New Items Foro
Registrarse

Total Price

0,00 €

Cesta 0 Cesta 0 Loading...

3508-700KV Turnigy Multistar 14 Polo sin escobillas Multi-rotor del motor con cables extra largas

3508-700KV Turnigy Multistar 14 Polo sin escobillas Multi-rotor del motor con cables extra largas

Shipped From:
  • Global
QTY:

Now save guardar 0,00 € 0,00 €

28,96 €
Estado:
En stock
Peso:
157 g
SKU:
9392000024-0
WANT FREE SHIPPING? Click here to find out more!

Buscando el sistema de energía final para su próximo proyecto multi-rotor? ¡No busque más!
Los outrunners Turnigy MultiSTAR están diseñados con una cosa en mente - maximizando el rendimiento del Multi-rotor! Cuentan con imanes 45SH de gama alta, los cojinetes de NMB de alta calidad y los recuentos de postes altos para reducir el ruido, la potencia suave y sensible y una mayor eficiencia. Tienen montaje de encargo del motor y todos son de precisión equilibrada para un funcionamiento suave, estos motores están diseñados específicamente para su uso multi-rotor y no se basan en motores de avión.

El 3508-700KV MultiStar es casi demasiado bueno para volar! La mano de obra y detalle en este motor es a un nivel totalmente nuevo. Está equipado con rodamientos de NMB y calzar precargados y tiene 570 mm alambres de silicio graduado de la high largos. Tiene la doble hélice de montaje, ya sea un tornillo en el centro de eje de la hélice de 6 mm o 12 mm de separación del perno de fijación arrojaron prop con una precisión arandela de empuje superior para una gama ilimitada de los apoyos. Y con 14P12S polo contar con su suave eficiente y tiene un montón de torque.

Multistar está simplificando el mundo de multi-rotores con su propósito construido línea de productos y tomar el trabajo de adivinar de su configuración.

Especificaciones:
KV (RPM / V): 700
Células Lipo: 3-4s
Corriente máxima: 360w
Amps max: 28A
Sin corriente de carga: 0.5A / 10v
Resistencia interna: .083ohm
Número de polos: 14P12S (12 14poles estatores)
Dimensiones (Dia.xL): 43 x 26 mm
Eje del Motor: 4 mm
del eje de propulsión: perno de 6 mm en el hoyo concentrador o 12 mm de agujero para perno arrojó apoyos estilo
Peso: 102 g
espaciamiento de taladros: 19 mm * 25 mm

  • SKU (Número de Referencia) 9392000024-0
  • Brand MultiStar
  • Peso ( g) 157.00
  • Longitud 85.00
  • Ancho 45.00
  • Altura 60.00
  • Kv (rpm / v) 700.00
  • Unit Weight (g) 102
  • Corrientes max (A) 28.00
  • Resistencia ( MH ) 134.00
  • Max Voltaje ( V ) 25.00
  • Potencia ( W ) 360.00
  • Un eje ( mm ) 4.00
  • B Longitud ( mm ) 26.00
  • C Diámetro ( mm ) 42.00
  • Puede longitud D ( mm ) 10.00
  • Longitud Total E ( mm ) 36.00
  • MultiStar Motors
Upload video

Only registered users can upload video. Please, log in or register

Only registered users can write reviews. Please, sign in or sign up

This motor is pretty good and proper KV for 600-700 class Multicopter.
I installed this in my Tarrot 650 X-copter. with 12x4.5 and 11x4.5 APC prop.
Both setting of them works well. But 12-inch prop is better, It's more power.
I uses Hobbywing X-Rotor ESC - 40amp. Because it has connector on it's board, it's well fit with this motor's long load(it's good point also).
But, I think the quality of the bearing is quite poor. Some fall-off make the bearing get bad. But I recommend this motor for the 600-700 class multicopter strongly.
It's quite good.

verified_user Quality:
trending_up Value:
playlist_add_check Overall:

This motor is pretty good and proper KV for 600-700 class Multicopter.
I installed this in my Tarrot 650 X-copter. with 12x4.5 and 11x4.5 APC prop.
Both setting of them works well. But 12-inch prop is better, It's more power.
I uses Hobbywing X-Rotor ESC - 40amp. Because it has connector on it's board, it's well fit with this motor's long load(it's good point also).
But, I think the quality of the bearing is quite poor. Some fall-off make the bearing get bad. But I recommend this motor for the 600-700 class multicopter strongly.
It's quite good.

very nice motors. Running on a 2300grams tarot 690 hexa. 3s and 13x5.5 propps. current is 20-27amps hovering in very windy weather.
got 12 mins on 6000mah 3s

I have been using Afro esc. Got sync issue on one esc and had to reflash to the latest 2013-10-.. firmware. Now i got 30 minutes in the fram from schratch build and all working very well!

verified_user Quality:
trending_up Value:
playlist_add_check Overall:

very nice motors. Running on a 2300grams tarot 690 hexa. 3s and 13x5.5 propps. current is 20-27amps hovering in very windy weather.
got 12 mins on 6000mah 3s

I have been using Afro esc. Got sync issue on one esc and had to reflash to the latest 2013-10-.. firmware. Now i got 30 minutes in the fram from schratch build and all working very well!

No mounting screws, that's a bit strange. Every other motor I have purchased from Hobbyking includes them so didn't thinks twice. With hindsight I should have picked it up from the photos. Hindsight is a wonderful thing.

verified_user Quality:
trending_up Value:
playlist_add_check Overall:

No mounting screws, that's a bit strange. Every other motor I have purchased from Hobbyking includes them so didn't thinks twice. With hindsight I should have picked it up from the photos. Hindsight is a wonderful thing.

Customer files
3508-700kv thrust data Download [169]
Upload your file

Only registered users can upload files.
Please log in or register to start helping your fellow hobbyists today!

Related Tags