Register

Product Finder

Settings

Useful links

Live Chat
 
[["US","AU","GB","DE"]]
Register
Shipped From:
  • Global

4112-485KV Turnigy Multistar 22 Pole Brushless Multi-Rotor Motor With Extra Long Leads

4112-485KV Turnigy Multistar 22 Pole Brushless Multi-Rotor Motor With Extra L...

QTY:

Now save save $0.00 $0.00

$41.35

OR

Rating:

Stock:
Weight:
212 g
SKU:
9392000035-0

Suggestion Box

Please let us know if you found any issues with this product listing.
We take our customer comments very seriously and in many cases our website modifications and product updates are a result of your comments!

Price War

If you've seen a product elsewhere for a better price, please let us know! HobbyKing pride themselves on offering the best price, so if there if you see something cheaper elsewhere, let us know!

Combine

essential items and
acc
Product
Description

Looking for the ultimate power system for your next Multi-rotor project? Look no further!
The Turnigy Multistar outrunners are designed with one thing in mind - maximizing Multi-rotor performance! They feature high-end 45SH magnets, high quality NMB bearings and High Poles counts for less noise, smooth and responsive power and increased efficiency. They have custom motor mounting and all are precision balanced for smooth running, these motors are engineered specifically for multi-rotor use and are not based on airplane motors.

The 4112-485KV MultiStar is almost too nice to fly! The workmanship and detail in this motor is at a whole new level. It’s fitted with shimmed and pre-loaded NMB bearings and has 570mm long high grad silicon wires. It has dual prop mounting, either a bolt on 6mm shaft prop hub or the 12mm spacing bolt threw prop attachment with a precision upper thrust washer for an unlimited range of props. And with 22P24S pole count its smooth efficient and has loads of torque.

Multistar is simplifying the world of Multi-Rotors with their purpose built product line and taking the guess work out of your setup.

Specs:
KV(RPM/V): 485
Lipo cells: 4-8s
Max current: 700w
Max Amps: 28A
No Load Current: 1.1A/10v
Internal Resistance: .09ohm
Number of Poles: 22P24S (22poles 24 stators)
Dimensions(Dia.xL):46.6 x 29.8mm
Motor Shaft:5mm
prop shaft: 6mm bolt on hub or 12mm hole to hole for bolt threw style props
Weight: 147g
bolt hole spacing: 19mm * 25mm

Product
Specifications

Additional Information

  • SKU:
    9392000035-0
  • Brand:
    MultiStar
  • Weight(g)
    212.00
  • Length
    85.00
  • Width:
    45.00
  • Height:
    60.00
  • Kv(rpm/v)
    485.00
  • Max Currents (A)
    28.00
  • Power (W):
    700.00
  • Length B (mm):
    30.00
  • Can Length D(mm)
    15.00
  • Max Voltage(V)
    0.00
  • Shaft A(mm):
    5.00
  • Unit Weight (g):
    147
  • Diameter C(mm)
    47.00
  • Total Length E(mm)
    40.00
  • Resistance (mh):
    0.00
Community
Discussions
Rate&
Review

Write Your Own Review

Only registered users can write reviews. Please, sign in or sign up

Be the first to review this product

Upload
Videos
Upload video
Upload
Files

Only registered users can upload files. Please log in or register to start helping your fellow hobbyists today!

Combine

essential items and
acc

Product Tags

Use spaces to separate tags. Use single quotes (') for phrases.