Registar

Product Finder

Definições

Useful links

 
[["US","AU","GB","DE"]]
Registar
Shipped From:
  • International (Hong Kong)

4108-600KV Turnigy Multistar 22 Pole sem escova Multi-rotor do motor com as ligações extra-longas

4108-600KV Turnigy Multistar 22 Pole sem escova Multi-rotor do motor com as l...

QTY:

Now save guardar 0,00 € 0,00 €

26,76 €
Stock:
Peso:
169 g
SKU:
9392000032-0

Suggestion Box

Please let us know if you found any issues with this product listing.
We take our customer comments very seriously and in many cases our website modifications and product updates are a result of your comments!

Price War

If you've seen a product elsewhere for a better price, please let us know! HobbyKing pride themselves on offering the best price, so if there if you see something cheaper elsewhere, let us know!

Combine

essential items and
acc
Descrição
do

Olhando para o sistema de energia final para o seu próximo projeto Multi-rotor? Não procure mais!
Os OutRunners Turnigy Multistar são projetados com uma coisa em mente - maximizando o desempenho Multi-rotor! Eles apresentam high-end 45SH ímãs, rolamentos NMB alta qualidade e altos números de pólos para menos ruído, potência suave e responsiva e aumento da eficiência. Eles têm de montagem do motor de costume e todos são precisão equilibrada para um funcionamento suave, estes motores são projetados especificamente para uso multi-rotor e não são baseados em motores de avião.

A 4108-600 MultiStar é quase demasiado bom para voar! O acabamento e detalhes em este motor está em um nível totalmente novo. É equipado com rolamentos NMB shimmed e pré-carregado e tem 570mm fios de silício formando do segundo longos. Ele tem dupla hélice de montagem, ou um parafuso no hub eixo prop 6mm ou o parafuso 12 milímetros espaçamento jogou anexo prop com uma precisão arruela de encosto superior para uma gama ilimitada de adereços. E com 22P24S pólo contar sua suave eficiente e tem cargas de torque.

Multistar está simplificando o mundo da Multi-Rotores com a sua finalidade construída linha de produtos e tomar o trabalho da suposição fora de sua configuração.

especificações:
KV (RPM / V): 600
Células Lipo: 4-6s
Max atual: 400w
Max Amps: 26A
Sem carga atual: 0.9A / 10v
Resistência interna: .098ohm
Número de polos: 22P24S (22poles 24 estatores)
Dimensões (Dia.xL): 47 x 26 milímetros
Motor Shaft: 4 milímetros
prop eixo: parafuso de 6mm em hub ou 12 milímetros buraco em buraco de parafuso atirou adereços estilo
Peso: 111g
espaçamento furo passante: * 25 milímetros 19 milímetros

Product
Specifications

Características do Produto

  • SKU:
    9392000032-0
  • Brand:
    MultiStar
  • Peso ( g )
    169.00
  • Comprimento
    85.00
  • Largura:
    45.00
  • Altura:
    60.00
  • Kv ( rpm / v )
    600.00
  • Correntes Max (A)
    26.00
  • Potência (W):
    400.00
  • Comprimento B (mm):
    26.00
  • Pode Comprimento D (mm)
    12.00
  • Max Tensão ( V)
    0.00
  • Shaft A ( mm):
    4.00
  • Unit Weight (g):
    111
  • Diâmetro C ( mm )
    47.00
  • Comprimento Total E ( mm)
    37.00
  • Resistência (MH ):
    0.00
Community
Discussions
Rate&
Review

Escreva a sua análise

Only registered users can write reviews. Please, sign in or sign up

Quality
Value
Overall
These are probably some of the best motors you can get at this price point. I didn't see the part where it said extra long leads, so I got a nice amount of silicone wire as well after I clipped most of it off. Using these with 13x5.5 props, Tarot 680 Pro and on 2x5000Mah 4S batteries in parallel.
Quality
Value
Overall
Quality
Value
Overall
I can't get close to the efficiency shown in the tables in files tab. I made my own ones as you can see on "Prop Motor specs.pdf" in files tab. Maybe to bad propellers? Motors could be better balanced, you can feel some vibration without propellers and makes a very strong sound at low speeds. I bought 6 of them performing in the same way.
Quality
Value
Overall
Quality
Value
Overall
Quiet, smooth and powerful.
We'll see in the future if the bearings are on par with the rest! : )
Quality
Value
Overall
Quality
Value
Overall
I use these motors on a tricopter. Going to get 3 more to make a Y6. They are awesome. They look incredible, and you can just feel the quality. They run quietly, with low vibrations and they spin 12x4.5 props on 4s without even warming up a little. I highly recommend them!
Quality
Value
Overall
Quality
Value
Overall
Excellent well balanced motor, although it states 4-6s I have been using this with 2x 5000mah 3s @ 11.1v batteries on a Tarot 650 with 12x5 and 13x5 props.
I get around 35-45 minutes flight time with the 12x5 carbon props.

Quality
Value
Overall
Quality
Value
Overall
Moteur idal pour le Tarot 650, utilis avec des 13x4 ou 12x4.5, son agrable et bien quilibrs.

A acheter les yeux ferms!
Quality
Value
Overall
Quality
Value
Overall
Excellent motor! Best for the Tarot Iron Man 650 Quad!! Very smooth running on 13x4 CFK props!
Quality
Value
Overall
Quality
Value
Overall
Did some testing today. All on 4S with an Afro 30Amp ESC.
Max prop is 12x3.8 APC 426.9Watt, 26.9Amp, 15.8V. A bit over 400Watt. Is no problem on a quad.
Sound is good. Motor is very quite and rather good ballanced out of the box.
Also tried an APC 11x4.7. It ran at max throttle with 336.8Watt, 21.1Amp, 15.8Volt.
So my choise is a 12X3.8 APC
Can't Judge about quality. It's brand new. See how it takes.
Bye! Hope you can use this!

Quality
Value
Overall
Upload
Videos
Upload video
Upload
Files

Somente usuários registrados podem fazer o upload de arquivos. Por favor Registre-se para que você possa começar a ajudar seus colegas de hobby hoje ainda!

Combine

essential items and
acc

Etiquetas de Produtos

Utilize um espaço para separar as etiquetas. Utilize aspas simples (') para frases.