Become a Dealer Blog
Registar

Preço total

0,00 US$

Carrinho de compras 0 Carrinho de compras 0 Loading...

4108-600KV Turnigy Multistar 22 Pole sem escova Multi-rotor do motor com as ligações extra-longas

Generating Links

4108-600KV Turnigy Multistar 22 Pole sem escova Multi-rotor do motor com as ligações extra-longas

 
Preço:

Now save economize 0,00 US$ 0,00 US$

33,79 US$
Já comprado Discontinued Product

Please continue searching for a similar product.
1 year warranty
SKU:
9392000032-0
Envio Grátis? Clique aqui aprender mais!

Olhando para o sistema de energia final para o seu próximo projeto Multi-rotor? Não procure mais!
Os OutRunners Turnigy Multistar são projetados com uma coisa em mente - maximizando o desempenho Multi-rotor! Eles apresentam high-end 45SH ímãs, rolamentos NMB alta qualidade e altos números de pólos para menos ruído, potência suave e responsiva e aumento da eficiência. Eles têm de montagem do motor de costume e todos são precisão equilibrada para um funcionamento suave, estes motores são projetados especificamente para uso multi-rotor e não são baseados em motores de avião.

A 4108-600 MultiStar é quase demasiado bom para voar! O acabamento e detalhes em este motor está em um nível totalmente novo. É equipado com rolamentos NMB shimmed e pré-carregado e tem 570mm fios de silício formando do segundo longos. Ele tem dupla hélice de montagem, ou um parafuso no hub eixo prop 6mm ou o parafuso 12 milímetros espaçamento jogou anexo prop com uma precisão arruela de encosto superior para uma gama ilimitada de adereços. E com 22P24S pólo contar sua suave eficiente e tem cargas de torque.

Multistar está simplificando o mundo da Multi-Rotores com a sua finalidade construída linha de produtos e tomar o trabalho da suposição fora de sua configuração.

especificações:
KV (RPM / V): 600
Células Lipo: 4-6s
Max atual: 400w
Max Amps: 26A
Sem carga atual: 0.9A / 10v
Resistência interna: .098ohm
Número de polos: 22P24S (22poles 24 estatores)
Dimensões (Dia.xL): 47 x 26 milímetros
Motor Shaft: 4 milímetros
prop eixo: parafuso de 6mm em hub ou 12 milímetros buraco em buraco de parafuso atirou adereços estilo
Peso: 111g
espaçamento furo passante: * 25 milímetros 19 milímetros

  • Kv ( rpm / v ) 600.00
  • Correntes Max (A) 26.00
  • Resistência (MH ) 172.00
  • Max Tensão ( V) 25.00
  • Potência (W) 400.00
  • Shaft A ( mm) 4.00
  • Comprimento B (mm) 26.00
  • Diâmetro C ( mm ) 47.00
  • Pode Comprimento D (mm) 12.00
  • Comprimento Total E ( mm) 37.00
attributeset-10
Close

Dimension Diagram Guide

  • attributeset-10

Close

Envio vídeo

Registre-se para enviar vídeos, por favor assinar em ou registar

Tópicos
Ordenar por
Tópicos Mais Recentes
* Nome de utilizador:

* Sua resposta:


Por favor, insira o texto mostrado na imagem no campo abaixo
*Código de verificação:
Cancelar
Submeter
Poste um Novo Tópico
* Nome de utilizador:

* Seu Tópico:



Por favor, insira o texto mostrado na imagem no campo abaixo
*Código de verificação:
Postar Tópico

Registre-se para escrever comentários, por favor assinar em ou registar

Beachy Head | Comprador Verificado

  • Overall
  • Quality
  • Value

Very good

May 06, 2019

Nicely made and just right for my model

| Comprador Verificado

  • Overall
  • Quality
  • Value

Certified Buyer Rated

Dec 25, 2015

These are probably some of the best motors you can get at this price point. I didn't see the part where it said extra long leads, so I got a nice amount of silicone wire as well after I clipped most of it off. Using these with 13x5.5 props, Tarot 680 Pro and on 2x5000Mah 4S batteries in parallel.

David | Comprador Verificado

  • Overall
  • Quality
  • Value

Customer Rated

May 29, 2015

I can't get close to the efficiency shown in the tables in files tab. I made my own ones as you can see on "Prop Motor specs.pdf" in files tab. Maybe to bad propellers? Motors could be better balanced, you can feel some vibration without propellers and makes a very strong sound at low speeds. I bought 6 of them performing in the same way.

Martin | Comprador Verificado

  • Overall
  • Quality
  • Value

Customer Rated

May 06, 2015

Quiet, smooth and powerful.
We'll see in the future if the bearings are on par with the rest! : )

Luke | Comprador Verificado

  • Overall
  • Quality
  • Value

Customer Rated

Feb 23, 2015

I use these motors on a tricopter. Going to get 3 more to make a Y6. They are awesome. They look incredible, and you can just feel the quality. They run quietly, with low vibrations and they spin 12x4.5 props on 4s without even warming up a little. I highly recommend them!

Phil | Comprador Verificado

  • Overall
  • Quality
  • Value

Customer Rated

Oct 08, 2014

Excellent well balanced motor, although it states 4-6s I have been using this with 2x 5000mah 3s @ 11.1v batteries on a Tarot 650 with 12x5 and 13x5 props.
I get around 35-45 minutes flight time with the 12x5 carbon props.

Philippe | Comprador Verificado

  • Overall
  • Quality
  • Value

Customer Rated

Aug 23, 2014

Moteur idal pour le Tarot 650, utilis avec des 13x4 ou 12x4.5, son agrable et bien quilibrs.

A acheter les yeux ferms!

Dirkson | Comprador Verificado

  • Overall
  • Quality
  • Value

Certified Buyer Rated

Jan 25, 2014

Excellent motor! Best for the Tarot Iron Man 650 Quad!! Very smooth running on 13x4 CFK props!

GerritK | Comprador Verificado

  • Overall
  • Quality
  • Value

Customer Rated

Dec 26, 2013

Did some testing today. All on 4S with an Afro 30Amp ESC.
Max prop is 12x3.8 APC 426.9Watt, 26.9Amp, 15.8V. A bit over 400Watt. Is no problem on a quad.
Sound is good. Motor is very quite and rather good ballanced out of the box.
Also tried an APC 11x4.7. It ran at max throttle with 336.8Watt, 21.1Amp, 15.8Volt.
So my choise is a 12X3.8 APC
Can't Judge about quality. It's brand new. See how it takes.
Bye! Hope you can use this!

Arquivos de clientes
No File Name Download [205]
thrust and prop size data Download [193]
prop and thrust data Download [193]
Subir arquivo

Registre-se para fazer upload de arquivos.
Por favor assinar em ou registar para começar a ajudar amadores agora!

Related Tags