新規登録

Product Finder

設定

Useful links

 
[["US","AU","GB","DE"]]
新規登録
Shipped From:
  • Global

4108-600KV Turnigy Multistarエクストラロングリードで22ポールブラシレスマルチローターモーター

4108-600KV Turnigy Multistarエクストラロングリードで22ポールブラシレスマルチローターモーター

QTY:

Now save save AU$0.00 AU$0.00

AU$40.05
Stock:
重量:
169 g
SKU:
9392000032-0

Suggestion Box

Please let us know if you found any issues with this product listing.
We take our customer comments very seriously and in many cases our website modifications and product updates are a result of your comments!

Price War

If you've seen a product elsewhere for a better price, please let us know! HobbyKing pride themselves on offering the best price, so if there if you see something cheaper elsewhere, let us know!

Combine

essential items and
acc
商品概要

あなたの次のマルチローターのプロジェクトのための究極の電力システムをお探しですか?これ以上探さない!
マルチローターの性能を最大化 - Turnigy Multistarのアウトランナーズを念頭に置いて一つのことで設計されています!彼らは、ノイズの少ない、滑らかで応答性のパワーと効率向上のためのハイエンド45SHマグネット、高品質のNMBベアリングと高ポーランドカウントを備えています。彼らは、モーターがスムーズな走行のためにバランスの精度であり、これらのモータは、マルチローターの使用のために特別に設計されており、飛行機のモーターに基づいていない取り付けおよびすべてのカスタムを持っています。

4108-600 MultiStarはほとんど飛ぶにはあまりにも素敵です!このモータでは技量および詳細は、全く新しいレベルです。これは、シムとプリロードされたNMBベアリングを装備し、570ミリメートル長い高卒業生シリコン細線を持っています。それは二重の小道具は、いずれか6ミリメートルシャフトのプロペラハブのボルトまたは12ミリメートル間隔ボルトは小道具の無制限の範囲の精度上スラストワッシャとプロペラの取り付けを投げ、マウントされています。そして22P24Sポールとの円滑な効率的をカウントし、トルクの負荷を持っています。

Multistarは、その目的内蔵の製品ラインでマルチローターの世界を簡素化し、あなたのセットアップのうち当て推量を取っています。

仕様:
KV(RPM / V):600
リポ細胞:4-6s
マックス現在:400ワット
最大アンペア:26A
無負荷電流:0.9A / 10V
内部抵抗:.098ohm
極数:22P24S(24ステータを22poles)
外形寸法(Dia.xL):47のx 26ミリメートル
モーターシャフト:4ミリメートル
シャフトを支える: ボルト用 ​​の穴にハブまたは12ミリメートルの穴に6ミリメートルのボルトは、スタイルの小道具を投げました
重さ:111グラム
ボルト穴の間隔:19ミリメートルの* 25ミリメートル

Product
Specifications

追加情報

  • 単位:
    9392000032-0
  • Brand:
    MultiStar
  • 重量(g )
    169.00
  • 長さ
    85.00
  • Width:
    45.00
  • 高さ:
    60.00
  • KV ( RPM / V )
    600.00
  • 最大電流( A )
    26.00
  • 電力( W ):
    400.00
  • 長さB ( mm)の:
    26.00
  • ことができます長さD (ミリメートル)
    12.00
  • 最大電圧( V )
    0.00
  • シャフトA (ミリメートル):
    4.00
  • Unit Weight (g):
    111
  • 直径C (ミリメートル)
    47.00
  • 総丈E (ミリメートル)
    37.00
  • 抵抗( MH ):
    0.00
Community
Discussions
Rate&
Review

あなたのレビューを投稿する

Only registered users can write reviews. Please, sign in or sign up

Quality
Value
Overall
These are probably some of the best motors you can get at this price point. I didn't see the part where it said extra long leads, so I got a nice amount of silicone wire as well after I clipped most of it off. Using these with 13x5.5 props, Tarot 680 Pro and on 2x5000Mah 4S batteries in parallel.
Quality
Value
Overall
Quality
Value
Overall
I can't get close to the efficiency shown in the tables in files tab. I made my own ones as you can see on "Prop Motor specs.pdf" in files tab. Maybe to bad propellers? Motors could be better balanced, you can feel some vibration without propellers and makes a very strong sound at low speeds. I bought 6 of them performing in the same way.
Quality
Value
Overall
Quality
Value
Overall
Quiet, smooth and powerful.
We'll see in the future if the bearings are on par with the rest! : )
Quality
Value
Overall
Quality
Value
Overall
I use these motors on a tricopter. Going to get 3 more to make a Y6. They are awesome. They look incredible, and you can just feel the quality. They run quietly, with low vibrations and they spin 12x4.5 props on 4s without even warming up a little. I highly recommend them!
Quality
Value
Overall
Quality
Value
Overall
Excellent well balanced motor, although it states 4-6s I have been using this with 2x 5000mah 3s @ 11.1v batteries on a Tarot 650 with 12x5 and 13x5 props.
I get around 35-45 minutes flight time with the 12x5 carbon props.

Quality
Value
Overall
Quality
Value
Overall
Moteur idal pour le Tarot 650, utilis avec des 13x4 ou 12x4.5, son agrable et bien quilibrs.

A acheter les yeux ferms!
Quality
Value
Overall
Quality
Value
Overall
Excellent motor! Best for the Tarot Iron Man 650 Quad!! Very smooth running on 13x4 CFK props!
Quality
Value
Overall
Quality
Value
Overall
Did some testing today. All on 4S with an Afro 30Amp ESC.
Max prop is 12x3.8 APC 426.9Watt, 26.9Amp, 15.8V. A bit over 400Watt. Is no problem on a quad.
Sound is good. Motor is very quite and rather good ballanced out of the box.
Also tried an APC 11x4.7. It ran at max throttle with 336.8Watt, 21.1Amp, 15.8Volt.
So my choise is a 12X3.8 APC
Can't Judge about quality. It's brand new. See how it takes.
Bye! Hope you can use this!

Quality
Value
Overall
Upload
Videos
Upload video
Upload
Files

Only registered users can upload files. Please log in or register to start helping your fellow hobbyists today!

Combine

essential items and
acc

商品のタグ

タグを区切るには空白を使って下さい。タグがフレーズの場合は、「'」で囲って下さい。