Registreren

Product Finder

Instellingen

Useful links

Live Chat
 
[["US","AU","GB","DE"]]
Registreren
Shipped From:
  • Global

4108-380KV Turnigy Multistar 22 Pole borstelloze Multi-Rotor Motor met extra lange Leads

4108-380KV Turnigy Multistar 22 Pole borstelloze Multi-Rotor Motor met extra ...

QTY:

Now save bewaar € 0,00 € 0,00

€ 28,86
Stock:
Gewicht:
170 g
SKU:
9392000030-0

Suggestion Box

Please let us know if you found any issues with this product listing.
We take our customer comments very seriously and in many cases our website modifications and product updates are a result of your comments!

Price War

If you've seen a product elsewhere for a better price, please let us know! HobbyKing pride themselves on offering the best price, so if there if you see something cheaper elsewhere, let us know!

Combine

essential items and
acc
Product
Omschrijving

Op zoek naar de ultieme macht systeem voor uw volgende Multi-rotor project? Zoek niet verder!
De Turnigy Multistar outrunners zijn ontworpen met een ding in het achterhoofd - het maximaliseren van Multi-rotor prestatie! Ze zijn voorzien van high-end 45SH magneten, hoge kwaliteit NMB lagers en High Polen telt voor minder lawaai, glad en responsieve vermogen en verhoogde efficiëntie. Ze hebben aangepaste motor montage en al zijn precisie in evenwicht gehouden voor de goede werking, zijn deze motoren specifiek ontworpen voor multi-rotor gebruik en zijn niet gebaseerd op het vliegtuig motoren.

De 4108-380kv MultiStar is bijna te mooi om te vliegen! Het vakmanschap en detail in deze motor is op een geheel nieuw niveau. Het is voorzien van vulstukken en pre-loaded NMB lagers en heeft een 570mm lange hoge grad silicium draden. Hij heeft dual prop montage, ofwel een bout op 6mm as prop hub of de 12mm afstand bout gooide prop bevestiging met een precisie bovenste drukring voor een onbeperkt aanbod van rekwisieten. En met 22P24S pole tellen haar vlotte efficiënte en heeft tal van het koppel.

Multistar is het vereenvoudigen van de wereld van de Multi-Rotoren met hun speciaal gebouwde productlijn en het nemen van de giswerk uit uw setup.

specs:
KV (RPM / V): 380
Cellen Lipo: 4-6s
Max stroom: 360W
Max Amps: 17A
Onbelast Current: 0.5A / 10v
Internal Resistance: .225ohm
Aantal polen: 22P24S (22poles 24 stators)
Afmetingen (Dia.xL): 47 x 26mm
Motor As: 4mm
prop schacht: 6mm bout op hub of 12mm gat naar gat voor bout gooide stijl props
Gewicht: 111 g
bolt hole spacing: 19mm * 25mm

Product
Specifications

Aanvullende Informatie

  • Sku:
    9392000030-0
  • Brand:
    MultiStar
  • Gewicht ( g)
    170.00
  • Lengte
    85.00
  • Breedte:
    45.00
  • Hoogte:
    60.00
  • Kv ( tpm / v )
    380.00
  • Max Currents (A )
    17.00
  • Vermogen ( W):
    360.00
  • Lengte B ( mm ):
    26.00
  • Kan Lengte D ( mm )
    12.00
  • Max Voltage ( V )
    0.00
  • Shaft A ( mm ):
    4.00
  • Unit Weight (g):
    111
  • C Diameter ( mm )
    47.00
  • Totale lengte E ( mm )
    36.00
  • Resistance ( mh ):
    0.00
Community
Discussions
Rate&
Review

Schrijf je eigen recensie

Only registered users can write reviews. Please, sign in or sign up

verified_user Quality
trending_up Value
playlist_add_check Overall
These motors when they work properly are great. However there is some serious QC issues with them. 2 out of the 4 motors I ordered have loose bearings which produce a loud rattling noise when I throttle up.

Quite disappointed considering others have a better experience with them.
verified_user Quality
trending_up Value
playlist_add_check Overall
verified_user Quality
trending_up Value
playlist_add_check Overall
Great motors! I am using 8 of them on a modified Tarot 650 Iron Man in an X8 configuration, spinning 15 x 5.5 CF T-style props (with the included adapters!) on a 4S setup with 2 25 amp Q-Brains in a stack on a third center plate mounted on the bottom. NAZA V2 and a OrangeRX 7ch RX.

With a pair of top-mounted Multistar 10c 8000mah 4S batteries, I am getting 27 minutes of flight time. Highly recommended!

Search for "Tarot 650 Triple Decker X8" to see the whole build at RCgroups.
verified_user Quality
trending_up Value
playlist_add_check Overall
verified_user Quality
trending_up Value
playlist_add_check Overall
Wow have 4 of these, my quad flies awesome,
Very quiet, smooth and vibration free, will definitely buy more!
verified_user Quality
trending_up Value
playlist_add_check Overall
Upload
Videos
Upload video
Upload
Files

Only registered users can upload files. Please log in or register to start helping your fellow hobbyists today!

Customer files
4108-380kv thrust data download now [272kb]

Combine

essential items and
acc

Productlabels

Gebruik spaties om verschillende labels te scheiden. Gebruik enkele aanhalingstekens (') voor zinnen.