Registar

Product Finder

Definições

Useful links

 
[["US","AU","GB","DE"]]
Registar
Shipped From:
  • International (Hong Kong)
  • USA

4108-480KV Turnigy Multistar 22 Pole sem escova Multi-rotor do motor com as ligações extra-longas

4108-480KV Turnigy Multistar 22 Pole sem escova Multi-rotor do motor com as l...

QTY:

Now save guardar 0,00 € 0,00 €

27,44 €
Stock:
Peso:
169 g
SKU:
9392000031-0

Suggestion Box

Please let us know if you found any issues with this product listing.
We take our customer comments very seriously and in many cases our website modifications and product updates are a result of your comments!

Price War

If you've seen a product elsewhere for a better price, please let us know! HobbyKing pride themselves on offering the best price, so if there if you see something cheaper elsewhere, let us know!

Combine

essential items and
acc
Descrição
do

Olhando para o sistema de energia final para o seu próximo projeto Multi-rotor? Não procure mais!
Os OutRunners Turnigy Multistar são projetados com uma coisa em mente - maximizando o desempenho Multi-rotor! Eles apresentam high-end 45SH ímãs, rolamentos NMB alta qualidade e altos números de pólos para menos ruído, potência suave e responsiva e aumento da eficiência. Eles têm de montagem do motor de costume e todos são precisão equilibrada para um funcionamento suave, estes motores são projetados especificamente para uso multi-rotor e não são baseados em motores de avião.

O MultiStar 4108-480kv é quase demasiado bom para voar! O acabamento e detalhes em este motor está em um nível totalmente novo. É equipado com rolamentos NMB shimmed e pré-carregado e tem 570mm fios de silício formando do segundo longos. Ele tem dupla hélice de montagem, ou um parafuso no hub eixo prop 6mm ou o parafuso 12 milímetros espaçamento jogou anexo prop com uma precisão arruela de encosto superior para uma gama ilimitada de adereços. E com 22P24S pólo contar sua suave eficiente e tem cargas de torque.

Multistar está simplificando o mundo da Multi-Rotores com a sua finalidade construída linha de produtos e tomar o trabalho da suposição fora de sua configuração.

especificações:
KV (RPM / V): 480
Células Lipo: 4-6s
Max atual: 380W
Max Amps: 22A
Sem carga Corrente: 0.6A / 10v
Resistência interna: .0128ohm
Número de polos: 22P24S (22poles 24 estatores)
Dimensões (Dia.xL): 47 x 26 milímetros
Motor Shaft: 4 milímetros
prop eixo: parafuso de 6mm em hub ou 12 milímetros buraco em buraco de parafuso atirou adereços estilo
Peso: 111g
espaçamento furo passante: * 25 milímetros 19 milímetros

Product
Specifications

Características do Produto

  • SKU:
    9392000031-0
  • Brand:
    MultiStar
  • Peso ( g )
    169.00
  • Comprimento
    85.00
  • Largura:
    45.00
  • Altura:
    60.00
  • Kv ( rpm / v )
    480.00
  • Correntes Max (A)
    22.00
  • Potência (W):
    380.00
  • Comprimento B (mm):
    26.00
  • Pode Comprimento D (mm)
    12.00
  • Max Tensão ( V)
    0.00
  • Shaft A ( mm):
    4.00
  • Unit Weight (g):
    111
  • Diâmetro C ( mm )
    27.00
  • Comprimento Total E ( mm)
    36.00
  • Resistência (MH ):
    0.00
Community
Discussions
Rate&
Review

Escreva a sua análise

Only registered users can write reviews. Please, sign in or sign up

Quality
Value
Overall
no way to get it work. i have desync issue with 5/5 of theese motors. I tried with different escs, simonk an blheli and every time in certain rpm range the motor produces a loud sound and randomly stops. Very dangerous.
Quality
Value
Overall
Quality
Value
Overall
muy buenos moteres gran fuerza al despege, les doy caa dia si dia no y todavia sin fallos toquemos madera los recomiendo
Quality
Value
Overall
Quality
Value
Overall
Nice build quality. Very smooth rotation. No flaws upon receipt. All hardware is of good quality.
Quality
Value
Overall
Quality
Value
Overall
Purchased three of these motors for a Tricopter due to lack of time I started to work on this set up four months later and realized one of these motors arrived with broken ball bearing. The other two motors look and work perfect.
Motor with defective bearing is getting stuck when rotated by hand so now I will have to look for the replacement parts for the never used motor.
HK please pay attention to these small details during your QC.
Thanks.
Quality
Value
Overall
Quality
Value
Overall
Excellent motors for the price. Very smooth and efficient . Installed with 14" 4.5 t-props , 30A esc , Tarot FY650 , Tarot gimbal with GP3 , Naz M ,5000mAh 4s 25c, total weight 2.3kg . 15 minutes flight time ,low voltage warning set at 14.2v. Much better than the old multistar 4822 . Absolutely recommend these for your next quad build.
Quality
Value
Overall
Quality
Value
Overall
This motor seems to be perfect for my Talon Tricopter with extended booms. Weight of my tricopter is 1965g (including battery, GoPro 3 brushless gimbal) and I'm able to hover little bit over 21 minutes! (10pcnt of battery left). Hover @ 45~55pcnt throttle. My configuration is Talon Tricopter frame, 380 mm Carbon Fibre booms, Turnigy Multistar 4108-480KV motors, 15x5.5 DJI propellers, Turnigy 20A multistar ESCs with SimonK firmware, TGY-306G servo, ZIPPY Compact 5800mAh 4S 25C, Crius AIOP board with MegapirateNG firmware. I'm definitely gonna use these motors in my futher copters.
Quality
Value
Overall
Upload
Videos
  • Hexcopter Endurance Test

Upload video
Upload
Files

Somente usuários registrados podem fazer o upload de arquivos. Por favor Registre-se para que você possa começar a ajudar seus colegas de hobby hoje ainda!

Combine

essential items and
acc

Etiquetas de Produtos

Utilize um espaço para separar as etiquetas. Utilize aspas simples (') para frases.