del perno de fijación arrojaron prop con una precisión arandela de empuje superior para una gama ilimitada de los apoyos. Y con 14P12S polo contar con su suave eficiente y tiene un montón de torque.

Multistar está simplificando el mundo de multi-rotores con su propósito construido línea de productos y tomar el trabajo de adivinar de su configuración.

Especificaciones:
KV (RPM / V): 580
Células Lipo: 3-4s
Corriente máxima: 340w
Amps max: 26A
Sin corriente de carga: 0.4A / 10v
Resistencia interna: .106ohm
Número de polos: 14P12S (12 14poles estatores)
Dimensiones (Dia.xL): 42 x 26 mm
Eje del Motor: 4 mm
del eje de propulsión: perno de 6 mm en el hoyo concentrador o 12 mm de agujero para perno arrojó apoyos estilo
Peso: 102 g
espaciamiento de taladros: 19 mm * 25 mm

Product
Specifications

Información adicional

  • SKU (Número de Referencia):
    9392000023-0
  • Brand:
    MultiStar
  • Peso ( g)
    160.00
  • Longitud
    85.00
  • Ancho:
    45.00
  • Altura:
    60.00
  • Kv (rpm / v)
    580.00
  • Corrientes max (A)
    26.00
  • Potencia ( W ):
    340.00
  • B Longitud ( mm ):
    26.00
  • Puede longitud D ( mm )
    10.00
  • Max Voltaje ( V )
    0.00
  • Un eje ( mm ):
    4.00
  • Unit Weight (g):
    102
  • C Diámetro ( mm )
    42.00
  • Longitud Total E ( mm )
    36.00
  • Resistencia ( MH ):
    0.00
Community
Discussions
Rate&
Review

Escribir Tu Propia Revisión

Only registered users can write reviews. Please, sign in or sign up

verified_user Quality
trending_up Value
playlist_add_check Overall
Motor muito bom, eu usei com hlices 13x4 e 12x4,5 num quad x650f.
Obtive melhores resultados com hlices 12x4,5, chegando a 14 minutos de voo com uma bateria de 3000 20c 4s, sem carga.
Na caixa do motor indicado hlice 13x4 como a melhor, mas obtive somente 9 minutos com essas hlices, mas ele fica com um baita empuxo !
Meu quad voa muito bem hoje com 12x4,5 gimbal BL e FPV.
verified_user Quality
trending_up Value
playlist_add_check Overall
verified_user Quality
trending_up Value
playlist_add_check Overall
I have 4 on a x650f quad.
I used them with 13x4 and 12x4,5 propellers, i had best results with 12x4,5, on this quad o got up to 14 minutes with 2200 25c 4s battery without load.
verified_user Quality
trending_up Value
playlist_add_check Overall
verified_user Quality
trending_up Value
playlist_add_check Overall
They work great together with 30A Afro ESC and 4S setup, all up weight is 3 kg and with 4S 8000mAh I have 15 minutes of flight time with 3 axis gimbal and gopro
verified_user Quality
trending_up Value
playlist_add_check Overall
verified_user Quality
trending_up Value
playlist_add_check Overall
Very good motor, i have a set of 4 on a X650F, very balanced and very god bearings.
Using 12x45 props and hoover with 38pcnt os trothle.
verified_user Quality
trending_up Value
playlist_add_check Overall
verified_user Quality
trending_up Value
playlist_add_check Overall
dam backorder.... using on my Tarot 680PRO with 13x6.5 carbon
verified_user Quality
trending_up Value
playlist_add_check Overall
verified_user Quality
trending_up Value
playlist_add_check Overall
Very good motors, I use 4 on Tarot Ironman 650 with 4S batteries and 11 props. Total weight is 2,1 Kg and no heat at all. Good package with two kind of props mount, perhaps screws are few.
I suggest, maybe 700kV were better but I'll put 12 props.
verified_user Quality
trending_up Value
playlist_add_check Overall
Upload
Videos
  • MultiStar Motors

Upload video
Upload
Files

Only registered users can upload files. Please log in or register to start helping your fellow hobbyists today!

Combine

essential items and
acc

Etiqueta de Producto

Otras personas han destacado este producto con estas etiquetas:

Utiliza espacios para separar las etiquetas. Usa comillas simples (') para expresiones.