Register

Product Finder

Settings

Useful links

Live Chat
 
[["US","AU","GB","DE"]]
Register
Shipped From:
  • Global

3508-700KV Turnigy Multistar 14 Pole Brushless Multi-Rotor Motor With Extra Long Leads

3508-700KV Turnigy Multistar 14 Pole Brushless Multi-Rotor Motor With Extra L...

QTY:

Now save save $0.00 $0.00

$33.79
Rating:
Stock:
Weight:
157 g
SKU:
9392000024-0

Suggestion Box

Please let us know if you found any issues with this product listing.
We take our customer comments very seriously and in many cases our website modifications and product updates are a result of your comments!

Price War

If you've seen a product elsewhere for a better price, please let us know! HobbyKing pride themselves on offering the best price, so if there if you see something cheaper elsewhere, let us know!

Combine

essential items and
acc
Product
Description

Looking for the ultimate power system for your next Multi-rotor project? Look no further!
The Turnigy Multistar outrunners are designed with one thing in mind - maximizing Multi-rotor performance! They feature high-end 45SH magnets, high quality NMB bearings and High Poles counts for less noise, smooth and responsive power and increased efficiency. They have custom motor mounting and all are precision balanced for smooth running, these motors are engineered specifically for multi-rotor use and are not based on airplane motors.

The 3508-700KV MultiStar is almost too nice to fly! The workmanship and detail in this motor is at a whole new level. It’s fitted with shimmed and pre-loaded NMB bearings and has 570mm long high grad silicon wires. It has dual prop mounting, either a bolt on 6mm shaft prop hub or the 12mm spacing bolt threw prop attachment with a precision upper thrust washer for an unlimited range of props. And with 14P12S pole count its smooth efficient and has loads of torque.

Multistar is simplifying the world of Multi-Rotors with their purpose built product line and taking the guess work out of your setup.

Specs:
KV(RPM/V): 700
Lipo cells: 3-4s
Max current: 360w
Max Amps: 28A
No Load Current: 0.5A/10v
Internal Resistance: .083ohm
Number of Poles: 14P12S (14poles 12 stators)
Dimensions(Dia.xL):43 x 26mm
Motor Shaft: 4mm
prop shaft: 6mm bolt on hub or 12mm hole to hole for bolt threw style props
Weight: 102g
bolt hole spacing: 19mm * 25mm

Product
Specifications

Additional Information

  • SKU:
    9392000024-0
  • Brand:
    MultiStar
  • Shipping Weight(g)
    157.00
  • Length
    85.00
  • Width:
    45.00
  • Height:
    60.00
  • Kv(rpm/v)
    700.00
  • Max Currents (A)
    28.00
  • Power (W):
    360.00
  • Length B (mm):
    26.00
  • Can Length D(mm)
    10.00
  • Max Voltage(V)
    0.00
  • Shaft A(mm):
    4.00
  • Unit Weight (g):
    102
  • Diameter C(mm)
    42.00
  • Total Length E(mm)
    36.00
  • Resistance (mh):
    0.00
Community
Discussions
Rate&
Review

Write Your Own Review

Only registered users can write reviews. Please, sign in or sign up

verified_user Quality
trending_up Value
playlist_add_check Overall
This motor is pretty good and proper KV for 600-700 class Multicopter.
I installed this in my Tarrot 650 X-copter. with 12x4.5 and 11x4.5 APC prop.
Both setting of them works well. But 12-inch prop is better, It's more power.
I uses Hobbywing X-Rotor ESC - 40amp. Because it has connector on it's board, it's well fit with this motor's long load(it's good point also).
But, I think the quality of the bearing is quite poor. Some fall-off make the bearing get bad. But I recommend this motor for the 600-700 class multicopter strongly.
It's quite good.
verified_user Quality
trending_up Value
playlist_add_check Overall
verified_user Quality
trending_up Value
playlist_add_check Overall
very nice motors. Running on a 2300grams tarot 690 hexa. 3s and 13x5.5 propps. current is 20-27amps hovering in very windy weather.
got 12 mins on 6000mah 3s

I have been using Afro esc. Got sync issue on one esc and had to reflash to the latest 2013-10-.. firmware. Now i got 30 minutes in the fram from schratch build and all working very well!
verified_user Quality
trending_up Value
playlist_add_check Overall
verified_user Quality
trending_up Value
playlist_add_check Overall
No mounting screws, that's a bit strange. Every other motor I have purchased from Hobbyking includes them so didn't thinks twice. With hindsight I should have picked it up from the photos. Hindsight is a wonderful thing.
verified_user Quality
trending_up Value
playlist_add_check Overall
Upload
Videos
  • MultiStar Motors

Upload video
Upload
Files

Only registered users can upload files. Please log in or register to start helping your fellow hobbyists today!

Customer files
3508-700kv thrust data download now [169kb]

Combine

essential items and
acc

Product Tags

Other people marked this product with these tags:

Use spaces to separate tags. Use single quotes (') for phrases.