Registreren

Product Finder

Instellingen

Useful links

Live Chat
 
[["US","AU","GB","DE"]]
Registreren
Shipped From:
  • Global

4108-600KV Turnigy Multistar 22 Pole borstelloze Multi-Rotor Motor met extra lange Leads

4108-600KV Turnigy Multistar 22 Pole borstelloze Multi-Rotor Motor met extra ...

QTY:

Now save bewaar € 0,00 € 0,00

€ 27,53
Stock:
Gewicht:
169 g
SKU:
9392000032-0

Suggestion Box

Please let us know if you found any issues with this product listing.
We take our customer comments very seriously and in many cases our website modifications and product updates are a result of your comments!

Price War

If you've seen a product elsewhere for a better price, please let us know! HobbyKing pride themselves on offering the best price, so if there if you see something cheaper elsewhere, let us know!

Combine

essential items and
acc
Product
Omschrijving

Op zoek naar de ultieme macht systeem voor uw volgende Multi-rotor project? Zoek niet verder!
De Turnigy Multistar outrunners zijn ontworpen met een ding in het achterhoofd - het maximaliseren van Multi-rotor prestatie! Ze zijn voorzien van high-end 45SH magneten, hoge kwaliteit NMB lagers en High Polen telt voor minder lawaai, glad en responsieve vermogen en verhoogde efficiëntie. Ze hebben aangepaste motor montage en al zijn precisie in evenwicht gehouden voor de goede werking, zijn deze motoren specifiek ontworpen voor multi-rotor gebruik en zijn niet gebaseerd op het vliegtuig motoren.

De 4108-600 MultiStar is bijna te mooi om te vliegen! Het vakmanschap en detail in deze motor is op een geheel nieuw niveau. Het is voorzien van vulstukken en pre-loaded NMB lagers en heeft een 570mm lange hoge grad silicium draden. Hij heeft dual prop montage, ofwel een bout op 6mm as prop hub of de 12mm afstand bout gooide prop bevestiging met een precisie bovenste drukring voor een onbeperkt aanbod van rekwisieten. En met 22P24S pole tellen haar vlotte efficiënte en heeft tal van het koppel.

Multistar is het vereenvoudigen van de wereld van de Multi-Rotoren met hun speciaal gebouwde productlijn en het nemen van de giswerk uit uw setup.

specs:
KV (RPM / V): 600
Cellen Lipo: 4-6s
Max stroom: 400w
Max Amps: 26A
Onbelast Current: 0.9A / 10v
Internal Resistance: .098ohm
Aantal polen: 22P24S (22poles 24 stators)
Afmetingen (Dia.xL): 47 x 26mm
Motor As: 4mm
prop schacht: 6mm bout op hub of 12mm gat naar gat voor bout gooide stijl props
Gewicht: 111 g
bolt hole spacing: 19mm * 25mm

Product
Specifications

Aanvullende Informatie

  • Sku:
    9392000032-0
  • Brand:
    MultiStar
  • Gewicht ( g)
    169.00
  • Lengte
    85.00
  • Breedte:
    45.00
  • Hoogte:
    60.00
  • Kv ( tpm / v )
    600.00
  • Max Currents (A )
    26.00
  • Vermogen ( W):
    400.00
  • Lengte B ( mm ):
    26.00
  • Kan Lengte D ( mm )
    12.00
  • Max Voltage ( V )
    0.00
  • Shaft A ( mm ):
    4.00
  • Unit Weight (g):
    111
  • C Diameter ( mm )
    47.00
  • Totale lengte E ( mm )
    37.00
  • Resistance ( mh ):
    0.00
Community
Discussions
Rate&
Review

Schrijf je eigen recensie

Only registered users can write reviews. Please, sign in or sign up

verified_user Quality
trending_up Value
playlist_add_check Overall
These are probably some of the best motors you can get at this price point. I didn't see the part where it said extra long leads, so I got a nice amount of silicone wire as well after I clipped most of it off. Using these with 13x5.5 props, Tarot 680 Pro and on 2x5000Mah 4S batteries in parallel.
verified_user Quality
trending_up Value
playlist_add_check Overall
verified_user Quality
trending_up Value
playlist_add_check Overall
I can't get close to the efficiency shown in the tables in files tab. I made my own ones as you can see on "Prop Motor specs.pdf" in files tab. Maybe to bad propellers? Motors could be better balanced, you can feel some vibration without propellers and makes a very strong sound at low speeds. I bought 6 of them performing in the same way.
verified_user Quality
trending_up Value
playlist_add_check Overall
verified_user Quality
trending_up Value
playlist_add_check Overall
Quiet, smooth and powerful.
We'll see in the future if the bearings are on par with the rest! : )
verified_user Quality
trending_up Value
playlist_add_check Overall
verified_user Quality
trending_up Value
playlist_add_check Overall
I use these motors on a tricopter. Going to get 3 more to make a Y6. They are awesome. They look incredible, and you can just feel the quality. They run quietly, with low vibrations and they spin 12x4.5 props on 4s without even warming up a little. I highly recommend them!
verified_user Quality
trending_up Value
playlist_add_check Overall
verified_user Quality
trending_up Value
playlist_add_check Overall
Excellent well balanced motor, although it states 4-6s I have been using this with 2x 5000mah 3s @ 11.1v batteries on a Tarot 650 with 12x5 and 13x5 props.
I get around 35-45 minutes flight time with the 12x5 carbon props.

verified_user Quality
trending_up Value
playlist_add_check Overall
verified_user Quality
trending_up Value
playlist_add_check Overall
Moteur idal pour le Tarot 650, utilis avec des 13x4 ou 12x4.5, son agrable et bien quilibrs.

A acheter les yeux ferms!
verified_user Quality
trending_up Value
playlist_add_check Overall
verified_user Quality
trending_up Value
playlist_add_check Overall
Excellent motor! Best for the Tarot Iron Man 650 Quad!! Very smooth running on 13x4 CFK props!
verified_user Quality
trending_up Value
playlist_add_check Overall
verified_user Quality
trending_up Value
playlist_add_check Overall
Did some testing today. All on 4S with an Afro 30Amp ESC.
Max prop is 12x3.8 APC 426.9Watt, 26.9Amp, 15.8V. A bit over 400Watt. Is no problem on a quad.
Sound is good. Motor is very quite and rather good ballanced out of the box.
Also tried an APC 11x4.7. It ran at max throttle with 336.8Watt, 21.1Amp, 15.8Volt.
So my choise is a 12X3.8 APC
Can't Judge about quality. It's brand new. See how it takes.
Bye! Hope you can use this!

verified_user Quality
trending_up Value
playlist_add_check Overall
Upload
Videos
Upload video
Upload
Files

Only registered users can upload files. Please log in or register to start helping your fellow hobbyists today!

Combine

essential items and
acc

Productlabels

Gebruik spaties om verschillende labels te scheiden. Gebruik enkele aanhalingstekens (') voor zinnen.