Registrarse

Product Finder

Configuración

Useful links

 
[["US","AU","GB","DE"]]
Registrarse
Shipped From:
  • Global

4108-600KV Turnigy Multistar 22 Polo sin escobillas Multi-rotor del motor con cables extra largas

4108-600KV Turnigy Multistar 22 Polo sin escobillas Multi-rotor del motor con...

QTY:

Now save guardar 0,00 € 0,00 €

26,92 €
Stock:
Peso:
169 g
SKU:
9392000032-0

Suggestion Box

Please let us know if you found any issues with this product listing.
We take our customer comments very seriously and in many cases our website modifications and product updates are a result of your comments!

Price War

If you've seen a product elsewhere for a better price, please let us know! HobbyKing pride themselves on offering the best price, so if there if you see something cheaper elsewhere, let us know!

Combine

essential items and
acc
Descripción
del

Buscando el sistema de energía final para su próximo proyecto multi-rotor? ¡No busque más!
Los outrunners Turnigy MultiSTAR están diseñados con una cosa en mente - maximizando el rendimiento del Multi-rotor! Cuentan con imanes 45SH de gama alta, los cojinetes de NMB de alta calidad y los recuentos de postes altos para reducir el ruido, la potencia suave y sensible y una mayor eficiencia. Tienen montaje de encargo del motor y todos son de precisión equilibrada para un funcionamiento suave, estos motores están diseñados específicamente para su uso multi-rotor y no se basan en motores de avión.

El 4108-600 MultiStar es casi demasiado bueno para volar! La mano de obra y detalle en este motor es a un nivel totalmente nuevo. Está equipado con rodamientos de NMB y calzar precargados y tiene 570 mm alambres de silicio graduado de la high largos. Tiene la doble hélice de montaje, ya sea un tornillo en el centro de eje de la hélice de 6 mm o 12 mm de separación del perno de fijación arrojaron prop con una precisión arandela de empuje superior para una gama ilimitada de los apoyos. Y con 22P24S polo contar con su suave eficiente y tiene un montón de torque.

Multistar está simplificando el mundo de multi-rotores con su propósito construido línea de productos y tomar el trabajo de adivinar de su configuración.

Especificaciones:
KV (RPM / V): 600
Células Lipo: 4-6s
Corriente máxima: 400w
Amps max: 26A
Sin corriente de carga: 0.9A / 10v
Resistencia interna: .098ohm
Número de polos: 22P24S (24 22poles estatores)
Dimensiones (Dia.xL): 47 x 26 mm
Eje del Motor: 4 mm
del eje de propulsión: perno de 6 mm en el hoyo concentrador o 12 mm de agujero para perno arrojó apoyos estilo
Peso: 111 g
espaciamiento de taladros: 19 mm * 25 mm

Product
Specifications

Información adicional

  • SKU (Número de Referencia):
    9392000032-0
  • Brand:
    MultiStar
  • Peso ( g)
    169.00
  • Longitud
    85.00
  • Ancho:
    45.00
  • Altura:
    60.00
  • Kv (rpm / v)
    600.00
  • Corrientes max (A)
    26.00
  • Potencia ( W ):
    400.00
  • B Longitud ( mm ):
    26.00
  • Puede longitud D ( mm )
    12.00
  • Max Voltaje ( V )
    0.00
  • Un eje ( mm ):
    4.00
  • Unit Weight (g):
    111
  • C Diámetro ( mm )
    47.00
  • Longitud Total E ( mm )
    37.00
  • Resistencia ( MH ):
    0.00
Community
Discussions
Rate&
Review

Escribir Tu Propia Revisión

Only registered users can write reviews. Please, sign in or sign up

verified_user Quality
trending_up Value
playlist_add_check Overall
These are probably some of the best motors you can get at this price point. I didn't see the part where it said extra long leads, so I got a nice amount of silicone wire as well after I clipped most of it off. Using these with 13x5.5 props, Tarot 680 Pro and on 2x5000Mah 4S batteries in parallel.
verified_user Quality
trending_up Value
playlist_add_check Overall
verified_user Quality
trending_up Value
playlist_add_check Overall
I can't get close to the efficiency shown in the tables in files tab. I made my own ones as you can see on "Prop Motor specs.pdf" in files tab. Maybe to bad propellers? Motors could be better balanced, you can feel some vibration without propellers and makes a very strong sound at low speeds. I bought 6 of them performing in the same way.
verified_user Quality
trending_up Value
playlist_add_check Overall
verified_user Quality
trending_up Value
playlist_add_check Overall
Quiet, smooth and powerful.
We'll see in the future if the bearings are on par with the rest! : )
verified_user Quality
trending_up Value
playlist_add_check Overall
verified_user Quality
trending_up Value
playlist_add_check Overall
I use these motors on a tricopter. Going to get 3 more to make a Y6. They are awesome. They look incredible, and you can just feel the quality. They run quietly, with low vibrations and they spin 12x4.5 props on 4s without even warming up a little. I highly recommend them!
verified_user Quality
trending_up Value
playlist_add_check Overall
verified_user Quality
trending_up Value
playlist_add_check Overall
Excellent well balanced motor, although it states 4-6s I have been using this with 2x 5000mah 3s @ 11.1v batteries on a Tarot 650 with 12x5 and 13x5 props.
I get around 35-45 minutes flight time with the 12x5 carbon props.

verified_user Quality
trending_up Value
playlist_add_check Overall
verified_user Quality
trending_up Value
playlist_add_check Overall
Moteur idal pour le Tarot 650, utilis avec des 13x4 ou 12x4.5, son agrable et bien quilibrs.

A acheter les yeux ferms!
verified_user Quality
trending_up Value
playlist_add_check Overall
verified_user Quality
trending_up Value
playlist_add_check Overall
Excellent motor! Best for the Tarot Iron Man 650 Quad!! Very smooth running on 13x4 CFK props!
verified_user Quality
trending_up Value
playlist_add_check Overall
verified_user Quality
trending_up Value
playlist_add_check Overall
Did some testing today. All on 4S with an Afro 30Amp ESC.
Max prop is 12x3.8 APC 426.9Watt, 26.9Amp, 15.8V. A bit over 400Watt. Is no problem on a quad.
Sound is good. Motor is very quite and rather good ballanced out of the box.
Also tried an APC 11x4.7. It ran at max throttle with 336.8Watt, 21.1Amp, 15.8Volt.
So my choise is a 12X3.8 APC
Can't Judge about quality. It's brand new. See how it takes.
Bye! Hope you can use this!

verified_user Quality
trending_up Value
playlist_add_check Overall
Upload
Videos
Upload video
Upload
Files

Only registered users can upload files. Please log in or register to start helping your fellow hobbyists today!

Combine

essential items and
acc

Etiqueta de Producto

Utiliza espacios para separar las etiquetas. Usa comillas simples (') para expresiones.