新規登録

Product Finder

設定

Useful links

 
[["US","AU","GB","DE"]]
新規登録
Shipped From:
  • Global
  • USA

4108-480KV Turnigy Multistarエクストラロングリードで22ポールブラシレスマルチローターモーター

4108-480KV Turnigy Multistarエクストラロングリードで22ポールブラシレスマルチローターモーター

QTY:

Now save save AU$0.00 AU$0.00

AU$41.23
Stock:
重量:
169 g
SKU:
9392000031-0

Suggestion Box

Please let us know if you found any issues with this product listing.
We take our customer comments very seriously and in many cases our website modifications and product updates are a result of your comments!

Price War

If you've seen a product elsewhere for a better price, please let us know! HobbyKing pride themselves on offering the best price, so if there if you see something cheaper elsewhere, let us know!

Combine

essential items and
acc
商品概要

あなたの次のマルチローターのプロジェクトのための究極の電力システムをお探しですか?これ以上探さない!
マルチローターの性能を最大化 - Turnigy Multistarのアウトランナーズを念頭に置いて一つのことで設計されています!彼らは、ノイズの少ない、滑らかで応答性のパワーと効率向上のためのハイエンド45SHマグネット、高品質のNMBベアリングと高ポーランドカウントを備えています。彼らは、モーターがスムーズな走行のためにバランスの精度であり、これらのモータは、マルチローターの使用のために特別に設計されており、飛行機のモーターに基づいていない取り付けおよびすべてのカスタムを持っています。

4108-480kv MultiStarは飛ぶことはほとんどあまりにもいいです!このモータでは技量および詳細は、全く新しいレベルです。これは、シムとプリロードされたNMBベアリングを装備し、570ミリメートル長い高卒業生シリコン細線を持っています。それは二重の小道具は、いずれか6ミリメートルシャフトのプロペラハブのボルトまたは12ミリメートル間隔ボルトは小道具の無制限の範囲の精度上スラストワッシャとプロペラの取り付けを投げ、マウントされています。そして22P24Sポールとの円滑な効率的をカウントし、トルクの負荷を持っています。

Multistarは、その目的内蔵の製品ラインでマルチローターの世界を簡素化し、あなたのセットアップのうち当て推量を取っています。

仕様:
KV(RPM / V):480
リポ細胞:4-6s
マックス現在:380ワット
最大アンペア:22A
無負荷電流:0.6A / 10V
内部抵抗:.0128ohm
極数:22P24S(24ステータを22poles)
外形寸法(Dia.xL):47のx 26ミリメートル
モーターシャフト:4ミリメートル
シャフトを支える: ボルト用 ​​の穴にハブまたは12ミリメートルの穴に6ミリメートルのボルトは、スタイルの小道具を投げました
重さ:111グラム
ボルト穴の間隔:19ミリメートルの* 25ミリメートル

Product
Specifications

追加情報

  • 単位:
    9392000031-0
  • Brand:
    MultiStar
  • 重量(g )
    169.00
  • 長さ
    85.00
  • Width:
    45.00
  • 高さ:
    60.00
  • KV ( RPM / V )
    480.00
  • 最大電流( A )
    22.00
  • 電力( W ):
    380.00
  • 長さB ( mm)の:
    26.00
  • ことができます長さD (ミリメートル)
    12.00
  • 最大電圧( V )
    0.00
  • シャフトA (ミリメートル):
    4.00
  • Unit Weight (g):
    111
  • 直径C (ミリメートル)
    27.00
  • 総丈E (ミリメートル)
    36.00
  • 抵抗( MH ):
    0.00
Community
Discussions
Rate&
Review

あなたのレビューを投稿する

Only registered users can write reviews. Please, sign in or sign up

Quality
Value
Overall
no way to get it work. i have desync issue with 5/5 of theese motors. I tried with different escs, simonk an blheli and every time in certain rpm range the motor produces a loud sound and randomly stops. Very dangerous.
Quality
Value
Overall
Quality
Value
Overall
muy buenos moteres gran fuerza al despege, les doy caa dia si dia no y todavia sin fallos toquemos madera los recomiendo
Quality
Value
Overall
Quality
Value
Overall
Nice build quality. Very smooth rotation. No flaws upon receipt. All hardware is of good quality.
Quality
Value
Overall
Quality
Value
Overall
Purchased three of these motors for a Tricopter due to lack of time I started to work on this set up four months later and realized one of these motors arrived with broken ball bearing. The other two motors look and work perfect.
Motor with defective bearing is getting stuck when rotated by hand so now I will have to look for the replacement parts for the never used motor.
HK please pay attention to these small details during your QC.
Thanks.
Quality
Value
Overall
Quality
Value
Overall
Excellent motors for the price. Very smooth and efficient . Installed with 14" 4.5 t-props , 30A esc , Tarot FY650 , Tarot gimbal with GP3 , Naz M ,5000mAh 4s 25c, total weight 2.3kg . 15 minutes flight time ,low voltage warning set at 14.2v. Much better than the old multistar 4822 . Absolutely recommend these for your next quad build.
Quality
Value
Overall
Quality
Value
Overall
This motor seems to be perfect for my Talon Tricopter with extended booms. Weight of my tricopter is 1965g (including battery, GoPro 3 brushless gimbal) and I'm able to hover little bit over 21 minutes! (10pcnt of battery left). Hover @ 45~55pcnt throttle. My configuration is Talon Tricopter frame, 380 mm Carbon Fibre booms, Turnigy Multistar 4108-480KV motors, 15x5.5 DJI propellers, Turnigy 20A multistar ESCs with SimonK firmware, TGY-306G servo, ZIPPY Compact 5800mAh 4S 25C, Crius AIOP board with MegapirateNG firmware. I'm definitely gonna use these motors in my futher copters.
Quality
Value
Overall
Upload
Videos
  • Hexcopter Endurance Test

Upload video
Upload
Files

Only registered users can upload files. Please log in or register to start helping your fellow hobbyists today!

Combine

essential items and
acc

商品のタグ

タグを区切るには空白を使って下さい。タグがフレーズの場合は、「'」で囲って下さい。