New Items Foro
Registrarse

Total Price

0,00 €

Cesta 0 Cesta 0 Loading...

4108-480KV Turnigy Multistar 22 Polo sin escobillas Multi-rotor del motor con cables extra largas

4108-480KV Turnigy Multistar 22 Polo sin escobillas Multi-rotor del motor con cables extra largas

Shipped From:
  • USA
  • Global
QTY:

Now save guardar 0,00 € 0,00 €

29,86 €
Estado:
En stock
Peso:
169 g
SKU:
9392000031-0
WANT FREE SHIPPING? Click here to find out more!

Buscando el sistema de energía final para su próximo proyecto multi-rotor? ¡No busque más!
Los outrunners Turnigy MultiSTAR están diseñados con una cosa en mente - maximizando el rendimiento del Multi-rotor! Cuentan con imanes 45SH de gama alta, los cojinetes de NMB de alta calidad y los recuentos de postes altos para reducir el ruido, la potencia suave y sensible y una mayor eficiencia. Tienen montaje de encargo del motor y todos son de precisión equilibrada para un funcionamiento suave, estos motores están diseñados específicamente para su uso multi-rotor y no se basan en motores de avión.

El MultiStar 4108-480kv es casi demasiado bueno para volar! La mano de obra y detalle en este motor es a un nivel totalmente nuevo. Está equipado con rodamientos de NMB y calzar precargados y tiene 570 mm alambres de silicio graduado de la high largos. Tiene la doble hélice de montaje, ya sea un tornillo en el centro de eje de la hélice de 6 mm o 12 mm de separación del perno de fijación arrojaron prop con una precisión arandela de empuje superior para una gama ilimitada de los apoyos. Y con 22P24S polo contar con su suave eficiente y tiene un montón de torque.

Multistar está simplificando el mundo de multi-rotores con su propósito construido línea de productos y tomar el trabajo de adivinar de su configuración.

Especificaciones:
KV (RPM / V): 480
Células Lipo: 4-6s
Corriente máxima: 380w
Amps max: 22A
Sin corriente de carga: 0.6A / 10v
Resistencia interna: .0128ohm
Número de polos: 22P24S (24 22poles estatores)
Dimensiones (Dia.xL): 47 x 26 mm
Eje del Motor: 4 mm
del eje de propulsión: perno de 6 mm en el hoyo concentrador o 12 mm de agujero para perno arrojó apoyos estilo
Peso: 111 g
espaciamiento de taladros: 19 mm * 25 mm

  • SKU (Número de Referencia) 9392000031-0
  • Brand MultiStar
  • Peso ( g) 169.00
  • Longitud 85.00
  • Ancho 45.00
  • Altura 60.00
  • Kv (rpm / v) 480.00
  • Corrientes max (A) 22.00
  • Resistencia ( MH ) 172.00
  • Max Voltaje ( V ) 25.00
  • Potencia ( W ) 380.00
  • Un eje ( mm ) 4.00
  • B Longitud ( mm ) 26.00
  • C Diámetro ( mm ) 27.00
  • Puede longitud D ( mm ) 12.00
  • Longitud Total E ( mm ) 36.00
  • Hexcopter Endurance Test
Upload video

Only registered users can upload video. Please, log in or register

Only registered users can write reviews. Please, sign in or sign up

no way to get it work. i have desync issue with 5/5 of theese motors. I tried with different escs, simonk an blheli and every time in certain rpm range the motor produces a loud sound and randomly stops. Very dangerous.

verified_user Quality:
trending_up Value:
playlist_add_check Overall:

no way to get it work. i have desync issue with 5/5 of theese motors. I tried with different escs, simonk an blheli and every time in certain rpm range the motor produces a loud sound and randomly stops. Very dangerous.

muy buenos moteres gran fuerza al despege, les doy caa dia si dia no y todavia sin fallos toquemos madera los recomiendo

verified_user Quality:
trending_up Value:
playlist_add_check Overall:

muy buenos moteres gran fuerza al despege, les doy caa dia si dia no y todavia sin fallos toquemos madera los recomiendo

Nice build quality. Very smooth rotation. No flaws upon receipt. All hardware is of good quality.

verified_user Quality:
trending_up Value:
playlist_add_check Overall:

Nice build quality. Very smooth rotation. No flaws upon receipt. All hardware is of good quality.

Purchased three of these motors for a Tricopter due to lack of time I started to work on this set up four months later and realized one of these motors arrived with broken ball bearing. The other two motors look and work perfect.
Motor with defective bearing is getting stuck when rotated by hand so now I will have to look for the replacement parts for the never used motor.
HK please pay attention to these small details during your QC.
Thanks.

verified_user Quality:
trending_up Value:
playlist_add_check Overall:

Purchased three of these motors for a Tricopter due to lack of time I started to work on this set up four months later and realized one of these motors arrived with broken ball bearing. The other two motors look and work perfect.
Motor with defective bearing is getting stuck when rotated by hand so now I will have to look for the replacement parts for the never used motor.
HK please pay attention to these small details during your QC.
Thanks.

Excellent motors for the price. Very smooth and efficient . Installed with 14" 4.5 t-props , 30A esc , Tarot FY650 , Tarot gimbal with GP3 , Naz M ,5000mAh 4s 25c, total weight 2.3kg . 15 minutes flight time ,low voltage warning set at 14.2v. Much better than the old multistar 4822 . Absolutely recommend these for your next quad build.

verified_user Quality:
trending_up Value:
playlist_add_check Overall:

Excellent motors for the price. Very smooth and efficient . Installed with 14" 4.5 t-props , 30A esc , Tarot FY650 , Tarot gimbal with GP3 , Naz M ,5000mAh 4s 25c, total weight 2.3kg . 15 minutes flight time ,low voltage warning set at 14.2v. Much better than the old multistar 4822 . Absolutely recommend these for your next quad build.

This motor seems to be perfect for my Talon Tricopter with extended booms. Weight of my tricopter is 1965g (including battery, GoPro 3 brushless gimbal) and I'm able to hover little bit over 21 minutes! (10pcnt of battery left). Hover @ 45~55pcnt throttle. My configuration is Talon Tricopter frame, 380 mm Carbon Fibre booms, Turnigy Multistar 4108-480KV motors, 15x5.5 DJI propellers, Turnigy 20A multistar ESCs with SimonK firmware, TGY-306G servo, ZIPPY Compact 5800mAh 4S 25C, Crius AIOP board with MegapirateNG firmware. I'm definitely gonna use these motors in my futher copters.

verified_user Quality:
trending_up Value:
playlist_add_check Overall:

This motor seems to be perfect for my Talon Tricopter with extended booms. Weight of my tricopter is 1965g (including battery, GoPro 3 brushless gimbal) and I'm able to hover little bit over 21 minutes! (10pcnt of battery left). Hover @ 45~55pcnt throttle. My configuration is Talon Tricopter frame, 380 mm Carbon Fibre booms, Turnigy Multistar 4108-480KV motors, 15x5.5 DJI propellers, Turnigy 20A multistar ESCs with SimonK firmware, TGY-306G servo, ZIPPY Compact 5800mAh 4S 25C, Crius AIOP board with MegapirateNG firmware. I'm definitely gonna use these motors in my futher copters.

Customer files
4108-480kv thrust data Download [114]
4108-480kv-2 thrust data Download [122]
Upload your file

Only registered users can upload files.
Please log in or register to start helping your fellow hobbyists today!

Related Tags