Registrarse

Product Finder

Configuración

Useful links

Chat en vivo
 
[["US","AU","GB","DE"]]
Registrarse
Shipped From:
  • USA
  • Global

4112-320KV Turnigy Multistar 22 Polo sin escobillas Multi-rotor del motor con cables extra largas

4112-320KV Turnigy Multistar 22 Polo sin escobillas Multi-rotor del motor con...

QTY:

Now save guardar 0,00 € 0,00 €

34,44 €
Stock:
Peso:
213 g
SKU:
9392000033-0

Suggestion Box

Please let us know if you found any issues with this product listing.
We take our customer comments very seriously and in many cases our website modifications and product updates are a result of your comments!

Price War

If you've seen a product elsewhere for a better price, please let us know! HobbyKing pride themselves on offering the best price, so if there if you see something cheaper elsewhere, let us know!

Combine

essential items and
acc
Descripción
del

Buscando el sistema de energía final para su próximo proyecto multi-rotor? ¡No busque más!
Los outrunners Turnigy MultiSTAR están diseñados con una cosa en mente - maximizando el rendimiento del Multi-rotor! Cuentan con imanes 45SH de gama alta, los cojinetes de NMB de alta calidad y los recuentos de postes altos para reducir el ruido, la potencia suave y sensible y una mayor eficiencia. Tienen montaje de encargo del motor y todos son de precisión equilibrada para un funcionamiento suave, estos motores están diseñados específicamente para su uso multi-rotor y no se basan en motores de avión.

El 4112-320KV MultiStar es casi demasiado bueno para volar! La mano de obra y detalle en este motor es a un nivel totalmente nuevo. Está equipado con rodamientos de NMB y calzar precargados y tiene 570 mm alambres de silicio graduado de la high largos. Tiene la doble hélice de montaje, ya sea un tornillo en el centro de eje de la hélice de 6 mm o 12 mm de separación del perno de fijación arrojaron prop con una precisión arandela de empuje superior para una gama ilimitada de los apoyos. Y con 22P24S polo contar con su suave eficiente y tiene un montón de torque.

Multistar está simplificando el mundo de multi-rotores con su propósito construido línea de productos y tomar el trabajo de adivinar de su configuración.

Especificaciones:
KV (RPM / V): 320
Células Lipo: 4-8s
Potencia máxima: 660W
Amps max: 20A
Sin corriente de carga: 0.5A / 10V
Resistencia interna: .172ohm
Número de polos: 22P24S (24 22poles estatores)
Dimensiones (Dia.xL): 46,6 x 29,8 mm
Eje del motor: 5 mm
del eje de propulsión: perno de 6 mm en el hoyo concentrador o 12 mm de agujero para perno arrojó apoyos estilo
Peso: 147 g
espaciamiento de taladros: 19 mm * 25 mm

Product
Specifications

Información adicional

  • SKU (Número de Referencia):
    9392000033-0
  • Brand:
    MultiStar
  • Peso ( g)
    213.00
  • Longitud
    85.00
  • Ancho:
    45.00
  • Altura:
    60.00
  • Kv (rpm / v)
    320.00
  • Corrientes max (A)
    20.00
  • Potencia ( W ):
    660.00
  • B Longitud ( mm ):
    30.00
  • Puede longitud D ( mm )
    15.00
  • Max Voltaje ( V )
    0.00
  • Un eje ( mm ):
    5.00
  • Unit Weight (g):
    147
  • C Diámetro ( mm )
    47.00
  • Longitud Total E ( mm )
    40.00
  • Resistencia ( MH ):
    0.00
Community
Discussions
Rate&
Review

Escribir Tu Propia Revisión

Only registered users can write reviews. Please, sign in or sign up

verified_user Quality
trending_up Value
playlist_add_check Overall
You can't touch these for 40 bucks. I have more than 3 dozen flying in a bunch of different frames and NONE have ever failed. Take a 680 pro Tarot frame, 6 of these, 6 opto 45 amp esc's and a 5000 mah nano-tech battery, 14x5.5 props and it gets 19 minutes of time flying, not hovering. Even with a gimbal, it still gets close to 15. It would run much larger props but not on this frame, 14 is it. They will lift most anything and 8 of them on a 1140mm frame makes a super stable photography platform. With a WooKong controller and a decent camera, hollyweird quality pictures. Just right KV for 6S. Runs way under 90 degrees F. Easy on esc's. Work great on a split power system at 8S. So far everything we have tried has worked. I have sunnysky and T-motors as well as DJI, all good, all more expensive and none lasted any longer or performed better. You could say we like these!
verified_user Quality
trending_up Value
playlist_add_check Overall
verified_user Quality
trending_up Value
playlist_add_check Overall
I have purchase much more expensive outrunners in the past. Six of these with 16x5.5 props EASILY lifts my 1203mm hex (custom built) at 6.6kg. With 2 Zippy 8000mah batts I get 15 to over 20 mins. of time in the air. I will be testing 4 Turnigy-nano 5000 mah batts. (total weight less than the Zippys). Should get more time in the air. 4 hard test flights and the motors are performing very well. Just slightly warm to the touch after 15 mins.
verified_user Quality
trending_up Value
playlist_add_check Overall
verified_user Quality
trending_up Value
playlist_add_check Overall
Very strong motor! Great for big projects using 6s.
The main concern is about the build process. After using this motors I figure out that some vibration sounds that I was listening, is because some washer was not in the right place making the external part of the motor jump up and down causing the noise.
If you have this motor MAKE SURE to check the internal washers. In all of my 6 motors, 5 of them was missing whashers or they were not in the right place!
verified_user Quality
trending_up Value
playlist_add_check Overall
verified_user Quality
trending_up Value
playlist_add_check Overall
Two out of four failed within 2 hours of flight. Loose magnets on one and improper shimming on the other. HK is sending me replacements when they get back in stock. When working correctly they can lift a house.
verified_user Quality
trending_up Value
playlist_add_check Overall
Upload
Videos
Upload video
Upload
Files

Only registered users can upload files. Please log in or register to start helping your fellow hobbyists today!

Combine

essential items and
acc

Etiqueta de Producto

Otras personas han destacado este producto con estas etiquetas:

Utiliza espacios para separar las etiquetas. Usa comillas simples (') para expresiones.