S'inscrire

Product Finder

Options

Useful links

 
[["US","AU","GB","DE"]]
S'inscrire
Shipped From:
  • Global
  • USA

4112-320KV Turnigy Multistar 22 Pole Brushless multi Rotor-moteur Avec Leads Extra Long

4112-320KV Turnigy Multistar 22 Pole Brushless multi Rotor-moteur Avec Leads ...

QTY:

Now save enregistrer 0,00 € 0,00 €

34,33 €
Rating:
Stock:
Poids
213 g
SKU:
9392000033-0

Suggestion Box

Please let us know if you found any issues with this product listing.
We take our customer comments very seriously and in many cases our website modifications and product updates are a result of your comments!

Meilleur prix

HobbyKing s'engage à vous offrir les meilleurs prix. Si vous avez vu ce produit autre part pour moins cher, merci de nous le faire savoir!

Combinez

et économisez plus
acc
Description
du

Vous recherchez le système d'alimentation ultime pour votre projet multi-rotor prochain? Cherchez pas plus loin!
Les outrunners Turnigy Multistar sont conçus avec une chose à l'esprit - maximiser la performance multi-rotor! Ils disposent d'aimants 45SH haut de gamme, roulements NMB de haute qualité et hauts Polonais compte pour moins de bruit, la puissance lisse et souple et une efficacité accrue. Ils ont le montage du moteur sur mesure et tous sont de précision équilibré pour le bon fonctionnement, ces moteurs sont conçus spécifiquement pour une utilisation multi-rotor et ne sont pas basées sur des moteurs d'avion.

Le 4112-320KV MultiStar est presque trop belle pour voler! La finition et les détails de ce moteur est à un tout nouveau niveau. Il est équipé de roulements NMB calées et pré-chargés et a 570mm longs fils de silicium grad élevés. Il a la double hélice de montage, soit un boulon sur 6mm moyeu arbre d'hélice ou le boulon 12mm d'espacement jeté attachement prop avec une précision supérieure rondelle de butée pour une gamme illimitée d'accessoires. Et avec 22P24S pôle compter son bon efficace et a des charges de couple.

Multistar simplifie le monde de Multi-Rotors avec leur gamme de produits construit à cet effet et en prenant la conjecture hors de votre configuration.

Spécifications:
KV (RPM / V): 320
Cellules Lipo: 4-8s
Max Watt: 660W
Max Amps: 20A
Non Courant de charge: 0,5A / 10V
Résistance interne: .172ohm
Nombre de pôles: 22P24S (22poles 24 stators)
Dimensions (Dia.xL): 46,6 x 29,8 mm
Arbre du moteur: 5mm
prop arbre: boulon de 6mm sur le trou de moyeu ou 12mm trou pour boulon a jeté des accessoires de style
Poids: 147g
espacement des trous: 19mm * 25mm

Product
Specifications

Informations supplémentaires

  • Référence:
    9392000033-0
  • Brand:
    MultiStar
  • Poids (g)
    213.00
  • Longueur
    85.00
  • Largeur:
    45.00
  • Taille:
    60.00
  • Kv ( rpm / v)
    320.00
  • Max Currents (A)
    20.00
  • (W ):
    660.00
  • Longueur B ( mm ):
    30.00
  • Longueur Can D ( mm )
    15.00
  • Max Tension (V)
    0.00
  • Arbre A ( mm ):
    5.00
  • Unit Weight (g):
    147
  • Diamètre C ( mm )
    47.00
  • Longueur totale E ( mm )
    40.00
  • Résistance ( mh ):
    0.00
Community
Discussions
Rate&
Review

Écrivez votre propre avis

Only registered users can write reviews. Please, sign in or sign up

Quality
Value
Overall
You can't touch these for 40 bucks. I have more than 3 dozen flying in a bunch of different frames and NONE have ever failed. Take a 680 pro Tarot frame, 6 of these, 6 opto 45 amp esc's and a 5000 mah nano-tech battery, 14x5.5 props and it gets 19 minutes of time flying, not hovering. Even with a gimbal, it still gets close to 15. It would run much larger props but not on this frame, 14 is it. They will lift most anything and 8 of them on a 1140mm frame makes a super stable photography platform. With a WooKong controller and a decent camera, hollyweird quality pictures. Just right KV for 6S. Runs way under 90 degrees F. Easy on esc's. Work great on a split power system at 8S. So far everything we have tried has worked. I have sunnysky and T-motors as well as DJI, all good, all more expensive and none lasted any longer or performed better. You could say we like these!
Quality
Value
Overall
Quality
Value
Overall
I have purchase much more expensive outrunners in the past. Six of these with 16x5.5 props EASILY lifts my 1203mm hex (custom built) at 6.6kg. With 2 Zippy 8000mah batts I get 15 to over 20 mins. of time in the air. I will be testing 4 Turnigy-nano 5000 mah batts. (total weight less than the Zippys). Should get more time in the air. 4 hard test flights and the motors are performing very well. Just slightly warm to the touch after 15 mins.
Quality
Value
Overall
Quality
Value
Overall
Very strong motor! Great for big projects using 6s.
The main concern is about the build process. After using this motors I figure out that some vibration sounds that I was listening, is because some washer was not in the right place making the external part of the motor jump up and down causing the noise.
If you have this motor MAKE SURE to check the internal washers. In all of my 6 motors, 5 of them was missing whashers or they were not in the right place!
Quality
Value
Overall
Quality
Value
Overall
Two out of four failed within 2 hours of flight. Loose magnets on one and improper shimming on the other. HK is sending me replacements when they get back in stock. When working correctly they can lift a house.
Quality
Value
Overall
Upload
Videos
Upload video
Upload
Files

Seuls les utilisateurs identifiés peuvent télécharger les fichiers. Merci de vous connecter ou de vous enregistrer pour commencer à aider les autres membres dès aujourd'hui!

Combinez

et économisez plus
acc

Étiquettes des produits

Utiliser des espaces pour séparer les étiquettes. Utilisez des apostrophes pour les phrases.