Зарегистрируйтесь

Product Finder

Настройки

Useful links

Живой чат
 
[["US","AU","GB","DE"]]
Зарегистрируйтесь
Shipped From:
  • Global

4108-600KV Turnigy Multistar 22 полюс Бесщеточный Multi-Ротор двигателя с удлиненными проводами

4108-600KV Turnigy Multistar 22 полюс Бесщеточный Multi-Ротор двигателя с удл...

QTY:

Now save сэкономь 0,00 руб. 0,00 руб.

2 099,95 руб.

OR

Stock:
Вес:
169 g
Артикул:
9392000032-0

Suggestion Box

Please let us know if you found any issues with this product listing.
We take our customer comments very seriously and in many cases our website modifications and product updates are a result of your comments!

Война цен

If you've seen a product elsewhere for a better price, please let us know! HobbyKing pride themselves on offering the best price, so if there if you see something cheaper elsewhere, let us know!

Combine

essential items and
acc
Описание
товара

В поисках конечной системы питания для вашего следующего проекта Multi-ротора? Нет необходимости искать дальше!
В OutRunners Turnigy MULTISTAR разработаны с одной вещью в виду - максимального повышения производительности Multi-ротор! Они имеют высокого класса 45SH магниты, подшипники NMB высокого качества и высоких столбах рассчитывает на меньшем уровне шума, и плавность мощности и повышения эффективности. Они имеют настраиваемый монтаж двигателя и все точности сбалансированы для плавного хода, эти двигатели разработаны специально для использования мульти-ротора и не основаны на самолете двигателей.

4108-600 MULTISTAR почти слишком хорошо, чтобы летать! Качество изготовления и детали в этом двигателе находится на совершенно новом уровне. Он оснащен подкладками и предварительно нагруженных подшипников NMB и имеет 570mm длинный высокий град кремниевых проволок. Он имеет двойную опору крепления, либо болт на 6мм вал опоры ступицы или болт толщиной 12 мм расстояние между кинул опору крепления с прецизионным верхней упорной шайбой для неограниченного круга реквизита. И с 22P24S полюса рассчитывать ее гладкой эффективной и имеет нагрузок крутящего момента.

Multistar упрощает мир Multi-роторы с их специально построенной производственной линии и принимая догадок из вашей установки.

Технические характеристики:
KV (RPM / V): 600
Lipo клетки: 4-6s
Максимальный ток: 400w
Max Amps: 26A
Нет ток нагрузки: 0.9A / 10V
Внутреннее сопротивление: .098ohm
Количество полюсов: 22P24S (22poles 24 статоров)
Размеры (Dia.xL): 47 х 26мм
Вал двигателя: 4 мм
проп вал: 6мм болт ступицы или 12 мм отверстие , чтобы отверстие для болта бросил реквизита стиль
Вес: 111g
Расстояние отверстий: 19мм * 25мм

Product
Specifications

Дополнительная информация

  • Артикул:
    9392000032-0
  • Brand:
    MultiStar
  • Вес ( г )
    169.00
  • длина
    85.00
  • ширина:
    45.00
  • Высота:
    60.00
  • Kv ( об / об)
    600.00
  • Max Токи (A)
    26.00
  • Мощность (Вт ):
    400.00
  • Длина В ( мм ):
    26.00
  • Может Длина D (мм )
    12.00
  • Максимальное напряжение (В )
    0.00
  • Вал А ( мм):
    4.00
  • Unit Weight (g):
    111
  • Диаметр С ( мм )
    47.00
  • Общая длина E (мм )
    37.00
  • Сопротивление ( тк ):
    0.00
Community
Discussions
Rate&
Review

Напишите ваш собственный отзыв

Only registered users can write reviews. Please, sign in or sign up

verified_user Quality
trending_up Value
playlist_add_check Overall
These are probably some of the best motors you can get at this price point. I didn't see the part where it said extra long leads, so I got a nice amount of silicone wire as well after I clipped most of it off. Using these with 13x5.5 props, Tarot 680 Pro and on 2x5000Mah 4S batteries in parallel.
verified_user Quality
trending_up Value
playlist_add_check Overall
verified_user Quality
trending_up Value
playlist_add_check Overall
I can't get close to the efficiency shown in the tables in files tab. I made my own ones as you can see on "Prop Motor specs.pdf" in files tab. Maybe to bad propellers? Motors could be better balanced, you can feel some vibration without propellers and makes a very strong sound at low speeds. I bought 6 of them performing in the same way.
verified_user Quality
trending_up Value
playlist_add_check Overall
verified_user Quality
trending_up Value
playlist_add_check Overall
Quiet, smooth and powerful.
We'll see in the future if the bearings are on par with the rest! : )
verified_user Quality
trending_up Value
playlist_add_check Overall
verified_user Quality
trending_up Value
playlist_add_check Overall
I use these motors on a tricopter. Going to get 3 more to make a Y6. They are awesome. They look incredible, and you can just feel the quality. They run quietly, with low vibrations and they spin 12x4.5 props on 4s without even warming up a little. I highly recommend them!
verified_user Quality
trending_up Value
playlist_add_check Overall
verified_user Quality
trending_up Value
playlist_add_check Overall
Excellent well balanced motor, although it states 4-6s I have been using this with 2x 5000mah 3s @ 11.1v batteries on a Tarot 650 with 12x5 and 13x5 props.
I get around 35-45 minutes flight time with the 12x5 carbon props.

verified_user Quality
trending_up Value
playlist_add_check Overall
verified_user Quality
trending_up Value
playlist_add_check Overall
Moteur idal pour le Tarot 650, utilis avec des 13x4 ou 12x4.5, son agrable et bien quilibrs.

A acheter les yeux ferms!
verified_user Quality
trending_up Value
playlist_add_check Overall
verified_user Quality
trending_up Value
playlist_add_check Overall
Excellent motor! Best for the Tarot Iron Man 650 Quad!! Very smooth running on 13x4 CFK props!
verified_user Quality
trending_up Value
playlist_add_check Overall
verified_user Quality
trending_up Value
playlist_add_check Overall
Did some testing today. All on 4S with an Afro 30Amp ESC.
Max prop is 12x3.8 APC 426.9Watt, 26.9Amp, 15.8V. A bit over 400Watt. Is no problem on a quad.
Sound is good. Motor is very quite and rather good ballanced out of the box.
Also tried an APC 11x4.7. It ran at max throttle with 336.8Watt, 21.1Amp, 15.8Volt.
So my choise is a 12X3.8 APC
Can't Judge about quality. It's brand new. See how it takes.
Bye! Hope you can use this!

verified_user Quality
trending_up Value
playlist_add_check Overall
Upload
Videos
Upload video
Upload
Files

Only registered users can upload files. Please log in or register to start helping your fellow hobbyists today!

Combine

essential items and
acc

Метки товара

Другие пользователи отметили этот товар следующими метками:

Используйте пробелы для отделения меток. Используйте одинарные кавычки (') для фраз.