S'inscrire

Product Finder

Options

Useful links

Discussion en temps réel
 
[["US","AU","GB","DE"]]
S'inscrire
Shipped From:
  • USA
  • Global

4108-480KV Turnigy Multistar 22 Pole Brushless multi Rotor-moteur Avec Leads Extra Long

4108-480KV Turnigy Multistar 22 Pole Brushless multi Rotor-moteur Avec Leads ...

QTY:

Now save enregistrer 0,00 € 0,00 €

28,33 €
Rating:
Stock:
Poids
169 g
SKU:
9392000031-0

Suggestion Box

Please let us know if you found any issues with this product listing.
We take our customer comments very seriously and in many cases our website modifications and product updates are a result of your comments!

Meilleur prix

HobbyKing s'engage à vous offrir les meilleurs prix. Si vous avez vu ce produit autre part pour moins cher, merci de nous le faire savoir!

Combinez

et économisez plus
acc
Description
du

Vous recherchez le système d'alimentation ultime pour votre projet multi-rotor prochain? Cherchez pas plus loin!
Les outrunners Turnigy Multistar sont conçus avec une chose à l'esprit - maximiser la performance multi-rotor! Ils disposent d'aimants 45SH haut de gamme, roulements NMB de haute qualité et hauts Polonais compte pour moins de bruit, la puissance lisse et souple et une efficacité accrue. Ils ont le montage du moteur sur mesure et tous sont de précision équilibré pour le bon fonctionnement, ces moteurs sont conçus spécifiquement pour une utilisation multi-rotor et ne sont pas basées sur des moteurs d'avion.

Le 4108-480kv MultiStar est presque trop belle pour voler! La finition et les détails de ce moteur est à un tout nouveau niveau. Il est équipé de roulements NMB calées et pré-chargés et a 570mm longs fils de silicium grad élevés. Il a la double hélice de montage, soit un boulon sur 6mm moyeu arbre d'hélice ou le boulon 12mm d'espacement jeté attachement prop avec une précision supérieure rondelle de butée pour une gamme illimitée d'accessoires. Et avec 22P24S pôle compter son bon efficace et a des charges de couple.

Multistar simplifie le monde de Multi-Rotors avec leur gamme de produits construit à cet effet et en prenant la conjecture hors de votre configuration.

Spécifications:
KV (RPM / V): 480
Cellules Lipo: 4-6S
Courant max: 380W
Max Amps: 22A
Non Courant de charge: 0.6A / 10v
Résistance interne: .0128ohm
Nombre de pôles: 22P24S (22poles 24 stators)
Dimensions (Dia.xL): 47 x 26mm
Moteur arbre: 4 mm
prop arbre: boulon de 6mm sur le trou de moyeu ou 12mm trou pour boulon a jeté des accessoires de style
Poids: 111g
espacement des trous: 19mm * 25mm

Product
Specifications

Informations supplémentaires

  • Référence:
    9392000031-0
  • Brand:
    MultiStar
  • Poids (g)
    169.00
  • Longueur
    85.00
  • Largeur:
    45.00
  • Taille:
    60.00
  • Kv ( rpm / v)
    480.00
  • Max Currents (A)
    22.00
  • (W ):
    380.00
  • Longueur B ( mm ):
    26.00
  • Longueur Can D ( mm )
    12.00
  • Max Tension (V)
    0.00
  • Arbre A ( mm ):
    4.00
  • Unit Weight (g):
    111
  • Diamètre C ( mm )
    27.00
  • Longueur totale E ( mm )
    36.00
  • Résistance ( mh ):
    0.00
Community
Discussions
Rate&
Review

Écrivez votre propre avis

Only registered users can write reviews. Please, sign in or sign up

verified_user Quality
trending_up Value
playlist_add_check Overall
no way to get it work. i have desync issue with 5/5 of theese motors. I tried with different escs, simonk an blheli and every time in certain rpm range the motor produces a loud sound and randomly stops. Very dangerous.
verified_user Quality
trending_up Value
playlist_add_check Overall
verified_user Quality
trending_up Value
playlist_add_check Overall
muy buenos moteres gran fuerza al despege, les doy caa dia si dia no y todavia sin fallos toquemos madera los recomiendo
verified_user Quality
trending_up Value
playlist_add_check Overall
verified_user Quality
trending_up Value
playlist_add_check Overall
Nice build quality. Very smooth rotation. No flaws upon receipt. All hardware is of good quality.
verified_user Quality
trending_up Value
playlist_add_check Overall
verified_user Quality
trending_up Value
playlist_add_check Overall
Purchased three of these motors for a Tricopter due to lack of time I started to work on this set up four months later and realized one of these motors arrived with broken ball bearing. The other two motors look and work perfect.
Motor with defective bearing is getting stuck when rotated by hand so now I will have to look for the replacement parts for the never used motor.
HK please pay attention to these small details during your QC.
Thanks.
verified_user Quality
trending_up Value
playlist_add_check Overall
verified_user Quality
trending_up Value
playlist_add_check Overall
Excellent motors for the price. Very smooth and efficient . Installed with 14" 4.5 t-props , 30A esc , Tarot FY650 , Tarot gimbal with GP3 , Naz M ,5000mAh 4s 25c, total weight 2.3kg . 15 minutes flight time ,low voltage warning set at 14.2v. Much better than the old multistar 4822 . Absolutely recommend these for your next quad build.
verified_user Quality
trending_up Value
playlist_add_check Overall
verified_user Quality
trending_up Value
playlist_add_check Overall
This motor seems to be perfect for my Talon Tricopter with extended booms. Weight of my tricopter is 1965g (including battery, GoPro 3 brushless gimbal) and I'm able to hover little bit over 21 minutes! (10pcnt of battery left). Hover @ 45~55pcnt throttle. My configuration is Talon Tricopter frame, 380 mm Carbon Fibre booms, Turnigy Multistar 4108-480KV motors, 15x5.5 DJI propellers, Turnigy 20A multistar ESCs with SimonK firmware, TGY-306G servo, ZIPPY Compact 5800mAh 4S 25C, Crius AIOP board with MegapirateNG firmware. I'm definitely gonna use these motors in my futher copters.
verified_user Quality
trending_up Value
playlist_add_check Overall
Upload
Videos
  • Hexcopter Endurance Test

Upload video
Upload
Files

Seuls les utilisateurs identifiés peuvent télécharger les fichiers. Merci de vous connecter ou de vous enregistrer pour commencer à aider les autres membres dès aujourd'hui!

Combinez

et économisez plus
acc

Étiquettes des produits

D'autres personnes ont tagué ce produit avec :

Utiliser des espaces pour séparer les étiquettes. Utilisez des apostrophes pour les phrases.