Registrati

Product Finder

Impostazioni

Useful links

Chat dal vivo
 
[["US","AU","GB","DE"]]
Registrati
Shipped From:
  • USA
  • Global

4112-320KV Turnigy Multistar 22 Pole Brushless Multi-rotore del motore con i cavi di lunghezza superiore

4112-320KV Turnigy Multistar 22 Pole Brushless Multi-rotore del motore con i ...

QTY:

Now save risparmia 0,00 € 0,00 €

35,01 €
Stock:
Peso:
213 g
SKU:
9392000033-0

Suggestion Box

Please let us know if you found any issues with this product listing.
We take our customer comments very seriously and in many cases our website modifications and product updates are a result of your comments!

Price War

If you've seen a product elsewhere for a better price, please let us know! HobbyKing pride themselves on offering the best price, so if there if you see something cheaper elsewhere, let us know!

Combine

essential items and
acc
Descrizione
prodotto

Cercando il sistema di alimentazione migliore per il vostro prossimo progetto Multi-rotore? Non guardare oltre!
I outrunners Turnigy Multistar sono progettati con una cosa in mente - massimizzare le prestazioni multi-rotore! Sono dotati di magneti 45SH di fascia alta, cuscinetti NMB di alta qualità e ad alta Pali conta per meno rumore, potere fluido e reattivo e una maggiore efficienza. Hanno il montaggio del motore personalizzato e tutti sono precisione equilibrato per silenziosità, questi motori sono progettati specificamente per l'uso multi-rotore e non si basano su motori aerei.

Il 4112-320KV MultiStar è quasi troppo bello per volare! La lavorazione e dettaglio in questo motore è a un livello completamente nuovo. E 'dotato di cuscinetti NMB spessorato e pre-caricato e ha 570mm fili di silicio grad alti lunghi. Si ha la doppia elica di montaggio, o un bullone su 6 millimetri mozzo dell'elica sull'albero o il bullone 12 millimetri spaziatura gettato attaccamento prop con una rondella di spinta superiore di precisione per una gamma illimitata di oggetti di scena. E con 22P24S polo contare la sua liscia efficiente e ha un sacco di coppia.

Multistar sta semplificando il mondo del multi-rotori con loro appositamente costruito linea di prodotti e di prendere la congettura risolve della configurazione.

Specifiche:
KV (RPM / V): 320
Celle Lipo: 4-8s
Max Watt: 660W
Max Amps: 20A
Corrente a vuoto: 0.5A / 10V
Resistenza interna: .172ohm
Numero di poli: 22P24S (22poles 24 statori)
Dimensioni (Dia.xL): 46,6 x 29,8 mm
ALBERO MOTORE: 5mm
prop albero: bullone da 6 mm sul mozzo o 12 millimetri buca in buca per il bullone gettato puntelli stile
Peso: 147g
distanza tra i fori del bullone: ​​19mm * 25mm

Product
Specifications

Ulteriori informazioni

  • SKU:
    9392000033-0
  • Brand:
    MultiStar
  • Peso (g)
    213.00
  • Lunghezza
    85.00
  • Larghezza:
    45.00
  • Altezza:
    60.00
  • Kv ( rpm / v )
    320.00
  • Correnti Max (A)
    20.00
  • Potenza ( W ):
    660.00
  • Lunghezza B ( mm ):
    30.00
  • Can Lunghezza D ( mm )
    15.00
  • Max Tensione (V )
    0.00
  • Albero A ( mm ):
    5.00
  • Unit Weight (g):
    147
  • Diametro C ( mm )
    47.00
  • Lunghezza totale E ( mm )
    40.00
  • Resistenza ( mh ):
    0.00
Community
Discussions
Rate&
Review

Scrivi la tua recensione

Only registered users can write reviews. Please, sign in or sign up

verified_user Quality
trending_up Value
playlist_add_check Overall
You can't touch these for 40 bucks. I have more than 3 dozen flying in a bunch of different frames and NONE have ever failed. Take a 680 pro Tarot frame, 6 of these, 6 opto 45 amp esc's and a 5000 mah nano-tech battery, 14x5.5 props and it gets 19 minutes of time flying, not hovering. Even with a gimbal, it still gets close to 15. It would run much larger props but not on this frame, 14 is it. They will lift most anything and 8 of them on a 1140mm frame makes a super stable photography platform. With a WooKong controller and a decent camera, hollyweird quality pictures. Just right KV for 6S. Runs way under 90 degrees F. Easy on esc's. Work great on a split power system at 8S. So far everything we have tried has worked. I have sunnysky and T-motors as well as DJI, all good, all more expensive and none lasted any longer or performed better. You could say we like these!
verified_user Quality
trending_up Value
playlist_add_check Overall
verified_user Quality
trending_up Value
playlist_add_check Overall
I have purchase much more expensive outrunners in the past. Six of these with 16x5.5 props EASILY lifts my 1203mm hex (custom built) at 6.6kg. With 2 Zippy 8000mah batts I get 15 to over 20 mins. of time in the air. I will be testing 4 Turnigy-nano 5000 mah batts. (total weight less than the Zippys). Should get more time in the air. 4 hard test flights and the motors are performing very well. Just slightly warm to the touch after 15 mins.
verified_user Quality
trending_up Value
playlist_add_check Overall
verified_user Quality
trending_up Value
playlist_add_check Overall
Very strong motor! Great for big projects using 6s.
The main concern is about the build process. After using this motors I figure out that some vibration sounds that I was listening, is because some washer was not in the right place making the external part of the motor jump up and down causing the noise.
If you have this motor MAKE SURE to check the internal washers. In all of my 6 motors, 5 of them was missing whashers or they were not in the right place!
verified_user Quality
trending_up Value
playlist_add_check Overall
verified_user Quality
trending_up Value
playlist_add_check Overall
Two out of four failed within 2 hours of flight. Loose magnets on one and improper shimming on the other. HK is sending me replacements when they get back in stock. When working correctly they can lift a house.
verified_user Quality
trending_up Value
playlist_add_check Overall
Upload
Videos
Upload video
Upload
Files

Only registered users can upload files. Please log in or register to start helping your fellow hobbyists today!

Combine

essential items and
acc

Tag prodotto

Altre persone hanno contrassegnato questo prodotto con questi tag:

Usa gli spazi per tag separati. Usa apostrofi singoli (') per frasi.