S'inscrire

Product Finder

Options

Useful links

 
[["US","AU","GB","DE"]]
S'inscrire
Shipped From:
  • Global

4108-600KV Turnigy Multistar 22 Pole Brushless multi Rotor-moteur Avec Leads Extra Long

4108-600KV Turnigy Multistar 22 Pole Brushless multi Rotor-moteur Avec Leads ...

QTY:

Now save enregistrer 0,00 € 0,00 €

26,64 €
Rating:
Stock:
Poids
169 g
SKU:
9392000032-0

Suggestion Box

Please let us know if you found any issues with this product listing.
We take our customer comments very seriously and in many cases our website modifications and product updates are a result of your comments!

Meilleur prix

HobbyKing s'engage à vous offrir les meilleurs prix. Si vous avez vu ce produit autre part pour moins cher, merci de nous le faire savoir!

Combinez

et économisez plus
acc
Description
du

Vous recherchez le système d'alimentation ultime pour votre projet multi-rotor prochain? Cherchez pas plus loin!
Les outrunners Turnigy Multistar sont conçus avec une chose à l'esprit - maximiser la performance multi-rotor! Ils disposent d'aimants 45SH haut de gamme, roulements NMB de haute qualité et hauts Polonais compte pour moins de bruit, la puissance lisse et souple et une efficacité accrue. Ils ont le montage du moteur sur mesure et tous sont de précision équilibré pour le bon fonctionnement, ces moteurs sont conçus spécifiquement pour une utilisation multi-rotor et ne sont pas basées sur des moteurs d'avion.

Le 4108-600 MultiStar est presque trop belle pour voler! La finition et les détails de ce moteur est à un tout nouveau niveau. Il est équipé de roulements NMB calées et pré-chargés et a 570mm longs fils de silicium grad élevés. Il a la double hélice de montage, soit un boulon sur 6mm moyeu arbre d'hélice ou le boulon 12mm d'espacement jeté attachement prop avec une précision supérieure rondelle de butée pour une gamme illimitée d'accessoires. Et avec 22P24S pôle compter son bon efficace et a des charges de couple.

Multistar simplifie le monde de Multi-Rotors avec leur gamme de produits construit à cet effet et en prenant la conjecture hors de votre configuration.

Spécifications:
KV (RPM / V): 600
Cellules Lipo: 4-6S
Courant max: 400w
Max Amps: 26A
Non Courant de charge: 0.9A / 10v
Résistance interne: .098ohm
Nombre de pôles: 22P24S (22poles 24 stators)
Dimensions (Dia.xL): 47 x 26mm
Moteur arbre: 4 mm
prop arbre: boulon de 6mm sur le trou de moyeu ou 12mm trou pour boulon a jeté des accessoires de style
Poids: 111g
espacement des trous: 19mm * 25mm

Product
Specifications

Informations supplémentaires

  • Référence:
    9392000032-0
  • Brand:
    MultiStar
  • Poids (g)
    169.00
  • Longueur
    85.00
  • Largeur:
    45.00
  • Taille:
    60.00
  • Kv ( rpm / v)
    600.00
  • Max Currents (A)
    26.00
  • (W ):
    400.00
  • Longueur B ( mm ):
    26.00
  • Longueur Can D ( mm )
    12.00
  • Max Tension (V)
    0.00
  • Arbre A ( mm ):
    4.00
  • Unit Weight (g):
    111
  • Diamètre C ( mm )
    47.00
  • Longueur totale E ( mm )
    37.00
  • Résistance ( mh ):
    0.00
Community
Discussions
Rate&
Review

Écrivez votre propre avis

Only registered users can write reviews. Please, sign in or sign up

Quality
Value
Overall
These are probably some of the best motors you can get at this price point. I didn't see the part where it said extra long leads, so I got a nice amount of silicone wire as well after I clipped most of it off. Using these with 13x5.5 props, Tarot 680 Pro and on 2x5000Mah 4S batteries in parallel.
Quality
Value
Overall
Quality
Value
Overall
I can't get close to the efficiency shown in the tables in files tab. I made my own ones as you can see on "Prop Motor specs.pdf" in files tab. Maybe to bad propellers? Motors could be better balanced, you can feel some vibration without propellers and makes a very strong sound at low speeds. I bought 6 of them performing in the same way.
Quality
Value
Overall
Quality
Value
Overall
Quiet, smooth and powerful.
We'll see in the future if the bearings are on par with the rest! : )
Quality
Value
Overall
Quality
Value
Overall
I use these motors on a tricopter. Going to get 3 more to make a Y6. They are awesome. They look incredible, and you can just feel the quality. They run quietly, with low vibrations and they spin 12x4.5 props on 4s without even warming up a little. I highly recommend them!
Quality
Value
Overall
Quality
Value
Overall
Excellent well balanced motor, although it states 4-6s I have been using this with 2x 5000mah 3s @ 11.1v batteries on a Tarot 650 with 12x5 and 13x5 props.
I get around 35-45 minutes flight time with the 12x5 carbon props.

Quality
Value
Overall
Quality
Value
Overall
Moteur idal pour le Tarot 650, utilis avec des 13x4 ou 12x4.5, son agrable et bien quilibrs.

A acheter les yeux ferms!
Quality
Value
Overall
Quality
Value
Overall
Excellent motor! Best for the Tarot Iron Man 650 Quad!! Very smooth running on 13x4 CFK props!
Quality
Value
Overall
Quality
Value
Overall
Did some testing today. All on 4S with an Afro 30Amp ESC.
Max prop is 12x3.8 APC 426.9Watt, 26.9Amp, 15.8V. A bit over 400Watt. Is no problem on a quad.
Sound is good. Motor is very quite and rather good ballanced out of the box.
Also tried an APC 11x4.7. It ran at max throttle with 336.8Watt, 21.1Amp, 15.8Volt.
So my choise is a 12X3.8 APC
Can't Judge about quality. It's brand new. See how it takes.
Bye! Hope you can use this!

Quality
Value
Overall
Upload
Videos
Upload video
Upload
Files

Seuls les utilisateurs identifiés peuvent télécharger les fichiers. Merci de vous connecter ou de vous enregistrer pour commencer à aider les autres membres dès aujourd'hui!

Combinez

et économisez plus
acc

Étiquettes des produits

Utiliser des espaces pour séparer les étiquettes. Utilisez des apostrophes pour les phrases.