Registreren

Product Finder

Instellingen

Useful links

 
[["US","AU","GB","DE"]]
Registreren
Shipped From:
  • Global

3508-700KV Turnigy Multistar 14 Pole borstelloze Multi-Rotor Motor met extra lange Leads

3508-700KV Turnigy Multistar 14 Pole borstelloze Multi-Rotor Motor met extra ...

QTY:

Now save bewaar € 0,00 € 0,00

€ 26,64
Stock:
Gewicht:
157 g
SKU:
9392000024-0

Suggestion Box

Please let us know if you found any issues with this product listing.
We take our customer comments very seriously and in many cases our website modifications and product updates are a result of your comments!

Price War

If you've seen a product elsewhere for a better price, please let us know! HobbyKing pride themselves on offering the best price, so if there if you see something cheaper elsewhere, let us know!

Combine

essential items and
acc
Product
Omschrijving

Op zoek naar de ultieme macht systeem voor uw volgende Multi-rotor project? Zoek niet verder!
De Turnigy Multistar outrunners zijn ontworpen met een ding in het achterhoofd - het maximaliseren van Multi-rotor prestatie! Ze zijn voorzien van high-end 45SH magneten, hoge kwaliteit NMB lagers en High Polen telt voor minder lawaai, glad en responsieve vermogen en verhoogde efficiëntie. Ze hebben aangepaste motor montage en al zijn precisie in evenwicht gehouden voor de goede werking, zijn deze motoren specifiek ontworpen voor multi-rotor gebruik en zijn niet gebaseerd op het vliegtuig motoren.

De 3508-700KV MultiStar is bijna te mooi om te vliegen! Het vakmanschap en detail in deze motor is op een geheel nieuw niveau. Het is voorzien van vulstukken en pre-loaded NMB lagers en heeft een 570mm lange hoge grad silicium draden. Hij heeft dual prop montage, ofwel een bout op 6mm as prop hub of de 12mm afstand bout gooide prop bevestiging met een precisie bovenste drukring voor een onbeperkt aanbod van rekwisieten. En met 14P12S pole tellen haar vlotte efficiënte en heeft tal van het koppel.

Multistar is het vereenvoudigen van de wereld van de Multi-Rotoren met hun speciaal gebouwde productlijn en het nemen van de giswerk uit uw setup.

specs:
KV (RPM / V): 700
Cellen Lipo: 3-4s
Max stroom: 360W
Max Amps: 28A
Onbelast Current: 0.5A / 10v
Internal Resistance: .083ohm
Aantal polen: 14P12S (14poles 12 stators)
Afmetingen (Dia.xL): 43 x 26mm
Motor Shaft: 4 mm
prop schacht: 6mm bout op hub of 12mm gat naar gat voor bout gooide stijl props
Gewicht: 102g
bolt hole spacing: 19mm * 25mm

Product
Specifications

Aanvullende Informatie

  • Sku:
    9392000024-0
  • Brand:
    MultiStar
  • Gewicht ( g)
    157.00
  • Lengte
    85.00
  • Breedte:
    45.00
  • Hoogte:
    60.00
  • Kv ( tpm / v )
    700.00
  • Max Currents (A )
    28.00
  • Vermogen ( W):
    360.00
  • Lengte B ( mm ):
    26.00
  • Kan Lengte D ( mm )
    10.00
  • Max Voltage ( V )
    0.00
  • Shaft A ( mm ):
    4.00
  • Unit Weight (g):
    102
  • C Diameter ( mm )
    42.00
  • Totale lengte E ( mm )
    36.00
  • Resistance ( mh ):
    0.00
Community
Discussions
Rate&
Review

Schrijf je eigen recensie

Only registered users can write reviews. Please, sign in or sign up

Quality
Value
Overall
This motor is pretty good and proper KV for 600-700 class Multicopter.
I installed this in my Tarrot 650 X-copter. with 12x4.5 and 11x4.5 APC prop.
Both setting of them works well. But 12-inch prop is better, It's more power.
I uses Hobbywing X-Rotor ESC - 40amp. Because it has connector on it's board, it's well fit with this motor's long load(it's good point also).
But, I think the quality of the bearing is quite poor. Some fall-off make the bearing get bad. But I recommend this motor for the 600-700 class multicopter strongly.
It's quite good.
Quality
Value
Overall
Quality
Value
Overall
very nice motors. Running on a 2300grams tarot 690 hexa. 3s and 13x5.5 propps. current is 20-27amps hovering in very windy weather.
got 12 mins on 6000mah 3s

I have been using Afro esc. Got sync issue on one esc and had to reflash to the latest 2013-10-.. firmware. Now i got 30 minutes in the fram from schratch build and all working very well!
Quality
Value
Overall
Quality
Value
Overall
No mounting screws, that's a bit strange. Every other motor I have purchased from Hobbyking includes them so didn't thinks twice. With hindsight I should have picked it up from the photos. Hindsight is a wonderful thing.
Quality
Value
Overall
Upload
Videos
  • MultiStar Motors

Upload video
Upload
Files

Only registered users can upload files. Please log in or register to start helping your fellow hobbyists today!

Customer files
3508-700kv thrust data download now [169kb]

Combine

essential items and
acc

Productlabels

Gebruik spaties om verschillende labels te scheiden. Gebruik enkele aanhalingstekens (') voor zinnen.