Registar

Product Finder

Definições

Useful links

Bate-papo ao vivo
 
[["US","AU","GB","DE"]]
Registar
Shipped From:
  • International (Hong Kong)

3508-700KV Turnigy Multistar 14 Pole sem escova Multi-rotor do motor com as ligações extra-longas

3508-700KV Turnigy Multistar 14 Pole sem escova Multi-rotor do motor com as l...

QTY:

Now save guardar 0,00 € 0,00 €

27,45 €
Stock:
Peso:
157 g
SKU:
9392000024-0

Suggestion Box

Please let us know if you found any issues with this product listing.
We take our customer comments very seriously and in many cases our website modifications and product updates are a result of your comments!

Price War

If you've seen a product elsewhere for a better price, please let us know! HobbyKing pride themselves on offering the best price, so if there if you see something cheaper elsewhere, let us know!

Combine

essential items and
acc
Descrição
do

Olhando para o sistema de energia final para o seu próximo projeto Multi-rotor? Não procure mais!
Os OutRunners Turnigy Multistar são projetados com uma coisa em mente - maximizando o desempenho Multi-rotor! Eles apresentam high-end 45SH ímãs, rolamentos NMB alta qualidade e altos números de pólos para menos ruído, potência suave e responsiva e aumento da eficiência. Eles têm de montagem do motor de costume e todos são precisão equilibrada para um funcionamento suave, estes motores são projetados especificamente para uso multi-rotor e não são baseados em motores de avião.

O 3508-700KV MultiStar é quase demasiado bom para voar! O acabamento e detalhes em este motor está em um nível totalmente novo. É equipado com rolamentos NMB shimmed e pré-carregado e tem 570mm fios de silício formando do segundo longos. Ele tem dupla hélice de montagem, ou um parafuso no hub eixo prop 6mm ou o parafuso 12 milímetros espaçamento jogou anexo prop com uma precisão arruela de encosto superior para uma gama ilimitada de adereços. E com 14P12S pólo contar sua suave eficiente e tem cargas de torque.

Multistar está simplificando o mundo da Multi-Rotores com a sua finalidade construída linha de produtos e tomar o trabalho da suposição fora de sua configuração.

especificações:
KV (RPM / V): 700
Células Lipo: 3-4s
Max atual: 360W
Max Amps: 28A
Sem carga Corrente: 0.5A / 10v
Resistência interna: .083ohm
Número de polos: 14P12S (14poles 12 estatores)
Dimensões (Dia.xL): 43 x 26 milímetros
Motor Shaft: 4 mm
prop eixo: parafuso de 6mm em hub ou 12 milímetros buraco em buraco de parafuso atirou adereços estilo
Peso: 102g
espaçamento furo passante: * 25 milímetros 19 milímetros

Product
Specifications

Características do Produto

  • SKU:
    9392000024-0
  • Brand:
    MultiStar
  • Peso ( g )
    157.00
  • Comprimento
    85.00
  • Largura:
    45.00
  • Altura:
    60.00
  • Kv ( rpm / v )
    700.00
  • Correntes Max (A)
    28.00
  • Potência (W):
    360.00
  • Comprimento B (mm):
    26.00
  • Pode Comprimento D (mm)
    10.00
  • Max Tensão ( V)
    0.00
  • Shaft A ( mm):
    4.00
  • Unit Weight (g):
    102
  • Diâmetro C ( mm )
    42.00
  • Comprimento Total E ( mm)
    36.00
  • Resistência (MH ):
    0.00
Community
Discussions
Rate&
Review

Escreva a sua análise

Only registered users can write reviews. Please, sign in or sign up

verified_user Quality
trending_up Value
playlist_add_check Overall
This motor is pretty good and proper KV for 600-700 class Multicopter.
I installed this in my Tarrot 650 X-copter. with 12x4.5 and 11x4.5 APC prop.
Both setting of them works well. But 12-inch prop is better, It's more power.
I uses Hobbywing X-Rotor ESC - 40amp. Because it has connector on it's board, it's well fit with this motor's long load(it's good point also).
But, I think the quality of the bearing is quite poor. Some fall-off make the bearing get bad. But I recommend this motor for the 600-700 class multicopter strongly.
It's quite good.
verified_user Quality
trending_up Value
playlist_add_check Overall
verified_user Quality
trending_up Value
playlist_add_check Overall
very nice motors. Running on a 2300grams tarot 690 hexa. 3s and 13x5.5 propps. current is 20-27amps hovering in very windy weather.
got 12 mins on 6000mah 3s

I have been using Afro esc. Got sync issue on one esc and had to reflash to the latest 2013-10-.. firmware. Now i got 30 minutes in the fram from schratch build and all working very well!
verified_user Quality
trending_up Value
playlist_add_check Overall
verified_user Quality
trending_up Value
playlist_add_check Overall
No mounting screws, that's a bit strange. Every other motor I have purchased from Hobbyking includes them so didn't thinks twice. With hindsight I should have picked it up from the photos. Hindsight is a wonderful thing.
verified_user Quality
trending_up Value
playlist_add_check Overall
Upload
Videos
  • MultiStar Motors

Upload video
Upload
Files

Somente usuários registrados podem fazer o upload de arquivos. Por favor Registre-se para que você possa começar a ajudar seus colegas de hobby hoje ainda!

Customer files
3508-700kv thrust data download now [169kb]

Combine

essential items and
acc

Etiquetas de Produtos

Outros marcaram este produto com as seguintes etiquetas:

Utilize um espaço para separar as etiquetas. Utilize aspas simples (') para frases.