Registar

Product Finder

Definições

Useful links

Bate-papo ao vivo
 
[["US","AU","GB","DE"]]
Registar
Shipped From:
  • USA
  • International (Hong Kong)

4112-320KV Turnigy Multistar 22 Pole sem escova Multi-rotor do motor com as ligações extra-longas

4112-320KV Turnigy Multistar 22 Pole sem escova Multi-rotor do motor com as l...

QTY:

Now save guardar 0,00 € 0,00 €

35,22 €
Stock:
Peso:
213 g
SKU:
9392000033-0

Suggestion Box

Please let us know if you found any issues with this product listing.
We take our customer comments very seriously and in many cases our website modifications and product updates are a result of your comments!

Price War

If you've seen a product elsewhere for a better price, please let us know! HobbyKing pride themselves on offering the best price, so if there if you see something cheaper elsewhere, let us know!

Combine

essential items and
acc
Descrição
do

Olhando para o sistema de energia final para o seu próximo projeto Multi-rotor? Não procure mais!
Os OutRunners Turnigy Multistar são projetados com uma coisa em mente - maximizando o desempenho Multi-rotor! Eles apresentam high-end 45SH ímãs, rolamentos NMB alta qualidade e altos números de pólos para menos ruído, potência suave e responsiva e aumento da eficiência. Eles têm de montagem do motor de costume e todos são precisão equilibrada para um funcionamento suave, estes motores são projetados especificamente para uso multi-rotor e não são baseados em motores de avião.

O 4112-320KV MultiStar é quase demasiado bom para voar! O acabamento e detalhes em este motor está em um nível totalmente novo. É equipado com rolamentos NMB shimmed e pré-carregado e tem 570mm fios de silício formando do segundo longos. Ele tem dupla hélice de montagem, ou um parafuso no hub eixo prop 6mm ou o parafuso 12 milímetros espaçamento jogou anexo prop com uma precisão arruela de encosto superior para uma gama ilimitada de adereços. E com 22P24S pólo contar sua suave eficiente e tem cargas de torque.

Multistar está simplificando o mundo da Multi-Rotores com a sua finalidade construída linha de produtos e tomar o trabalho da suposição fora de sua configuração.

especificações:
KV (RPM / V): 320
Células Lipo: 4-8s
Max Watt: 660W
Max Amps: 20A
Sem carga Corrente: 0.5A / 10V
Resistência interna: .172ohm
Número de polos: 22P24S (22poles 24 estatores)
Dimensões (Dia.xL): 46,6 x 29,8 mm
Motor Shaft: 5mm
prop eixo: parafuso de 6mm em hub ou 12 milímetros buraco em buraco de parafuso atirou adereços estilo
Peso: 147 g
espaçamento furo passante: * 25 milímetros 19 milímetros

Product
Specifications

Características do Produto

  • SKU:
    9392000033-0
  • Brand:
    MultiStar
  • Peso ( g )
    213.00
  • Comprimento
    85.00
  • Largura:
    45.00
  • Altura:
    60.00
  • Kv ( rpm / v )
    320.00
  • Correntes Max (A)
    20.00
  • Potência (W):
    660.00
  • Comprimento B (mm):
    30.00
  • Pode Comprimento D (mm)
    15.00
  • Max Tensão ( V)
    0.00
  • Shaft A ( mm):
    5.00
  • Unit Weight (g):
    147
  • Diâmetro C ( mm )
    47.00
  • Comprimento Total E ( mm)
    40.00
  • Resistência (MH ):
    0.00
Community
Discussions
Rate&
Review

Escreva a sua análise

Only registered users can write reviews. Please, sign in or sign up

verified_user Quality
trending_up Value
playlist_add_check Overall
You can't touch these for 40 bucks. I have more than 3 dozen flying in a bunch of different frames and NONE have ever failed. Take a 680 pro Tarot frame, 6 of these, 6 opto 45 amp esc's and a 5000 mah nano-tech battery, 14x5.5 props and it gets 19 minutes of time flying, not hovering. Even with a gimbal, it still gets close to 15. It would run much larger props but not on this frame, 14 is it. They will lift most anything and 8 of them on a 1140mm frame makes a super stable photography platform. With a WooKong controller and a decent camera, hollyweird quality pictures. Just right KV for 6S. Runs way under 90 degrees F. Easy on esc's. Work great on a split power system at 8S. So far everything we have tried has worked. I have sunnysky and T-motors as well as DJI, all good, all more expensive and none lasted any longer or performed better. You could say we like these!
verified_user Quality
trending_up Value
playlist_add_check Overall
verified_user Quality
trending_up Value
playlist_add_check Overall
I have purchase much more expensive outrunners in the past. Six of these with 16x5.5 props EASILY lifts my 1203mm hex (custom built) at 6.6kg. With 2 Zippy 8000mah batts I get 15 to over 20 mins. of time in the air. I will be testing 4 Turnigy-nano 5000 mah batts. (total weight less than the Zippys). Should get more time in the air. 4 hard test flights and the motors are performing very well. Just slightly warm to the touch after 15 mins.
verified_user Quality
trending_up Value
playlist_add_check Overall
verified_user Quality
trending_up Value
playlist_add_check Overall
Very strong motor! Great for big projects using 6s.
The main concern is about the build process. After using this motors I figure out that some vibration sounds that I was listening, is because some washer was not in the right place making the external part of the motor jump up and down causing the noise.
If you have this motor MAKE SURE to check the internal washers. In all of my 6 motors, 5 of them was missing whashers or they were not in the right place!
verified_user Quality
trending_up Value
playlist_add_check Overall
verified_user Quality
trending_up Value
playlist_add_check Overall
Two out of four failed within 2 hours of flight. Loose magnets on one and improper shimming on the other. HK is sending me replacements when they get back in stock. When working correctly they can lift a house.
verified_user Quality
trending_up Value
playlist_add_check Overall
Upload
Videos
Upload video
Upload
Files

Somente usuários registrados podem fazer o upload de arquivos. Por favor Registre-se para que você possa começar a ajudar seus colegas de hobby hoje ainda!

Combine

essential items and
acc

Etiquetas de Produtos

Outros marcaram este produto com as seguintes etiquetas:

Utilize um espaço para separar as etiquetas. Utilize aspas simples (') para frases.