Registrati

Product Finder

Impostazioni

Useful links

Chat dal vivo
 
[["US","AU","GB","DE"]]
Registrati
Shipped From:
  • Global

3508-700KV Turnigy Multistar 14 Pole Brushless Multi-rotore del motore con i cavi di lunghezza superiore

3508-700KV Turnigy Multistar 14 Pole Brushless Multi-rotore del motore con i ...

QTY:

Now save risparmia 0,00 € 0,00 €

26,85 €
Stock:
Peso:
157 g
SKU:
9392000024-0

Suggestion Box

Please let us know if you found any issues with this product listing.
We take our customer comments very seriously and in many cases our website modifications and product updates are a result of your comments!

Price War

If you've seen a product elsewhere for a better price, please let us know! HobbyKing pride themselves on offering the best price, so if there if you see something cheaper elsewhere, let us know!

Combine

essential items and
acc
Descrizione
prodotto

Cercando il sistema di alimentazione migliore per il vostro prossimo progetto Multi-rotore? Non guardare oltre!
I outrunners Turnigy Multistar sono progettati con una cosa in mente - massimizzare le prestazioni multi-rotore! Sono dotati di magneti 45SH di fascia alta, cuscinetti NMB di alta qualità e ad alta Pali conta per meno rumore, potere fluido e reattivo e una maggiore efficienza. Hanno il montaggio del motore personalizzato e tutti sono precisione equilibrato per silenziosità, questi motori sono progettati specificamente per l'uso multi-rotore e non si basano su motori aerei.

Il 3508-700KV MultiStar è quasi troppo bello per volare! La lavorazione e dettaglio in questo motore è a un livello completamente nuovo. E 'dotato di cuscinetti NMB spessorato e pre-caricato e ha 570mm fili di silicio grad alti lunghi. Si ha la doppia elica di montaggio, o un bullone su 6 millimetri mozzo dell'elica sull'albero o il bullone 12 millimetri spaziatura gettato attaccamento prop con una rondella di spinta superiore di precisione per una gamma illimitata di oggetti di scena. E con 14P12S polo contare la sua liscia efficiente e ha un sacco di coppia.

Multistar sta semplificando il mondo del multi-rotori con loro appositamente costruito linea di prodotti e di prendere la congettura risolve della configurazione.

Specifiche:
KV (RPM / V): 700
Celle Lipo: 3-4s
Max corrente: 360W
Max Amps: 28A
Corrente a vuoto: 0.5A / 10v
Resistenza interna: .083ohm
Numero di poli: 14P12S (14poles 12 statori)
Dimensioni (Dia.xL): 43 x 26 millimetri
ALBERO MOTORE: 4 mm
prop albero: bullone da 6 mm sul mozzo o 12 millimetri buca in buca per il bullone gettato puntelli stile
Peso: 102g
distanza tra i fori del bullone: ​​19mm * 25mm

Product
Specifications

Ulteriori informazioni

  • SKU:
    9392000024-0
  • Brand:
    MultiStar
  • Peso (g)
    157.00
  • Lunghezza
    85.00
  • Larghezza:
    45.00
  • Altezza:
    60.00
  • Kv ( rpm / v )
    700.00
  • Correnti Max (A)
    28.00
  • Potenza ( W ):
    360.00
  • Lunghezza B ( mm ):
    26.00
  • Can Lunghezza D ( mm )
    10.00
  • Max Tensione (V )
    0.00
  • Albero A ( mm ):
    4.00
  • Unit Weight (g):
    102
  • Diametro C ( mm )
    42.00
  • Lunghezza totale E ( mm )
    36.00
  • Resistenza ( mh ):
    0.00
Community
Discussions
Rate&
Review

Scrivi la tua recensione

Only registered users can write reviews. Please, sign in or sign up

verified_user Quality
trending_up Value
playlist_add_check Overall
This motor is pretty good and proper KV for 600-700 class Multicopter.
I installed this in my Tarrot 650 X-copter. with 12x4.5 and 11x4.5 APC prop.
Both setting of them works well. But 12-inch prop is better, It's more power.
I uses Hobbywing X-Rotor ESC - 40amp. Because it has connector on it's board, it's well fit with this motor's long load(it's good point also).
But, I think the quality of the bearing is quite poor. Some fall-off make the bearing get bad. But I recommend this motor for the 600-700 class multicopter strongly.
It's quite good.
verified_user Quality
trending_up Value
playlist_add_check Overall
verified_user Quality
trending_up Value
playlist_add_check Overall
very nice motors. Running on a 2300grams tarot 690 hexa. 3s and 13x5.5 propps. current is 20-27amps hovering in very windy weather.
got 12 mins on 6000mah 3s

I have been using Afro esc. Got sync issue on one esc and had to reflash to the latest 2013-10-.. firmware. Now i got 30 minutes in the fram from schratch build and all working very well!
verified_user Quality
trending_up Value
playlist_add_check Overall
verified_user Quality
trending_up Value
playlist_add_check Overall
No mounting screws, that's a bit strange. Every other motor I have purchased from Hobbyking includes them so didn't thinks twice. With hindsight I should have picked it up from the photos. Hindsight is a wonderful thing.
verified_user Quality
trending_up Value
playlist_add_check Overall
Upload
Videos
  • MultiStar Motors

Upload video
Upload
Files

Only registered users can upload files. Please log in or register to start helping your fellow hobbyists today!

file di clienti
3508-700kv thrust data Scaricare ora [169kb]

Combine

essential items and
acc

Tag prodotto

Altre persone hanno contrassegnato questo prodotto con questi tag:

Usa gli spazi per tag separati. Usa apostrofi singoli (') per frasi.