新規登録

Product Finder

設定

Useful links

 
[["US","AU","GB","DE"]]
新規登録
Shipped From:
  • Global
  • USA

4112-320KV Turnigy Multistarエクストラロングリードで22ポールブラシレスマルチローターモーター

4112-320KV Turnigy Multistarエクストラロングリードで22ポールブラシレスマルチローターモーター

QTY:

Now save save AU$0.00 AU$0.00

AU$51.29
Stock:
重量:
213 g
SKU:
9392000033-0

Suggestion Box

Please let us know if you found any issues with this product listing.
We take our customer comments very seriously and in many cases our website modifications and product updates are a result of your comments!

Price War

If you've seen a product elsewhere for a better price, please let us know! HobbyKing pride themselves on offering the best price, so if there if you see something cheaper elsewhere, let us know!

Combine

essential items and
acc
商品概要

あなたの次のマルチローターのプロジェクトのための究極の電力システムをお探しですか?これ以上探さない!
マルチローターの性能を最大化 - Turnigy Multistarのアウトランナーズを念頭に置いて一つのことで設計されています!彼らは、ノイズの少ない、滑らかで応答性のパワーと効率向上のためのハイエンド45SHマグネット、高品質のNMBベアリングと高ポーランドカウントを備えています。彼らは、モーターがスムーズな走行のためにバランスの精度であり、これらのモータは、マルチローターの使用のために特別に設計されており、飛行機のモーターに基づいていない取り付けおよびすべてのカスタムを持っています。

4112-320KV MultiStarはほとんど飛ぶにはあまりにも素敵です!このモータでは技量および詳細は、全く新しいレベルです。これは、シムとプリロードされたNMBベアリングを装備し、570ミリメートル長い高卒業生シリコン細線を持っています。それは二重の小道具は、いずれか6ミリメートルシャフトのプロペラハブのボルトまたは12ミリメートル間隔ボルトは小道具の無制限の範囲の精度上スラストワッシャとプロペラの取り付けを投げ、マウントされています。そして22P24Sポールとの円滑な効率的をカウントし、トルクの負荷を持っています。

Multistarは、その目的内蔵の製品ラインでマルチローターの世界を簡素化し、あなたのセットアップのうち当て推量を取っています。

仕様:
KV(RPM / V):320
リポ細胞:4-8s
最大ワット:660W
最大アンペア:20A
無負荷電流:0.5A / 10V
内部抵抗:.172ohm
極数:22P24S(24ステータを22poles)
外形寸法(Dia.xL):46.6 X 29.8ミリメートル
モーターシャフト:5ミリメートル
シャフトを支える: ボルト用 ​​の穴にハブまたは12ミリメートルの穴に6ミリメートルのボルトは、スタイルの小道具を投げました
重さ:147グラム
ボルト穴の間隔:19ミリメートルの* 25ミリメートル

Product
Specifications

追加情報

  • 単位:
    9392000033-0
  • Brand:
    MultiStar
  • 重量(g )
    213.00
  • 長さ
    85.00
  • Width:
    45.00
  • 高さ:
    60.00
  • KV ( RPM / V )
    320.00
  • 最大電流( A )
    20.00
  • 電力( W ):
    660.00
  • 長さB ( mm)の:
    30.00
  • ことができます長さD (ミリメートル)
    15.00
  • 最大電圧( V )
    0.00
  • シャフトA (ミリメートル):
    5.00
  • Unit Weight (g):
    147
  • 直径C (ミリメートル)
    47.00
  • 総丈E (ミリメートル)
    40.00
  • 抵抗( MH ):
    0.00
Community
Discussions
Rate&
Review

あなたのレビューを投稿する

Only registered users can write reviews. Please, sign in or sign up

Quality
Value
Overall
You can't touch these for 40 bucks. I have more than 3 dozen flying in a bunch of different frames and NONE have ever failed. Take a 680 pro Tarot frame, 6 of these, 6 opto 45 amp esc's and a 5000 mah nano-tech battery, 14x5.5 props and it gets 19 minutes of time flying, not hovering. Even with a gimbal, it still gets close to 15. It would run much larger props but not on this frame, 14 is it. They will lift most anything and 8 of them on a 1140mm frame makes a super stable photography platform. With a WooKong controller and a decent camera, hollyweird quality pictures. Just right KV for 6S. Runs way under 90 degrees F. Easy on esc's. Work great on a split power system at 8S. So far everything we have tried has worked. I have sunnysky and T-motors as well as DJI, all good, all more expensive and none lasted any longer or performed better. You could say we like these!
Quality
Value
Overall
Quality
Value
Overall
I have purchase much more expensive outrunners in the past. Six of these with 16x5.5 props EASILY lifts my 1203mm hex (custom built) at 6.6kg. With 2 Zippy 8000mah batts I get 15 to over 20 mins. of time in the air. I will be testing 4 Turnigy-nano 5000 mah batts. (total weight less than the Zippys). Should get more time in the air. 4 hard test flights and the motors are performing very well. Just slightly warm to the touch after 15 mins.
Quality
Value
Overall
Quality
Value
Overall
Very strong motor! Great for big projects using 6s.
The main concern is about the build process. After using this motors I figure out that some vibration sounds that I was listening, is because some washer was not in the right place making the external part of the motor jump up and down causing the noise.
If you have this motor MAKE SURE to check the internal washers. In all of my 6 motors, 5 of them was missing whashers or they were not in the right place!
Quality
Value
Overall
Quality
Value
Overall
Two out of four failed within 2 hours of flight. Loose magnets on one and improper shimming on the other. HK is sending me replacements when they get back in stock. When working correctly they can lift a house.
Quality
Value
Overall
Upload
Videos
Upload video
Upload
Files

Only registered users can upload files. Please log in or register to start helping your fellow hobbyists today!

Combine

essential items and
acc

商品のタグ

タグを区切るには空白を使って下さい。タグがフレーズの場合は、「'」で囲って下さい。